New Design ID 15 Tower Scaffolding with Great Price
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 1000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of ID 15 Scaffolding Description:
ID 15 Scaffolding is designed for supporting the formwork system in construction, Can be used to be tower, it is popular in UAE.
2.ID 15 Scaffolding advantages:
ID 15 Scaffolding adapts flexible to any wall geometry
Fast due to pre-assembled panels with built-in plywood
Strong with 80 kN fresh concrete pressure per m2 allowed
Economical due to longer service life and fewer parts
Hire option given in selected regions
Hot selling ID 15 Scaffolding with low price
our scaffolding ID15 which is consists of base head,frame 133,frame 100,end frame,diagonal).
and it's compatible with ID 15 perfectly.
It's easy to erect and fit in your work compared with conventional method, saving you 20% working time .
ID 15 Scaffolding Quick Details
Place of Origin: China (Mainland)
Brand Name: ID 15 Scaffolding
SCAFFOLDING: tower
Packaging & Delivery
Packaging Details: | iron packed |
Delivery Detail: | upon receipt of 30% of deposite after confirmed the order |
3.ID 15 Scaffolding Products pictures:
4.ID 15 Scaffolding Specification:
5.FAQ
We have organized several common questions for our clients, may help you sincerely:
1)How many Scaffolding your company have?
Here comes our 5 types of Scaffolding systems:
- Cup lock Scaffolding(C-Lock Scaffolding)
- Ring lock Scaffolding
-Kwistage Scaffolding
-H-frame Scaffolding
-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.
2)How long can we receive the product after purchase?
Lead time is about 30days after getting the signed PI and deposit.
- Q:Find the demolishing scheme of scaffold
- Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
- Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- 1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-9, 5, GB/T3091-200
- Q:by scaffolding ?
- It's a rhetorical question, maybe the girl is held up so well that it could have been something else holding her up there
- Q:I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
- A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
- Q:What are the characteristics of Pankou scaffolding
- Ottohelix, scaffolding has large load strength, under reasonable mechanics, with a capacity of up to 200KN.Pankou scaffolding saves the amount of steel.
- Q:what happened when author dimmesdale went to the scaffolding in town square?
- Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
- Q:along with this question, -what does she think about during this time period?-how does she apprear on the scaffold? -who does she see and how does she feel?THANKS!!=]
- Read the book and find out! I think she's up on the scaffold sometime in spring, but as I said, READ it and make sure.
- Q:How to solve the problem of scaffold pipe repair
- In the construction of the bending, torsional irregular steel tube to adjust the straight, mechanical transmission, reasonable structure, high efficiency, safe and reliable
- Q:From the Scarlet Letter, Ch. 10-12
- Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.
- Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
- The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
New Design ID 15 Tower Scaffolding with Great Price
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 1000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords