• Cup Lock Scaffolding Meet Any Requirements System 1
  • Cup Lock Scaffolding Meet Any Requirements System 2
  • Cup Lock Scaffolding Meet Any Requirements System 3
  • Cup Lock Scaffolding Meet Any Requirements System 4
  • Cup Lock Scaffolding Meet Any Requirements System 5
Cup Lock Scaffolding Meet Any Requirements

Cup Lock Scaffolding Meet Any Requirements

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
10000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Cup-lock Scaffolding


.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal

.Not easy to lose fastener, portable firm and easy to maintain and transport

3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

.5 times fast of adapter plug assembly and disassembly than normal

.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

 

    5.   FAQ of Cup-lock Scaffolding

    1) What can we do for you? 

 We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

 3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Q:Hi my next door neighbours are building an extension to their house. The builders asked if we would allow scaffolding to be placed on part of our driveway. Now, these builders are taking too long and the builders attitude is rude when questioned how long they gonna take to finnish. If we want the scaffolding to go, what righs have we got as we gave verbal permission to the builders to have it put up by scaffolders and the planned extension not yet completed?
mom says more rights than the neighbor since they are taking too long to finish its in your favor - it is your property not the contractors mom would make a comment like this to that rude contractor since you have left this scaffolding abandoned in my drive way for a month (whatever time) i am sure that when you return in the morning someone else will have removed it for me since your permission time has long expired and you have been repeatedly asked to remove it - so if you value your equipment investment it will be gone before supper tonight - AM I UNDERSTOOD !!! (that last part would be really loud and right in his face, probably with a finger poke in the chest) then when they don't remove it be prepared with wrenches and a pick up truck to remove it before their return in the morning - stashing it out of sight but on the property when they question you about the missing scaffolding you can offer to rent one to them that was abandoned in your driveway for $500.00 dollars a day (she would smile her prettiest smile when she said this) be prepared for a fuss - but they had their chance - stand your ground that's how mom rolls - she plays for keeps - not many cross her - when they do they quickly regret it - she would have it in small pieces in front of their eyes, but she suggests the first description for you - mom is tough but incredibly fair - the rules are the rules for a reason whether you like it or not, or anybody else for that matter
Q:Explain the principles of scaffolding?
The term scaffold is a Vygotskian metaphor for someone to support a learner through dialog, questioning, conversation, and nonverbal modeling, in which the learner attempts tasks that could not be done without that assistance. Identify five types of scaffolding: offering explanations, inviting participation, verifying and clarifying understandings, modeling of desired behaviors, and inviting them to contribute clues for reasoning through an issue or problem. Additional effective scaffolds, especially for struggling people, are to address the emotional.
Q:when must you wear safety harnesses on scaffolding?
At all times.
Q:How can teachers use scaffolding to support student learning of new knowledge?
You need to relate new class knowledge to old knowledge, and also make learning materials for new activities highly structured, and gradually less structured as you move through the topic.
Q:is both 1 m farm from the scaffold. if the boeard is 20 kg in mass, how close to the end can the painter stand w/out tipping the board over?
good one babe. Heres yet another for ya An airline captain became breaking in an extremely extraordinarily new blonde stewardess. The path they have been flying had a stay-over in yet another city. Upon their arrival the captain confirmed the stewardess the ultimate place for airline workers to consume, save and stay in a single day. the subsequent morning because of the fact the pilot became preparing the group for the day's path, he observed the hot stewardess became lacking. He knew which room she became in on the hotel and called her up thinking what occurred to her. She replied the telephone, crying, and stated she could no longer get out of her room. you may no longer get out of your room? the captain asked, Why no longer? The stewardess replied, There are in uncomplicated terms 3 doorways in right here, she sobbed, one is the bathing room, one is the closet, and one has a demonstration on it that pronounces 'do no longer Disturb'!
Q:The height and spacing of the horizontal web of the scaffold?
1) longitudinal horizontal rod overlap length should not be less than 1m, and fixed should meet the specification requirements;2) in addition to the top of the top of the top step, not the use of lap.3 body protection
Q:The combination form of bowl buckle type common scaffold?
Bowl buckle type steel pipe scaffolding erection requirements of bowl buckle steel pipe scaffolding column spacing is 1.2m, the vertical distance according to the scaffolding load can be 1.2m, 1.5m, 1.8m, 2.4m, step distance is 1.8m, 2.4m
Q:What is scaffolding pole, bar, scissors support?
Bowl buckle steel pipe scaffolding when using steel pipe, as a single steel scaffolding, when the use of steel when the edge of the cross bar, for the steel based scaffolding
Q:What are the hidden dangers of scaffolding
Collapse is the biggest hidden danger scaffolding. Countermeasures to prevent and prevent the collapse of the scaffold: 1 must not be "empirical" in the daily enterprise construction process, some enterprises use "empiricism", do not carry out specific accounting. Timberman no license, is still "empiricism", scaffolding system does not have a scientific guarantee, the collapse is inevitable. For steel scaffolding, should be in accordance with the "construction of steel tubular scaffold safety technical specifications" (JGJ1302001), for scaffolding, should be in accordance with the cuplok scaffolding component (GB24911-2010) and JGJ 166-2008 construction cuplok Scaffolding Safety Technical specification, the scaffolding should be in accordance with the "construction steel scaffolding safety technology standard" (JGJ 128-2010), other types of scaffolding should also refer to the relevant standard.
Q:Can you shorten the distance of the bowl buckle scaffold? That is, regardless of the length of the pole, the distance can be set to 60, 90, 120cm. Thank you
2, the bowl buckle steel tube stand step distance must be calculated to determine; for example, the calculation of the structure of the vertical bar step distance of 120, then the erection can not be used in the 180 step,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords