Cup-lock Scaffolding with High Performance, Best Prices

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


1. Main Intriduction of Cup-lock Scaffolding:


  • Name: Cup Lock Scaffolding

  • Category: Scaffolding system

  • Material: Steel (Q235/Q345)

  • Size: as your requirement

  • Surface:  Electro Galvanized/Self Color/Painted/HDG

  • Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc. 

  • Application: 

    Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering 

  • Simple structure:

    The main parts include the standard, ledger and brace, it is easy to assemble and disassemble, and also easy to storage, transfer and maintain.

  • Safety and Steady:

    The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the loading of the ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect with the standard steady.

  • Multi using:

    According to the specific construction, Cup Lock Scaffolding could be assembled into one or two row with different size, it could also be used for multi construction tools, such as supporting frame, supporting column, materials lifting frame, stage supporting, etc.

2. The Advantages of Cup-lock Scaffolding:

  • Easy assembly, time and labor saving. 

  • High load-carrying capacity.

  • Adaptable to various construction projects.

  • All elements safely connected

  • Highly durable


3. Images for Cup-lock Scaffolding:


Cup-lock Scaffolding with High Performance, Best Prices


Cup-lock Scaffolding with High Performance, Best Prices

Cup-lock Scaffolding with High Performance, Best Prices


 4. FAQ

  • How to guarantee the quality of the products

    We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

  • Packing & Delivery

    Export standerd package or as customer's requirements.

  • Why Choose us?

    Delivery Detail:

    10-25 days after receipt of payment.

    We are  the biggestmanufacturer on formwork andscaffolding accessories in China.

    We have more than 40 years experience on manufacturing and exporting.


    We have the excellent quality control.


    We have the competitive price.

    We have the completed sales and service team so that we can offer the best service.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Industrial/ Scaffold Piercing?
Scaffolds usually take 6-12 months to heal - if you got it done with the long bar to start with, expect it to be longer than that and a lot more painful and tricky to heal. If it was done correctly, with two separate bits of jewellery first, it'll be easier. It does vary with different people, but not usually by that much - if the recommended healing time is six months, yours is not going to be properly healed in a month even if it feels like it. At five months it might be. Yes, sea salt and warm water is good. Twice a day - no more and no less.
Q:Can any one tell me more about scaffolding?
Sorry I don't have links.But I have had the tube type for over 20yrs.The components are :cross bar decks or planks leveling pads scaffold ends(thats what we called them) You should be able to call your local rentall place and find out where you can purchase some or you might be able to purchase theirs at a good price.One more piece you may want to consider depending on how high you go is called a wall tie.always make sure your scaffold is level both ways!it makes a difference when you start to stack or tie together in a string.goodluck
Q:Attached to the lifting scaffolding installation site how to write
The actual strength of concrete at the attachment structure has reached the design requirements of scaffold.
Q:The contents of the inspection and evaluation of steel tubular scaffold with bowl buckle are as follows.
The construction scheme, the frame foundation, the frame stability, the rod lock, the foot board,
Q:Steel pipe scaffold scaffolding components which are composed of
Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure, and can be roughly divided as follows:
Q:Bowl buckle scaffold is the whole force or local force
Therefore, it has no bearing capacity and stability of the scaffolding
Q:After Care for Tragus, Cartlidge and Scaffolding Piercings?
One way I know to help the healing using bioplast or PTFE jewelry but I dont recommend changing it now since it's new. As for the rocksalt use it on the piercings to clean it out
Q:I am traveling to Buenos Aires in August. Are most of the major monuments under scaffolding now?
Hello. You can see most of everything. Not too many buildings in Restoration. The City looks well now . But Buenos Aires and generally Argentina are a mix of things. You visit Argentina and Buenos Aires for Monuments, Food, Culture, Dance and People. So....Enjoy Argentina and have fun
Q:Floor type scaffolding construction program is what kind of, what role?
The role and requirements of scaffolding:1, the role of scaffolding:(1) operating platform(2) stacked materials(3) short distance transport
Q:a 65 kg painter paints a side of a house while standing on a 5.5m long board w/c rests on a scaffold. the end?
good one babe. Heres yet another for ya An airline captain became breaking in an extremely extraordinarily new blonde stewardess. The path they have been flying had a stay-over in yet another city. Upon their arrival the captain confirmed the stewardess the ultimate place for airline workers to consume, save and stay in a single day. the subsequent morning because of the fact the pilot became preparing the group for the day's path, he observed the hot stewardess became lacking. He knew which room she became in on the hotel and called her up thinking what occurred to her. She replied the telephone, crying, and stated she could no longer get out of her room. you may no longer get out of your room? the captain asked, Why no longer? The stewardess replied, There are in uncomplicated terms 3 doorways in right here, she sobbed, one is the bathing room, one is the closet, and one has a demonstration on it that pronounces 'do no longer Disturb'!

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range