• Cuplock System Scaffolding for Large Projects System 1
  • Cuplock System Scaffolding for Large Projects System 2
Cuplock System Scaffolding for Large Projects

Cuplock System Scaffolding for Large Projects

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5000 pc
Supply Capability:
5000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 1.Structure of Cup-lock Scaffolding Description:

  

  Cup-lock Scaffolding adapts flexible to any wall geometry.

  Fast due to pre-assembled panels with built-in plywood.

  Strong with 80 kN fresh concrete pressure per m2 allowed.

  Economical due to longer service life and fewer parts.

  Hire option given in selected regions.

  Hot selling Cup-lock Scaffolding with low price.

  The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. 

  The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push     props.


2.Main Features of Cup-lock Scaffolding:

   Comperticative priceGood bearing capacity.

   Stable& durable. 

   Easy to assemble or dismantle.

   Best price cuplock scaffold.
   Steel Tube ScaffoldSystem.

   Cup-lock System Scaffold.

   Steel Pipe.

   Cup-lock Scaffold.

   Packaging & Delivery:

   Packaging Detail:Pallet

   Delivery Detail: 20-30 days after order confirmed.


3.Cup-lock Scaffolding Images:

 

  

Cuplock System Scaffolding for Large Projects


Cuplock System Scaffolding for Large Projects


 4.Cup-lock Scaffolding Specification:


 Fast in transportation and concrete casting due to pre-assmebled table unit.
 Can choose shoring props or towers according to different loadings and height.

 Safety and Steady: 

 The up cup has the screw friction and self-gravity, it could self-lock steady, this makes the ledger steady, the  loading of the  ledger could transfer to the standard through the down cup, even the up cup is loose, the ledger joint could connect  with the  standard steady. 


5.FAQ of Cup-lock Scaffolding:


What about of our after-sale services?

Response will be carried out  in 24hours  after receiving any complain or request.

Any formwork cost can be refund after order is confirmed. If the products are not based on the requirements, there will be the relevant compensations made for you. 

If the products are not based on the requirements, there will be the relevant compensations made for you.


Q:What kind of scaffolding used in engineering construction
Scaffolding has a single floor, double row fastener type steel pipe scaffolding, full fastener type steel pipe scaffolding, steel cantilever fastener type steel pipe scaffolding, full fastener type steel pipe support, etc..
Q:am i in my rights not to allow the scaffolding to be brought through my living room and kitchen.I have just had a threatening letter from camden council that they will force an entry if I refuse.I have lived here for 33 years and any scaffolding has always gone through the side entrance next door and over the garden wall I am a pensioner and feel I am being harassed
Hey teanzette, I see you're a big fan of gardening and that you really love to plant different plants with that desired passion <3 I just find this awesomely great gardening guide online couple of days ago, and I must say that my garden are just looking more and more fabulous each day!! :D My guests and family always complimenting. I keep it a secret tho, since I like being looked at as this master gardener :) so shhhhh.. don't tell anyone! xD hehe But I will give you the link, my friend :) And cook luck!
Q:Can any one tell me about different types of scaffolding? Especially about tubular and frame scaffolding. If you can tell me about the components using in scaffolding also, that would be appreciate. Please give me some useful links too. Thanks in advance.Regards,Just A Guy
Sorry I don't have links.But I have had the tube type for over 20yrs.The components are :cross bar decks or planks leveling pads scaffold ends(thats what we called them) You should be able to call your local rentall place and find out where you can purchase some or you might be able to purchase theirs at a good price.One more piece you may want to consider depending on how high you go is called a wall tie.always make sure your scaffold is level both ways!it makes a difference when you start to stack or tie together in a string.goodluck
Q:How to calculate the cost of scaffolding
The general case is to artificial fee fee based fees, high-rise building scaffolding demolition charges, high fees are in fixed price as the base fee of labor costs, but the valuation when high costs denominated base also includes the high-rise building costs, labor costs and fee scaffolding. In addition, the rates are different, you should refer to the various regions of the fixed fee rate, hoping to help you!
Q:Who can give me a bowl buckle scaffold acceptance form?
Tighten the quality of fasteners should be 50% sampling rate, the pass rate should reach 100%;
Q:All I know about the guy is that in the end, he doesn't get the girl he wanted and his head gets chopped off. Please don't give me critiques or anything like that. I just want the story. Thanks.
Idee Fixe Definition
Q:ends. Bob weighs 730 N and stands 1.00 m from the left end, as shown in the figure below. Two meters from the left end is the 500 N washing equipment. Joe is 0.500 m from the right end and weighs 910 N. Given that the scaffold is in rotational and translational equilibrium, what are the forces on each cable?
Rainwater forgot about the weight of plank itself... So: (0.5 m)×(910 N) + (1 m)×(500 N) + (1.5 m)×(295 N) + (2 m)×(730 N) = (3 m)× T? T? = 952.5 N (1 m)×(730 N) + (1.5 m)×(295 N) + (2 m)×(500 N) + (2.5 m)×(910 N) = (3 m)× T? T? = 1482.5 N Check: (952.5 N) + (1482.5 N) ?=? (730 N) + (295 N) + (500 N) + (910 N) (2435 N) !=! (2435 N) Seems OK ;-)
Q:I pierce and I have 20 piercings. I've wanted this piercing for like 2 years, and about 3 days ago i finally did it =]I just wanted to know what you think.
I think the top looks a little high on the ear, Like, the angle of it is too steep.
Q:Hey so I've had my scaffold piercing a day and its bleeding a lot when I woke up this morning, there was even like jelly blood clots, its really painful and super itchy, I know I've only had it a day but I'm a little worried, any advice ? Thanks :)
Is there a reason you haven't any longer been to the ER or pressing care an prolonged time in the past? circulate there now. You gotta use some easy experience here. we will not make it easier to be conscious of what to do while it includes scientific judgements or making up your ideas. you are able to beware for your self.
Q:In the first scaffold scene, which is at the beginning of the book with Hester's sentencing of three hours on the scaffold. This is when Pearl is still a baby. And the last scene where things are being revealed at the end of the book. What time of day are both of those? Like afternoon, evening; month; season, etc. Do you guys have any info about that? It doesn't have to be all I listed just something that says the time they occurred.Thanks.:)
concentration your interest on who's on the scaffold, how they react to the standard public shaming, and what the reader learns with regard to the character from analyzing the define of them on the scaffold.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords