Scaffolding, casting connectors

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10万件 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Type:
Scaffolding Parts
Scaffolding Part Type:
ledger end
material:
cast steel
size:
customized
surface:
black
press:
investment casting
weight:
customized
packing:
in bags
payment:
30% in advance,balance against the B/L copy
MOQ:
500 pcs

Packaging & Delivery

Packaging Detail:in bags or as required
Delivery Detail:in 20 days

Specifications

casting ledger end/modular scaffolding
material: cast steel
surface: black
OEM: avaliable

product mechnical properties:

material: cast steel

size: customizd

weight: customized

surface: black

press: investment casting

packing: in bags

payment: 30% in advance, balance against the B/L copy

MOQ: 500 pcs

Our products cover a wide range formwork accessories,shoring props,adjustable screw jacks.systerm scaffolding and a variety of scaffolding and formwork parts.

Welcom to contact us for detailed information and we wiil give you our favourable price

RINGLOCK STANDARD WITH SPIGOT (48.3mm x 3.2mm, Q345, Hot Dipped Galvanized)DescriptionWeightRing-Lock Standard 500mm2.76kgRing-Lock Standard 1000mm5.18kgRing-Lock Standard 1500mm7.61kgRing-Lock Standard 2000mm10.03kgRing-Lock Standard 2500mm12.45kgRing-Lock Standard 3000mm14.87kgRing-Lock Standard 4000mm19.72kgRINGLOCK LEDGER (48.3mm x 3.0mm, Q235, Hot Dipped Galvanized) DescriptionWeightRing-Lock Ledger 1000mm4.62kgRing-Lock Ledger 1500mm6.50kgRing-Lock Ledger 2000mm8.38kgRing-Lock Ledger 2500mm10.27kgRing-Lock Ledger 3000mm12.16kgRINGLOCK DIAGONAL (48.3mm x 3.2mm, Q235, Hot Dipped Galvanized)DescriptionWeightRing-Lock Diagonal 1000x2000mm10.06kgRing-Lock Diagonal 1500x2000mm10.95kgRing-Lock Diagonal 2000x2000mm12.13kg

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The construction scheme of high rise and external cantilever scaffold!
Quality standard for 3 foot hand frame fittings(1) steel pipe: steel pipe is generally used outside the 48mm, the wall thickness of 3.5mm steel welded pipe No. 3,The chemical composition and mechanical properties can meet the national standard "carbon structural steel" (GB / T700). The vertical rod, longitudinal rod (rod) tube length is 4~6m, horizontal bar (small bar) is generally 1.2.3m. steel pipe should be coated with anti rust paint.
Q:Method for inspection of foot hand frame fittings
GB15831-2006 steel pipe scaffold fastenerGB_5725-2009 safety net
Q:by scaffolding ?
It's a rhetorical question, maybe the girl is held up so well that it could have been something else holding her up there
Q:In the Scarlet Letter, how does the scaffold scene free Dimmesdale, Hester and Pearl?
Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
Q:scaffold pierving help please=] ???!!?
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder.com, we are Dubai based scaffolding contractor.
Q:Can you believe a man survived a 60 foot fall from a scaffold?
With God all things are possible.
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
difficult situation. search in google or bing. that could actually help!
Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range