Crawler Excavator 8ton with CE Approved CT80-7b
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Crawler Excavator 8ton with CE Approved CT80-7b
Product Details
Basic Info.
Model NO.:CT80-7B
Type:Crawler Excavator
Usage:GM Excavator
Transmission:Mechanical Transmission
Drive Type:Internal Combustion Drive
Bucket Capacity:0.1~0.5m³
Size:Small-Scale
Certification:CE
Condition:New
Color:Yellow
Function:Earthmoving
Export Markets:Global
Additional Info.
Trademark:KUDAT
Packing:Bulk
Standard:SGS CE
Origin:China
Production Capacity:500PCS/Year
Product Description
Original Yanmar engine complies with strong power, high effiency, lower failure rate, low oil comsumption, lower noise
Imported hydraulic pumps, valves, motors ensure high, performance
Capacious and comfortable cabin with air conditioner
Advanced electric control system realizes the auto idling function, reduction fuel consumption
Specification | |
Operating weight | 6820kg |
Standard bucket capacity | 0.26m 3 |
Track shoe width | 400mm |
Arm length | 1700mm |
Boom length | 3260mm |
ENGINE | |
Model | Yanmar 4TNV94L |
Type | Natural aspirated |
Number of cylinder | 4 |
Max. power/rpm | 37.9kw/2200rpm |
Max. torque | 217N.M at 1000 rpm |
Displacement | 3.054L |
HYDRAULIC SYSTEM | |
Main pumps | |
Type | Variable displacement axial piston pumps |
Max. displacement | 63cm 3 /r |
Working pressure | 25Mpa |
Hydraulic motor | |
Slew | Fixed displacement axial piston motor |
Travel | Variable displacement axial piston motors |
Performance | |
Slew speed | 12 rpm |
Min. back slew radius | 1650 mm |
Max. travel speed high/low | 4.8/2.6km/h |
Grade ability | 35 ° |
Traction force | 46.3kn |
Max. digging force of bucket | 44.5kn |
Max. digging force arm | 30.7kn |
Ground pressure | 0.337kg/cm 2 |
Tank capacity | |
Fuel tank capacity | 135L |
Hydraulic tank capacity | 95.8L |
- Q:Modern 305-7 excavator oil consumption per hour, how many liters oil full load?
- Diesel engine can be estimated by specific fuel consumption, but to know the normal work of the power consumption, if this is full load work, you can press the nameplate power, generally 180 grams / horsepower * hours, about 0.2 liters / horsepower * hours.
- Q:Deck listForrest x5Plains x5Moutain x5Swamp x5Island x5Terromophic expanse x4Evoliving wilds x1Turtimber ranger Graupelt hunter x2Oran-rief survivalistTuktuk grunts x3Kazuul warlord Tuk tuk scrapper x2Hagra diabolist x3Nimana sell-swordHalimar excavator x4Seascape aerialist x3Jwari shapshifter x2Talus paladin x2Ondu cleric x3Join the ranks x 3Venser, the sojournerCoat of arms So yes help me with this one idk what else I could do to make it better please and thank you (:
- play only two color for more stable mana base white has the best allies so it's your main color 4 of each of these is necessary kazandu blademaster hada freeblade play 2-4 talus paladin kabira evangel then choose a second color, good allies in blue, umara raptors jwari shapeshifter seagate loremaster good allies in red kazuul warlord akoum battlesinger black bala ged thief bojuka brigand => sucks actually but it cost 2 and keep growing green turntimber ranger oran rief survivalist add in some removal and you're done (journey to nowhere, condemn, doom blade, lightning bolt) if playing blue you can add some mana leaks other good cards mimic vat ajani goldmane jace dark tutelage my list btw for reference, // Lands 3 [ROE] Evolving Wilds 7 [ZEN] Swamp (1a) 10 [ROE] Plains (4) 4 [ZEN] Marsh Flats // Creatures 4 [ZEN] Bala Ged Thief 4 [WWK] Talus Paladin 2 [ZEN] Ondu Cleric 4 [ZEN] Kazandu Blademaster 4 [ZEN] Kabira Evangel 4 [WWK] Hada Freeblade 4 [WWK] Bojuka Brigand // Spells 3 [SOM] Mimic Vat 3 [M11] Doom Blade 3 [M11] Dark Tutelage 1 [ROE] Gideon Jura // Sideboard SB: 1 [ROE] Gideon Jura SB: 4 [SOM] Memoricide SB: 2 [M11] Baneslayer Angel SB: 4 [ROE] Inquisition of Kozilek SB: 4 [M11] Duress
- Q:What are the main parts of the excavator structure?
- The common excavator structure includes power device, working device, slewing mechanism, control mechanism, transmission mechanism, walking mechanism and auxiliary facilities, etc.. These are the theoretical basis, I have learned in Henan, Zhumadian, mountains and rivers engineering machinery school! This school pays more attention to theoretical study! Lay a solid foundation for upgrading the technology!
- Q:My backyard is just a rocky weed patch that has never been finished, and I want to have a service come in and dig off the top 6 or 8 inches of soil/debris and bring in topsoil to replace it. What would you call this service, and who would I have do this? Would a regular landscaper do it, or do I need to call an excavator company? There is a significant amount of rock in my soil, so I'm assuming they'd need more than just a little bobcat.
- Most okorder and choose a landscaper from her list of vetted contractors.
- Q:Now i know this might not be the right section but i couldnt find any closer then this one. Ok so its about heavy equipment that is used for construction, digging etc. Identify the reason for positioning the excavator with the propel motors to the rear when working close to an excavation??? Please help ive looked everywhere in the internet i can find and no luck yet
- I reply first, and if the answering makes me suppose or makes my day, then I'll big name. I realize...it is choosy of me, sorry. o.o But this fashion I emerge as pointing my enthusiasts and contacts to the *well stuff* you recognize? ^__^ Or no less than I attempt to. But have a celeb besides only for being sufferer and information. ^_^
- Q:How much is Carter excavator 320D?
- The full price of the joint venture machine is 115. There are two kinds of imports, one for 122 and 125 for one. Down payment 20 and tax. Insurance what, together with more than 30 W down payment, you can mention the car mortgage 2W5-3W per month. 3 years hope to help you, the quotation is not the same everywhere.
- Q:How to play on a heroic union excavator?
- The wind inside half meat: any jungler equipment: Enchant warrior or enchant: greed on inflammatory phagocytic Hydra power cut black cloak three or Banshee veil Berserker boots or light armorSF: any jungler equipment with an enchantment: Warrior or enchantment: greed or broken King swallowed the Hydra blade force, Tatike three-phase electric sword by the spirit or black carvers Berserker or boots and LeggingsThe loading: any jungler equipment: Enchant Boots or Ninja Warrior greed Hydra Sunfire void gate Banshee cloak veil foot with mercury
- Q:How to find the total volume of Earthmovers buckets?
- Spec sheets for excavators like the one on the first link typically talk about the SAE standard at 2/1 heaped. The standard is the Society of Automotive Engineers standard J742. Interestingly this standard, which came out in 1979 was cancelled in 2001 and not replaced. However you can still purchase this document for $98.from the second link. The summary for the standard says Description: This standard applies to buckets of loaders (as defined by SAE J1057a, Identification Terminology of Earthmoving Machines). This method applies primarily to buckets having parallel sides and a cutting edge parallel to the top edge of the back sheet. Moderately clipped back sheet corners will introduce no appreciable errors. Bucket teeth, tooth adapters, as well as other similar local discontinuities are ignored. a. Interpretation of irregular shaped cutting edges is identified in paragraph 4.4. b. Interpretation of irregular shaped side sheets is identified in paragraph 4.5. Purpose - The purpose of this standard is to provide a uniform method for determining the SAE struck capacity and rated capacity. The volume calculations used result in a realistically conservative heaped volume. The calculations are based on the inside physical dimensions of the bucket only without regard to bucket action provided by any particular machine. For rating purposes, a nominal heaped load with a 2:1 angle of repose is to be used with bucket orientation dictated by the strike plane defined in paragraph 3.1. This in no way implies that the loader linkage must carry the bucket oriented in this attitude, or that all materials will naturally have a 2:1 angle of repose. So effectively use geometry depending on the buckets shape. If it has parallel sides its going to be height X width X length for the struck volume with the addition of the prism for the heaped volume. 2/1 means 2 horizontal for 1 vertical. So the prism volume will be length X width X width / 8.
- Q:I thought a trackhoe was just like a backhoe loader, except on tracks. Yet when I look at Google's pictures of trackhoes
- In your picture, the top line of photos, yes. In the Industry, excavators or track-hoes are the same thing. The words are interchangeable. Hope this helps. Wingman
- Q:I need to know how much each of these costs. it's ok if you can only tell me a few but I'd like to know the cost of all of these.about 40 acres of land in colorado within 15 miles of a city.a 150' x 150' fence that's 6' high.an excavator. (to buy, not to rent)5 apple trees.5 orange trees.5 cherry trees.5 walnut trees.20 blueberry bushes20 strawberry bushes8 10' x 10' canvas tents.80 pine tree seeds.25 solar lights.10 koi fish.a nissan xterra.50 cubic feet of gravel.enough corn to plant a 10' x 10' land.enough lettuce to plant a 10' x 10' land.enough carrots to plant a 10' x 10' land.enough spinach to plant a 10' x 10' land.enough bell pepper to plant a 10' x 10' land.enough mint to plant a 10' x 10' land.enough watermelon to plant a 10' x 10' land.25 single person tents.a well.
- Your okorder /
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Crawler Excavator 8ton with CE Approved CT80-7b
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords