Cup-lock Scaffolding with Great Reputation,Painted

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
20000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.


It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.


2. Main Features of Cup-lock Scaffolding

.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal

.Not easy to lose fastener, portable firm and easy to maintain and transport 

3. Cup-lock Scaffolding Images 

Cup-lock Scaffolding with Great Reputation,Painted

Cup-lock Scaffolding with Great Reputation,Painted



4. Cup-lock Scaffolding Specification

.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

.5 times fast of adapter plug assembly and disassembly than normal 

.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage


5. FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  


2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.


3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  


 4) What about the package and shipping time?

 .Packing:  As Customer's Requirements

 .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS,    EMS, etc. ; by air/ sea, and we are VIP of these express.  

 .Shipping time:

 Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may  need 7 days

Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping  freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Buckle scaffolding problem, now used more or less
Is the rural infrastructure team? If it is because it is time-consuming, but very high security
Q:Is angkor wat still under restoration with scaffolding?
There is some restoration of the main temple that is being funded by Japan. You can still see the main parts of the temple. The temple that has the roots growing over it is also being restored but you can also access most of it and you can get good pictures. Take plenty of water and a hat and sunscreen it is very hot.
Q:Bowl buckle scaffold from the machine to pull out the upper and lower bowl
Do not know if there is no other norms on the bowl, it is this.The values of the carrying capacity are like those provided by the manufacturer.
Q:Bowl buckle scaffold is the whole force or local force
Therefore, it has no bearing capacity and stability of the scaffolding
Q:Free fall physics question: a construction worker accidentally drops a brick from a high scaffold..?
Since acceleration is constant which is 9.8 m/s^2, the velocity increases by the fixed 9.8 amount every second, so: A) v = v0 + gt = 0 + 9.8*4 = 39.2 m/s where v0 is initial speed which in this case is zero. B) We use constant acceleration equation: x = x0 + v0*t + 1/2gt^2 = 1/2 gt^2 = 1/2 *9.8 * 16 = 8*9.8 = 80 - 1.6 = 78.4 m
Q:Bowl buckle scaffold construction needs to pay attention to what problems
Between the outer edge of the scaffold and the overhead line must be kept safe operating distance, to maintain not less than 4.5m, or the need to add additional barrier protection measures.  Lightning protection set by 12 round steel and building lightning protection column and reliable welding, weld length not less than 6D, the grounding resistance shall not more than 30. The lightning protection of the scaffold is closed to the ring welding set, and the four angle is connected with the rib.
Q:scaffold piercing really bleeding?
its normal aii your probaly slept on it just do a sea salt soak and you'll be fine but if your super worried go back to your piercer
Q:How long does it take to put up scaffolding?
all depends how many guys are putting up the scaffold but I would say more than two hours
Q:Do Scaffold peircings hurt...? D:?
I think i have a pretty high pain tolerance and i thought it hurt. It wasn't terrible but it still hurt. It also is really sore after but maybe take some advil or something before and hope that may help. Good luck
Q:Bowl buckle scaffold weight per meter
The longest component of the scaffold 3130MTM, the most reconstruction pieces 40.53KG.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range