Cup-lock Scaffolding Used for High-rise Building, Best Prices and Great Reputation

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Main Intriduction of Cup-lock Scaffolding:

 

  • Name: Cup Lock Scaffolding

  • Category: Scaffolding system

  • Material: Steel (Q235/Q345)

  • Size: as your requirement

  • Application: 
  • Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering 

  • Simple structure:

    The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.

  • Safety and Steady:

    The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.

  • Multi using:

    According to the specific construction, Cup Lock Scaffolding could be assembled into one or two row with different size, it could also be used for multi construction tools, such as supporting frame, supporting column, materials lifting frame, stage supporting, etc.

2. The Advantages of Cup-lock Scaffolding:

  • Easy assembly, time and labor saving. 

  • High load-carrying capacity.

  • Adaptable to various construction projects.

  • All elements safely connected

  • Highly durable

     

3. Images for Cup-lock Scaffolding:

 

Cup-lock Scaffolding Used for High-rise Building, Best Prices and Great Reputation

 

Cup-lock Scaffolding Used for High-rise Building, Best Prices and Great Reputation

Cup-lock Scaffolding Used for High-rise Building, Best Prices and Great Reputation

 

 4. FAQ

  • How to guarantee the quality of the products

    We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

  • Packing & Delivery

    Export standerd package or as customer's requirements.

  • Why Choose us?

    Delivery Detail:

    10-25 days after receipt of payment.

    We are  the biggestmanufacturer on formwork andscaffolding accessories in China.

    We have more than 40 years experience on manufacturing and exporting.

     

    We have the excellent quality control.

     

    We have the competitive price.

    We have the completed sales and service team so that we can offer the best service.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scaffold piercing still throbing?
Ear cartilage piercings generally take longer to heal than lobe piercings. This is often due to a combination of things, such as the location of the piercing in the cartilage, the type of jewellery used and the tension that jewellery creates to the structure of the cartilage. Using biocompatible plastics (like PTFE), cleaning cartilage regularly, and increasing your intake of minerals will certainly benefit your piercing; however a piercing will almost always be doomed to failure if improper jewellery and poor planning are used and left unmonitored.
Q:Steel pipe scaffold scaffolding components which are composed of
Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure, and can be roughly divided as follows:
Q:Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
The welding rod is welded on the transverse rod and the diagonal rod, and the transverse rod and the inclined rod are inserted into the lower bowl buckle when the assembly is assembledA bowl type steel tube scaffold column horizontal distance is 1.2 m, the vertical distance according to the load of scaffold is 1.2 m; 1.5 m; 1.8 m; 2.4 m, step away from 1.8 m and 2.4 M. when erecting pole connecting joints should be staggered, staggered first layer vertical rod 1.8 m long and 3 m the vertical bar,
Q:The Scarlet Letter scaffold scenes?
concentration your interest on who's on the scaffold, how they react to the standard public shaming, and what the reader learns with regard to the character from analyzing the define of them on the scaffold.
Q:scaffold piercings! HELP PLEASE!?
Take it out, let it heal and get it done at a better time. Either that or fail gym. Taking it out and putting it back in every day isn't really an option.
Q:After Care for Tragus, Cartlidge and Scaffolding Piercings?
Okay I have my tragus and my cartlidge pierced. I got those two in one sitting, which I regret because the healing process was HORRIBLE. For surely you should ICE them! A LOT! It helps so much with swelling. Also, they should have given you anti-bacterial stuff.. Use that as often as possible! And also remember to move the jewelry around so it doesn't get all crusty and stuck... Good luck!
Q:I am traveling to Buenos Aires in August. Are most of the major monuments under scaffolding now?
Hello. You can see most of everything. Not too many buildings in Restoration. The City looks well now . But Buenos Aires and generally Argentina are a mix of things. You visit Argentina and Buenos Aires for Monuments, Food, Culture, Dance and People. So....Enjoy Argentina and have fun
Q:The combination form of bowl buckle type common scaffold?
High 30m below the scaffold verticality deviation should be controlled within 1/200, high 30m above the scaffolding should be controlled in 1/400~1/600, the total height deviation should not be greater than 100mm.
Q:Wheel buckle scaffolding rental price
Each region is not the same price, the lease is not the same.
Q:I can get a scaffold piercing bar out of my ear HELP!?
Stop sleeping on it and stop trying to pull it out - you're just going to irritate it doing that. If you feel you need new jewelry, go to your piercer. They can help you out.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range