• Yuchai YC6MJ (280-300kW) Series Engines for Generators System 1
Yuchai YC6MJ (280-300kW) Series Engines for Generators

Yuchai YC6MJ (280-300kW) Series Engines for Generators

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Yuchai YC6MJ (280-300kW) Series Engines for Generators

· The integrated crankshaft, postposition gear chamber and point-line gear-meshing patent technology reduce noise level

· Wet cylinder liner structure facilitates maintenance and repair

· High mean effective pressure and power density

· Improved fuel consumption by P7100 fuel pump, P-injector and Honeywell turbocharger

· Yuchai sealing technology in piston ring and valve oil seal improves lube oil consumption

· High fuel efficiency and low maintenance cost

· Reliable cold starts at -25and applicable altitude at 2500m without derating

· Major overhaul period is more than 12000 hours

YC6MJ

TECHNICAL SPECIFICATIONS

Model

YC6MJ480L-D20

Configuration

Vertical, in-line, 6-cylinder, Water-cooled, 4-stroke

Aspiration

Turbocharged and air to air inter-cooled

Bore ×Stroke                                                  (mm)

131 ×145

Displacement                                                      (L)

11.73

Compression ration

17.5:1

Prime power/Speed                              (kW/r/min)

321/1500

Standby power/Speed                           (kW/r/min)

352/1500

Fuel consumption                                     g/(kW·h)

≤195

Oil capacity                                                         (L)

28

Oil consumption                                       g/(kW·h)

≤1

Starting method

Electric

Noise Lw                                                        dB(A)

≤102

Emission

T2

Applicable altitude                                            (m)

≤2500

Engine dimension (L×W×H)                           (mm)

1820 ×900 ×1370

Dry weight                                                        (kg)

1000



Q:I need a second person to sweep up my droppings and 2 more to help shovel beans rice into my mouth. These jobs are shovel ready people! Let's move!
We could hire a crew of excavators to dig you out of the National treasury too!
Q:What does it mean to walk an excavator and how do u do it?
Only a guess here but it may refer to using the bucket and arm to pull or push the machine along without engaging the tracks or wheels.
Q:hitachi ex60-1 excavator service manual for all parts in the machine
WHERE DO I GET THE PART NUMBERS FOR HITACHI EX60
Q:Inspection and maintenanceof excavator?
machinery should always be inspected daily prior to commencement of work.simple walk around looking for obvious defects like leaks of hydraulic fluid from rams,oil patches underneath main body of machine.simple little things really, also get a grease gun and grease the nipples at least every 20 hrs of machine working.always check your reservoir's i.e water,fuel and hydraulic
Q:Stolen : Chain Saw, axles for a trailor... help jjj
I suspect that you work for an operation which is small enough that the thief is likely to figure out who the snitch is. The situation is difficult to report if you fear retaliation. Your duty to your boss and yourself is to implicate the thief . . . except that. . . if you have no evidence, you have only your word against the thief's. I know an excavator who was aware that an employee was stealing gas every evening by pumping it from the company pump into his car. One day, when the gas tank was near empty, he drained it into the companies machines and put fifty gallons of diesel into the tank. When the thief filled his car and drove off, he got only about a half mile down the road. The boss already had his severence paycheck written and drove it out to the stranded car. The boss told the guy, Well you s h i t, I guess that's the last time you steal from me. You're fired. If you come back and screw with me or my stuff, I'll cut off your hand or whatever else is sticking out. The thief was not heard from again. Your thief must be reported but evidence is needed. You can mail the boss a simple but complete report of what you know to be facts relative to the thief's activities. Type the note and do not sign it. Let the boss have a chance to catch the guy or involve the police. Your place is to simply let the boss know what is going on and who is guilty. beyond that, it is your bosses place to correct the situation.
Q:What does the excavator model mean at 1:35?
It's 35 of the actual excavator size, 1.
Q:What is the special advantage of the romantic manor iron hoe?
The primary ore mine is hoe hoe, use it is the requirement of prestige class 1, grade 1. When the ore hoe dug star, you can upgrade to the iron ore or hoe excavator (model T800), because the excavator need only provide cinder can hang after mining, it is convenient to consider, must have advantages and disadvantages, so in the same condition, T800 can only dig the primary ore, and the iron hoe can be more than junior high dug mine, this is a fair difference.
Q:I was watching a documentary about pompeii and the eruption in 79 AD but i fell asleep before it ended. The last thing i remember seeing was what looked like rock covered people?how did this happen? im guessing it was due to the pyroclastic flow? but im not 100% sure.
What Caused Pompeii
Q:A subway excavator lifts a person standing on it in 1 minute.The person climbs op on the unmoving/not working excavator in 3 minutes.In what time will the person climb on the working/moving excavator?(This is translated from another language)
A subway excavator lifts a person standing on it in 1 minute.The person climbs op on the unmoving/not working excavator in 3 minutes.In what time will the person climb on the working/moving excavator? This is a relative speed problem. d = distance that they move upward. The speed of the excavator = d ÷ 60 seconds. The speed of the person = d ÷ 180 seconds The sum of speeds = d/60 + d/180 = 3 d/ 180 + d/180 = 4d/180 = d/45 Time = distance ÷ speed = d ÷ d/45 = 45 seconds = 0.75 minute This makes sense, because the time should be less than the other 2.
Q:What do you mean by excavator?
Excavators are used to dig holes, and network language means "pit"!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords