Cup-lock Scaffolding with Best Prices and Great Reputation

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
3000000 pc/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings.used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Cup-lock Scaffolding


.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal

3.   Cup-lock Scaffolding Images

4.   Cup-lock Scaffolding Specification

.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

.5 times fast of adapter plug assembly and disassembly than normal

.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

 

5.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2)  What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for the broken seam connection of bowl buckle scaffold. For example, both sides of the seam on the vertical pole is very neat, with steel pipe
According to your description, I guess you use a different length of the vertical pole, or the use of ordinary steel pipe mixing bowl buckle scaffold. If the use of uniform specifications of the bowl buckle steel pipe should not be your problem.
Q:when there is an alternative route to my back garden to put up scaffolding,?
Call your lawyer.
Q:can u do a scaffold piercing yourself?
NO 1 you dont have a hollow needle, with out one its not gonna make a hole by taking out the piece ear you wont pierced its just gonna push it over that thats gonna have it way easyer for infection 2 thats around alot of nerve you kinda have to know what your doing 3 even if you do know what your doing once you get it through the 1st hole your gonna want to stop cuz of the pain and you wont be albe to position yourself you way a professional would in order to be able to get it done fast 4 its really easy to get an infection with any piercing epically if its not done properly by a professional trust me i have seen some really nasty stuff wake into the shop asking for help and most of them all did it them selfs
Q:Significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
it's been a while, but i think it's significant b/c its foreshawdoing. she later ends up dying on the scaffolds. also, i think she is looking down on everyone and seeing them as sinners, while later the tables will be reversed as they all look down on her for commiting adultery
Q:Pankou galvanized scaffolding is very beautiful, I would like to ask the material and the characteristics of this shelf
Along with the new Pankou scaffolding erection characteristics of the rapid rise in the rapid support system in how to install?First we look at the popularity of related knowledge, also known as scaffolding, disc type, pin type scaffold, Rhea frame called in foreign countries, according to their use can be divided into two types of formwork support and scaffolding. At present, the domestic application is more common template support, as well as the decoration of the operation of the rack. We use the Tianjin nine Industrial Company Limited production of the socket type scaffold, for example:
Q:can I claim compensation for falling of scaffolding and breaking my arm?
If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.
Q:I am looking for a letter scaffold (to the editor)?
Letter To The Editor Scaffold
Q:Cost of rent per day per month per ton of scaffolding
, so it is difficult to make it clear here, to see where you are in which company rented
Q:Specification for bowl buckle scaffold for construction
JGJ130-2001 is the construction of steel tubular scaffold safety technical specifications in the second half of the new version JGJ130-20112011 December 1st implementation
Q:A brick is dropped from a high scaffold. What is its velocity after 2.9 s?
v = u + at u = 0; a = 9.8m/s2 t = 2.9s v = 0 + 9.8 * 2.9 = 28.42m/s

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range