• scaffolding casting steel jack nut System 1
scaffolding casting steel jack nut

scaffolding casting steel jack nut

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Hebei China (Mainland)


Model Number:
SJN
Type:
Scaffolding Parts
Scaffolding Part Type:
Steel Jack Nut
Name:
Scaffolding Steel Jack Nut
Material:
Ductile cast iron
Diameter:
30mm/32mm/34mm/36mm/38mm/48mm
Weight:
0.25kg/0.3kg/0.4kg/0.5kg/0.55kg/1.0kg
Surface:
Glavanized

Packaging & Delivery

Packaging Detail:wooden pallet or big woven bags
Delivery Detail:7-25days

Specifications

Scaffolding Steel Jack Nut
1. Casting Jack Nut
2. OD30/32/34/36/38/48mm
3. Material: Ductile cast iron
4. Real factory


Q: I'm gonna be getting piercings this weekend, so i know im already getting my nose. but i want to get my ear. like barbell? so what's the difference between Scaffold and Industrial?
Nothing... The piercer will use an extra long barbell, most likely a 14 gauge.. too.
Q: What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q: According to the standard set up double scaffolding scaffolding to the number of meters per square meter
This is not necessarily the type you want to see the scaffold (open / closed) and set the height of the local wind.
Q: I sincerely ask you to help me, door scaffolding, build 30 meters high, without any reinforcement points of the construction program. Thanks, high marks!
1 in order to design and construct the steel pipe scaffold in the door, to carry out the relevant regulations of the state on safe production, and to realize the advanced technology, reasonable economy and safe application.
Q: ...and I'm not really sure what to expect. I know that everyones healing time and pain tolerence is different but just some personal storys would be nice. And before you say it I am aware that there are risks as there are risks with any piercing. so I'm 17 from London and wondering:How old do you have to be to get it done?Does anyone know a reputable place i can get it done?How much will it be?any experiences to share?
Hi I got it done a few months ago I love it! Its really not that sore at all just a slight nip and then bit warm afterwards lol! Only thing annoyed me was couldn't sleep on it for a while and that was always the side I slept on! I live in Belfast and you can get it done from about 16. I just went to a well known tattoo parlour and had no problems what so ever. Go for it looks great Good luck :D
Q: Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q: Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
Q: Was thinking of getting one. How much do they cost?
your okorder /... and they usually cost about 40$
Q: I got an industrial/scaffold piercing a few months ago and currently have captive bead rings in (The piercer put those in after he pierced it). The piercings are now healed enough for me to change the piercing, and I found an industrial bar on ebay which I'd really like to order. Only problem is, it has two choices on the gauge thickness and length, and I don't know which mine is.The gauge sizes available are 1.2mm (16g) or 1.6mm (14g) , and the length options are 32mm, 35mm, 38mm.Does anyone know which would be the best to get? Thanks.
Scaffold Bar

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords