Cup Lock Scaffolding with Good Quality
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg/m²
- Supply Capability:
- 10000 kg/m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of cup lock Description:
cup lock system is one of the most popular used scaffolding system in the world.It is consisted of cup lock,vertical,ledger,limit pins,blades and base etc.
Packaging & Delivery
Packaging Details: | Pallet or bag or upon client's request |
Delivery Detail: | 35days |
2.Main Features of cup lock:
1) Using less pipes
2) Easy to install
3) It can be used again and again for nearly 20years
3.Cup lock product pictures:
4.Cup lock Product Description
Type: | ringlock scaffolding diagonal Brace |
specification | Ø48.3×3.20 |
material: | steel Q235 |
Finished | Hot DIP galvanized, painted |
Diagonal length(m) | Weight(kg) |
0.9m * 1.25m | 6.28 |
1.25m * 1.8m | 8.6 |
1.25m * 2.7m | 11.45 |
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
1) How many Scaffolding your company have?
Here comes our 5 types of Scaffolding systems:
-Cup lock Scaffolding(C-Lock Scaffolding)
-Ring lock Scaffolding
-Kwistage Scaffolding
-H-frame Scaffolding
-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.
2) How long can we receive the product after purchase?
Lead time is about 30days after getting the signed PI and deposit
- Q: What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
- (2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The entire frame cannibalize speed is 3 ~ 5 times faster than conventional, faster effort to fight demolition, workers with a hammer to complete all assignments, to avoid the inconvenience caused by bolt operation; (3) with strong: the main components are the ordinary steel tubular scaffolding steel pipe, steel pipe connecting fastener with general availability in general, strong.
- Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- The general price of 3800-4200 yuan per ton, you need to see the material and specifications.1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-
- Q: Fastener type steel pipe scaffold accessories
- Wall pieceEven the wall piece the upright rod is connected with the main structure together, available steel tube, fastener or embedded part. Rigid wall, also can be used as a flexible reinforced wall connecting piece of the tie bar.
- Q: Fastener type steel pipe scaffold composed of two components? What are the roles?
- 2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
- Q: Can you identify Scaffold Grade Aluminum tubing by looking at it.?
- The grade or type of Aluminum Alloy materials can not be identified visually because they are almost all the same in appearance. Normally these materials are marked with there Alloy number or designation like, 6061- T6, at certain intervals so that users can distinguish them.
- Q: I got my scaffold piercing 6 days ago, with titanium, and it was fine until yesterday.I had a couple of nights out and might have knocked it a few times, but yesterday it was swollen, red, throbbing and very painful. There is no liquid coming from it. It seems to have got worse today.I have been following the aftercare advice and cleaning it several times a day with rock salt solution and (up until yesterday) savlon antiseptic spray. Is it just irritated or is it infected? How long should I wait before I go to the doctor? If it is infected, will I have to take it out or just take antibiotics?Thanks!
- It's irritated. If it was infected, it would be oozing green or yellow gunk:) If it gets to that point, go to the doctor. Until then, just treat is regularly with salt solution:) Hope this helped!
- Q: i had my scaffold piercing done in the summer holidays and wen i went back to school (currently in my last year) they told me to take it out so i had to go back to the piercer. They changed the bar to two clear retainers in the holes so they wouldn't heal, now it hurts all the time and is red with a bubble on the top of my ear, any suggestions as to what i should do? :/
- try drying it out with sea salt soaks, tea tree oil, aspirin paste (crushed aspirin and water) , chamomile tea bag soaks !!! keloids are unpredictable , you can get them anytime from changing the jewelry early, irritation, bumping it on stuff or accidentally yanking it , and they will either stay or go away !!! you can prevent infections by cleaning the piercing regularly with anti bacterial soap and sea salt soaks , making sure to use clean hands when handling the piercing and not letting anyone touch the piercing
- Q: What are the common rules for calculating the amount of scaffolding works
- General rules for the calculation of scaffolding:Masonry works (including building blocks) are higher than 1m when calculated by external scaffolding. Independent column height of less than 3.6m according to the core of the core of the circumference of the height of the calculation of the height of the project; the height of more than 3.6m of the column core circumference plus 3.6m multiplied by the actual height of the project to calculate the amount of masonry.
- Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q: Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
- 3 products have a high degree of economic, the use of more convenient and efficient in use, only need to put the plug into the hole of the ends of the cross rod pole corresponding, and then knock tightly, the quality of the demolition ride fast and overlapping is the traditional scaffold cannot do. Its erection speed is 4-8 times more than 2 times that of steel pipe scaffold. Reduce labor time and labor remuneration, reduce shipping costs to reduce the overall. The joint is reasonable in structure, easy in operation, light and handy. Vertical rod weight than the same length of the size of the bowl buckle 6-9%.
Send your message to us
Cup Lock Scaffolding with Good Quality
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg/m²
- Supply Capability:
- 10000 kg/m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords