• Scaffolding Sleeve Coupler/External Joiner System 1
  • Scaffolding Sleeve Coupler/External Joiner System 2
  • Scaffolding Sleeve Coupler/External Joiner System 3
  • Scaffolding Sleeve Coupler/External Joiner System 4
Scaffolding Sleeve Coupler/External Joiner

Scaffolding Sleeve Coupler/External Joiner

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Standard:
EN74,BS1139
Place of Origin:
Shandong, China (Mainland)
Finish:
Electro galvanized
Technic:
pressed
Item:
Scaffolding Sleeve Coupler/External Joiner
Size:
48.3mm
Material:
Q235
Model Number:
SD-1021A
Brand Name:
SD
Weight:
1.00KG

Scaffolding Sleeve Coupler/External Joiner

 

Product Description

 

 1.Item:      Scaffolding Sleeve Coupler/External Joiner

 2.size:48.3mm;

3.material :Q235;

4.standard : EN74,BS1139

5.ISO 9001:2000 is approved;

6.OEM service is available.

 

 

Commodity name

      Scaffolding Sleeve Coupler/External Joiner

Usage

Fixed Scaffold Pipe

Origin

China Mainland

Material

Q235

Process

Forging

Surface

Electro-galvanized

M.O.Q

2000PCS

Packing

Woven bags + steel pallet

Delivery time

20-25 days after order confirmation

Payment term

T/T, L/C, Western Union

Business type

Manufacturer and exporter

Certifications

SGS

Advantage

1.High Quality  2.Professional service 3.Competitive price

Notes

Special marks can be made according to customers requirements;


It is available to produce by customer drawing.

Main products

Different kinds of scaffold coupler, Ringlock scaffolding system, Cuplock Scaffolding System, Kwikstage scaffolding  system, shoring prop, formwork system, frame system, Accessories

Scaffolding Sleeve Coupler/External Joiner

                                               Scaffolding Sleeve Coupler/External Joiner

.jpg

                                                                      Scaffolding Sleeve Coupler/External Joiner


picture name surface treatmentweight
Scaffolding Sleeve Coupler/External JoinerSleeve coupler  electro galvanized 1.00kg
Scaffolding Sleeve Coupler/External JoinerSleeve coupler  electro galvanized1.20kg

  

 

Company Information

Scaffolding Sleeve Coupler/External Joiner

Scaffolding Sleeve Coupler/External Joiner

Scaffolding Sleeve Coupler/External Joiner

 

We are always focusing on to supply our value produce and best service to all our customers.

 


Q: What is a bowl buckle scaffold?
Compared with other types of scaffolding, bowl buckle type multifunctional scaffolding is a new scaffold with broad development prospects.
Q: i have my nose pierced and am thinking about getting a scaffold cartilage piercing, but am affraid because your cartilage is so tough! and i know it depends on the person when it comes to pain, but just compairing it to a nose piercing? (when i got my nose pierced i cried, but once they finished piercing it, i wasn't in anymore pain)
ive just had scaffolding done, and it was quite painful, far more painful than i was told. they just stab through your ear with a needle, but i didn't think it was that bad. not as bad as getting your nose done. but it was very sore and painful to touch for days after. hope this helps :) X
Q: hi guys i got my scaffold piercing a couple of days ago and it keeps bleeding on and off and there was dry blood but i removed it and its bleeding more what could i do step by step to keep total care of my piercing to get rid of all these problem please help it will really be appreciated
leave the dry blood let it heal be patient
Q: opinions on scaffolding piercing and how to hide it from school :)?
Why do you have to hide it? It's an ear piercing. And to hide it, just cover it with your hair.
Q: I plan to have a scaffolding or industrial piercing soon, but don't know where to go.Any suggestions and could you include the prices?x
Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
Q: According to the standard set up double scaffolding scaffolding to the number of meters per square meter
This is not necessarily the type you want to see the scaffold (open / closed) and set the height of the local wind.
Q: 21M high full scaffold erection scheme
dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
Q: Introduction of external scaffolding
Temporary structure frame for feeding, piling and construction work outside the outer wall of the outer wall for building construction. 1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.
Q: how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q: What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords