Reliable Swivel Scaffolding Swivel Couplers
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details:
Place of Origin:Hebei China
Model Number: GTJ-002
Type: Scaffolding Parts
Material: Q235
Weight: 0.58kg to 0.65kg
Surface Treament: as your requirements
Packaging & Delivery:
Packaging Detail: CARTONS THEN ON PALLET,OR AS YOUR REQUEST.
Delivery Detail: WITH IN 25 DAYS
Product Information
Product Name | Japanese Type Swivel Scaffolding Couplers |
Type | GTJ-S002 |
Material | Q235 |
Thickness | 2.5mm or 3mm |
Weight | 0.58kg or 0.65kg |
Surface Treatment | Electroplate Galvanized |
Products’ standard | Fit for JISA8951 |
Dimensions | 48.6 x 48.6mm |
MOQ | 10000PCS |
Product feature | anti-rust, skid proof, high breaking strength |
Cup-lock Scaffolding Specification:
Packaging Detail: vinner case,20ft,21T/GP,by sea;or welded on the cup lock vertical then bundle on steel pallet or Customer needs.
Delivery Detail: 1 month after the contract or as customer's requirement.
GREAT REPUTATION CUP LOCK SCAFFOLDING
Three Year Warranty
Operating Friendly
Full Safety Devices
Provide OEM service
Reasonable price
FAQ of Ring-lock Scaffolding:
Consent Authority (BCA) for the issue of a Building Consent or a Code Compliance Certificate in relation to the Building Act 2004, as well as these Best Practice Guidelines, should be considered to ensure that all practicable steps are taken to assure the safety of the structures and of end users.
- Q:How to calculate the vertical force of scaffolding
- The maximum reaction force of the rod support is calculated, and the maximum bending moment and deformation are calculated under the most unfavorable load arrangement1 load calculation2 Calculation of bending strength: maximum bending moment calculation for large bar weight uniform load and load distribution of the bending moment and the most unfavorable value3 deflection calculation: the maximum deflection is considered as the calculation of the load distribution of the load and the load of the large span
- Q:They can see a good place to anchor it but they won't start to build the scaffolding. I've used different builders and tried different bits of the paths, but its just not working. What do I do?
- Hey love, I'll try to help but right now I'm pretty exhausted so it won't be my best. I am going to link a website that has tips and tricks, and hopefully you'll see something that fits. I hate when I get provided a link that doesn't though, so I also suggest posting to the forum on the website. Strategy guide may be a good place to start. They are all die hard fans, and always happy to help. I assure you your question will be answered very quickly once you sign up. I wish I could help more, but I was more of a VV2 player. If you don't get the help you need from the forum, edit and I will look when I am able to think. ;) Also, do you think it may be a glitch or just something your missing? If you emailed lastdayofwork, they might be able to suggest a patch if that's the issue. Good luck! :)
- Q:Scaffolding scaffolding erection norms which requirements, who can say?
- The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm
- Q:Latch type disc scaffolding accessories is a national patent product
- Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
- Q:so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
- well it depends because some bars are thicker than others, if your changing to a bar as thick as the one you have now then i say about a month is good but if its the slightest bit thicker i suggest you wait maybe 2 months and in the mean time make sure your turning it and wiggling it so after the 2 months go by you can change it to a thicker bar without it hurting
- Q:I plan to have a scaffolding or industrial piercing soon, but don't know where to go.Any suggestions and could you include the prices?x
- Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
- Q:Hi(: My names Tasha, and I love piercings. (I have 8) And I want to get an industrial piercing(Some call it a scaffold). But my ear doesn't have a bend like most people do.I got my first four piercings done by a professional. But felt I was much more comfortable having my brother(22) do it. Since he's someone I know, and hes done piercings and stuff before.
- This is why you need a pro. I can see where you should probably put a helix-to-helix industrial in that ear, but if yall can't see it, then I don't think you should be trying this, as neither of you have the experience a professional piercer does.
- Q:So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
- I think industrials look extremely sexy on guys! I have one in each ear, and they cost 75 each ask to get it pierced with a smaller gauge, they usually pierce with 14g and it looks too big on most people and is more likely to bubble over. Im a girl so this wont be a problem for you, long hair really sucks with these piercings so I suggest pinning it back. Get the ear pierced that you are less likely to sleep on, getting it pulled on while you sleep really agitated the piercing. Keep it clean, use medicated or anti bacterial soap at least five times a day. clean it with qtips. uhm that's all I can think of right now. Best of Luck!
- Q:Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
- One is in any uneven slopes and ladder type foundation erection; two is the support ladder type template, template can realize the early dismantling; the three is to achieve early removal of part of the support frame, capable of setting up a passage, with four wing cornice; is the erection of climbing frame, a movable working table, efflux frame, to achieve the various functions of supporting role; five is used as storage shelves, can be used for the erection of a variety of stage, advertising support engineering. The pole is connected with a long press 600mm modulus of arbitrary function, also has a head butt function, provides the convenience for the use of special height. The utility model provides a technical support for the hanging, installing and fixing of the new type of formwork, and the utility model is used for the large-scale standardized template.
- Q:I know people have different pain thresholds. But I was wondering if it was more painful than a lobe piercing? It will be done with a needle and are they aloud to freeze it? Or is it not needed?
- I got my lobes pierced 5 years before my industrial so I can't compare the pain but everyone says industrial. Idk if they can freeze or not. The pain is completely tolerable.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Reliable Swivel Scaffolding Swivel Couplers
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords