Bridge Formwork System for Building Construction

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Building Bridge Formwork:

A compositional steel formwork system mainly used in the building which has regular structure

without beams, the excellent formwork system can make the integral pouring for the wall & slab

easily achieved.


Characteristics:

◆ No assembling, easy operation with formed formwork.

◆ High stiffness, make perfect shape for concrete.

◆ Repeatedly turnover is available.

◆ Widely applied range, such as building, bridge, tunnel, etc.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:There are no recycling tunnel templates
If it is a tunnel two lining car template, and the use of the tunnel after the car can continue to use the value of such a tunnel lining car basically has a market of two, but also to be recycled. The specific recovery and continue to use, mainly to see the two lining of the tunnel and the old and new without modification.
Q:Where is the B-B section of the tunnel invert reinforcement
Tunnel arch wall refers to both sides of the tunnel wall and the top of the arch, the tunnel arch wall is generally the use of a template trolley.
Q:Main diseases and prevention of tunnel
Insufficient anchor tensionPhenomenon: anchor installation is not strong, pulling force is not enough.The reason analysis: anchor length is not enough; mortar grouting is not full; mortar wrapped anchor thickness is not enough or not at all; holes in the debris is not clean; the depth of the hole with the length of the bolt is not matching.Preventive measures: the hole diameter should be matched with the bolt diameter; strictly according to design deep hole drilling; grouting pressure and wind pressure water rinse perforations; bolt rust, straightening, ensure the bolt and hole center line on the same line of installation; the hole from the bottom of the hole, uniform and continuous. Midway not interrupt; using earlystrong medicine package bolt, the bolt diameter should be treated with perforation diameter matching.
Q:How to set the location of the tunnel trolley,
The trolley positioning, the first to the two lining trolley running mileage, and positioning, positioning process will have been completed two off the top two tight lining lining, free end positioning first center point positioning control of elevation and with a plumb line (top surface elevation is equal to the length of the plumb line + if the mileage of two the center point of elevation can be lining),
Q:In the tunnel construction, the water stop strip and the water stop strip are used in what place
If you need to connect in the field, you can use the electric heating plate vulcanization bonding or cold bonding (rubber water stop) or welding (plastic water stop) method, such as user connection is difficult, I can send technical personnel on-site guidance.
Q:What is the role of the tunnel formwork trolley? What is the use of template trolley?
The car is often used in the construction of hydraulic tunnel, the tunnel is not allowed to have concrete construction longitudinal joints, in the hydraulic tunnel span is large
Q:How many meters can be poured in the first floor of the 2 level of the surrounding rock of the railway tunnel?
6 excavation methods of tunnel1, full section method2 step method3, three steps of the 7 step excavation method4, septal wall method (CD method)5, the intersection of the next door method (CRD method)6, double side drift method
Q:What are the reasons for the two lining concrete lining of the tunnel?
(1) the steel frame is put aside, there is no reinforcement pad or pad number is not enough, the position is not correct, resulting in the reinforcement close to the template and exposed.(2) the coarse aggregate size is greater than the reinforcement spacing, or the debris is placed in the steel frame, while the concrete leakage, forming a serious honeycomb and holes and exposing the reinforcement.
Q:When the tunnel fight, there is no provision for the number of meters hit
Fixed strip: the use of additional reinforcement fixation; special fixture fixed; the wire and the fixed template (Figure 2).
Q:How to put the concrete on the tunnel
Tunnel concrete is completed by the way of edge excavation and lining. After the excavation, the shotcrete is used as the initial support, and then the reinforcing steel mesh is set up. Only after the two lining.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range