Cup-lock Scaffolding with Competitive Prices, Qualified Products

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Main Intriduction of Cup-lock Scaffolding:

 

  • Name: Cup Lock Scaffolding

  • Category: Scaffolding system

  • Material: Steel (Q235/Q345)

  • Size: as your requirement

  • Surface:  Electro Galvanized/Self Color/Painted/HDG

  • Simple structure:
  • The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.

  • Safety and Steady:

    The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady,  even the up cup is loose, the ledger joint could connect with the standard steady.

 

2. The Advantages of Cup-lock Scaffolding:

 

  • Easy assembly, time and labor saving. 

  • High load-carrying capacity.

  • Adaptable to various construction projects.

  • All elements safely connected

 

 

3. Images for Cup-lock Scaffolding:

 

 

Cup-lock Scaffolding with Competitive Prices, Qualified Products

 

Cup-lock Scaffolding with Competitive Prices, Qualified Products

 

 4. FAQ

 

  • How to guarantee the quality of the products

    We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

  • Packing & Delivery

    Export standerd package or as customer's requirements.

  • Why Choose us?

    Delivery Detail:

    We are  the biggestmanufacturer on formwork andscaffolding accessories in China.

    We have more than 40 years experience on manufacturing and exporting.

    Timely after-sale service and long time following up.

  •  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is scaffolding pole, bar, scissors support?
2.2 according to the vertical and horizontal transmission force between the vertical and horizontal1 by the contact surface friction force transmission, that is, at the junction of the contact surface of the pressure after the friction force to support the transverse load and transfer it to the vertical pole, such as the role of the fastener, through the positive pressure of the bolt to produce friction;2 by the welding force transmission. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission force. This method is more common in the horizontal bar on the top of the scaffolding;4. The shear force of the dowel bar is connected with the vertical connection plate of the cross bar and the hole of the vertical rod to realize the connection and the shear force between the two sides of the pin rod
Q:Can I remove scaffolding off my property?
mom says more rights than the neighbor since they are taking too long to finish its in your favor - it is your property not the contractors mom would make a comment like this to that rude contractor since you have left this scaffolding abandoned in my drive way for a month (whatever time) i am sure that when you return in the morning someone else will have removed it for me since your permission time has long expired and you have been repeatedly asked to remove it - so if you value your equipment investment it will be gone before supper tonight - AM I UNDERSTOOD !!! (that last part would be really loud and right in his face, probably with a finger poke in the chest) then when they don't remove it be prepared with wrenches and a pick up truck to remove it before their return in the morning - stashing it out of sight but on the property when they question you about the missing scaffolding you can offer to rent one to them that was abandoned in your driveway for $500.00 dollars a day (she would smile her prettiest smile when she said this) be prepared for a fuss - but they had their chance - stand your ground that's how mom rolls - she plays for keeps - not many cross her - when they do they quickly regret it - she would have it in small pieces in front of their eyes, but she suggests the first description for you - mom is tough but incredibly fair - the rules are the rules for a reason whether you like it or not, or anybody else for that matter
Q:how long untill i can change my scaffolding bar?
U shouldn't exchange it. i've got had undesirable journey with that. If the bar that it replaced into pierced with dosent worsen ur tongue then use the comparable bar and purely exchange the ball. Ur working a hazard changing the bar bc u do not kno if the hot bar will infect or irratate ur tongue. If u do pick to alter it wait apprx 6wks except ur putting yet another a million in as quickly as u take the 1st a million out. U can exchange the ball suitable after u get it pierced bc the ball dosent remember as long as u save the bar in.
Q:Industrial/Scaffolding piercing.?
yes it is possible. I know people who have done that. But I suggest getting it done at once because it will hurt less in the long run. Getting your cartilage done hurts for about 2 weeks and then get the top part done that is another 2 weeks. So to get it done together it will only hurt for 2 weeks in instead of 4.
Q:can I claim compensation for falling of scaffolding and breaking my arm?
If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.
Q:Scaffold/Industrial piercing & healing?
If you want it now, get it done! One weekend of not cleaning it is no big dee, especially after it's a month old. Just make sure to clean it right before and after the festival. It'll be fine :) have fun!
Q:Significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
maybe the fact that it marked the point where she began to see things from a different perspective than the colonists (figuratively and literally) Hawthorne later says that she began to think unnatural thoughts for a colonist..... Hope this helps, we didn't really discuss this while we read it ^_^
Q:Industrial/scaffolding piercings?
I had my scaffold done when i was like 15 but had to take it out cus it wouldn't heal properly but that's because the piercer messed it up big time it should take on average about 2-3 months to fully heal but it completely depends on how fast your body heals in general! I have all my ears pierced and stretched my nose and my snake bites pierced as well, the scaffold hurt more then the snake bites defo but was around the same as the nose maybe a 1% more sore! The best way to describe it would be like getting your nose done twice in under 3 mins! It'll be sore to sleep on afterwards and i would defo clean it cus the last thing you want is it to get infected cus it'll just become more painful but apart from those obvious things its super cool and well worth getting it done! :)
Q:Painters on a scaffold?
I know where he should stand, but where he is standing is by the lunch truck when he should be getting his fat-*** back to work.
Q:how good is scaffolding in peru ?
It's scaffolding. Stop being a noob Alex. Why do you need to know? Unless you are going there in which case you can see for yourself. They obviously think it's fine because they use it themselves on a regular basis.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range