• Scaffolding Coupler/ Swivel Coupler/Double Coupler System 1
  • Scaffolding Coupler/ Swivel Coupler/Double Coupler System 2
  • Scaffolding Coupler/ Swivel Coupler/Double Coupler System 3
  • Scaffolding Coupler/ Swivel Coupler/Double Coupler System 4
  • Scaffolding Coupler/ Swivel Coupler/Double Coupler System 5
  • Scaffolding Coupler/ Swivel Coupler/Double Coupler System 6
Scaffolding Coupler/ Swivel Coupler/Double Coupler

Scaffolding Coupler/ Swivel Coupler/Double Coupler

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
200000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Scaffolding Coupler/ Swivel Coupler/Double Coupler 
Surface: electroplate,HDG
Material: Q235
Size:48.3mm
Weight:1.25kg

Item

German Type drop forged  Scaffolding Double Coupler







Material

Q235

Dimensions

 48.3mm

Weight

1.25kg

Surface

Hot-dip galvanization, electro galvanization

Standard

EN74B,EN74BB

Note

OEM service is available

MOQ

1000pieces

Package

in steel pallet ,carton, plywood case, or as your request  

Payment Terms

TT,L/C, we can contact in detail

Delivery Time

20-30days

 



Scaffolding Coupler/ Swivel Coupler/Double Coupler




Scaffolding Coupler/ Swivel Coupler/Double Coupler


Scaffolding Coupler/ Swivel Coupler/Double Coupler





Scaffolding Coupler/ Swivel Coupler/Double Coupler

Scaffolding Coupler/ Swivel Coupler/Double Coupler


Scaffolding Coupler/ Swivel Coupler/Double Coupler



We can supply many types of pressed and forged scaffolding couplers, such as swivel coupler, double coupler, sleeve coupler, putlog coupler, German type, British type, American type, Japanese type and  so on.




Scaffolding Coupler/ Swivel Coupler/Double Coupler

Scaffolding Coupler/ Swivel Coupler/Double Coupler

Scaffolding Coupler/ Swivel Coupler/Double Coupler

Scaffolding Coupler/ Swivel Coupler/Double Coupler






Rizhao Fast and Fasten Scaffold Co., Ltd. is a professional manufacturer and supplier of scaffolding systems, scaffolding couplers, and other related products. With good quality and competitive price, our products are very popular in European, Australia, North America, Mid-east, and South East Asia and some African countries.



 

Scaffolding Coupler/ Swivel Coupler/Double Coupler

Scaffolding Coupler/ Swivel Coupler/Double Coupler

Scaffolding Coupler/ Swivel Coupler/Double Coupler


Why choose Rizhao  Fast and Fasten  Scaffold Ltd?

·         Over 10 years' industry experience

·         Cover the whole of Wiltshire

·         We undertake both commercial and domestic scaffolding

·         First class and extremely safe service

·         Competitive rates

·         Free estimates, site visits and advice

·         Provide references upon request

 


Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
The general price of 3800-4200 yuan per ton, you need to see the material and specifications.1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
To cover your A** in case of injury or an inspection.
Q:I couldn't believe it, but yes it happened...
With God all things are possible.
Q:what happened when author dimmesdale went to the scaffolding in town square?
Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:i have now got lumps on my scaffolding and i have searched and it seems to be normal.. i just want to know how to get rid? any ideas? :)
A scaffold piercing should not be done with a single long bar. Go back to your piercer, or to another one and ask them to change it to two short bars, this will take the pressure off the tissue. Then you should buy some cotton cosmetic pads. Fill up a mug with boiling water from the kettle, soak a cotton pad in the water, squeeze out most of the water but not all of it, have it as hot as you can stand and hold it onto the lump. The lump is likely filled with lymph and this will encourage it to drain. Do this for about two weeks. If the lump still hasn't gone away either go back to the piercer or go see a doctor. To the person that said it shouldn't be done with the two shorter bars. Yes, I know many people who have had it done with one bar and have been fine, but I know plenty of people with horror stories. My ear could not cope with the one bar and wasn't draining properly even with regular sea salt soaks. One of my piercings has migrated slightly but I'm confident that my piercer will be able to put my long bar back in for me.
Q:What are the components of a mobile scaffolding
The main parts of the door type scaffolding are the basic structure of the door frame, the cross support, the connecting rod, the hanging button type foot board or the horizontal frame, the lock arm, etc.
Q:Fastener type steel pipe scaffold composed of components
Fastener type steel pipe scaffold, mainly by the cross bar, vertical pole, fasteners (commonly used is the rotation button, right angle button, connecting rod), foot board, etc.
Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:What are the common rules for calculating the amount of scaffolding works
General rules for the calculation of scaffolding:Masonry works (including building blocks) are higher than 1m when calculated by external scaffolding. Independent column height of less than 3.6m according to the core of the core of the circumference of the height of the calculation of the height of the project; the height of more than 3.6m of the column core circumference plus 3.6m multiplied by the actual height of the project to calculate the amount of masonry.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords