Tower Cranes Self Climbing with High Efficiency 4ton 5510
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
4ton 5510 Description
Feature: Tower Crane Condition: New
Application: urban construction Rated Loading Capacity: 10T
Rated Lifting Moment:400KN.M Max. Lifting Load: 10T
Max. Lifting Height:200M Span: 65M
Model Number: 4ton 5510
Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate
Colour: Orange/ Yellow
After-sales Service Provided: Overseas third-party support available
4ton 5510 Features
1. Export to more than 20 countries with CE/ISO/GOST Certificates.
2. Stationary/Travelling, external/ internal climbing tower crane
3. Impeller blasting/rust protection paint
4. Advanced painting process
5. Potain masts designed with dismountable panels, making teansport easier and cheaper.
6. New designed mast, can be used to Internal and external climbing tower crane
7. Engineers available to service machinery overseas.
4ton 5510 Specification
4ton 5510 Pictures
4ton 5510 FAQ
Q: What is the difference between working wire rope and safety wire rope?
A: There are two kinds of rope using for suspended platform, working wire rope is for working up and down, the other is safety wire rope, just for safe, if the working wire rope broke and fell down, the safety wire rope will locked immediately.
Q: What is counter weight? How kinds?
A: Counter weight is for balance the suspension mechanism. There are 2 kinds of counter weight, one is made by iron, the other is by concrete.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: What should be included in the disassembly plan of the tower crane?
- - 2 - (1)Project and safety supervisor with safety certificate and mechanical management personnel.(2)Construction crane with qualification certificate for construction operationMachinery installation, disassembly, lifting, signal workers, electricians, lifting drivers, cable operators and other special operations personnel.The above constructors shall fill in the name, type of work and qualification number of the constructors.11 、 installation procedure and safety quality requirement;In strict accordance with the tower crane product specifications, installation procedures and safety quality requirements of the implementation of the organization of safety construction technical disclosure and signature confirmation.12, installation self-test;After installation, the installation of the unit with the installation quality testing, debugging safety device and complete self-test report.13, major sources of risk and safety technical measures14, emergency plans and so on
- Q: For those of you who know about the tradition where you make origami cranes and can make a wish, is it 999 cranes or 1,000 cranes? Cuz I just finished making 999, but I'm not sure if it's actually supposed to be a thousand instead.
- It is susposed to be 1000 cranes. You string them in 10 sets of 10 cranes. [thats how I remember!]Can you send me your way of folding them? I can't find one that works right for me, they always turn out a little wrong. :[
- Q: quick answer or i'll delete it!
- Pizza Delivery Spongebob Episode
- Q: the red badge of courage, a novel about the civil war, the verb wrote is A) transitiveB) intransitive
- Transitive - because it has an object The Red Badge of Courage. . Generally, if you can put the word something after a verb, it is transitive. Stephen Crane wrote something .
- Q: I was wondering if Steam Cranes are still used to clear train derailments or are the all mothballed now? What do they use to clear derailments now days if the not the Steam Cranes? Also way are there 2 types of hooks on the crane anyway? Thanks
- They started to go by the wayside in the early 80's around here, though they were still in use until technology caught up and they could manufacture a 200 ton capacity crane for use on the highways. They had Hi-rail equipment and could get to the scene of a derailment much quicker than the old steam derricks. Near the end, I know there were at least 5 still operating, but the problem was, there were only two guys on the system that could run one of the things. Steam is the key word. We're all used to seeing crane operators running the machine from their little cab and moving the levers that control the hydraulics. But, it was amazing to see a guy run one of the Bucyrus Erie 200 ton derricks. All the functions were controlled by various valves that were scattered around the operators position, and it was like watching some kind of choreography; ballet, even. The sights, smells and sounds of the thing in action were no less eye catching than watching the operator himself.
- Q: please tell me where you found the info.
- less then a yr i believe
- Q: I'm thinking of making a senbazuru for by boyfriend as our first anniversary gift but I'm not sure if it's appropriate. I know its usually given to couples as a marriage gift, but yeah...does it seem too much?Btw a senbazuru is 1000 paper Cranes strung together.Thanks for the help!
- You could but it's a waste of time and it isn't really keepable.. No offence intended but it'll just be an extra mess. Give him something he can keep and plus you'll waste your time if you guys ever break up. However, it can also be a good luck for him and it's a good gift considering you put so much effort in it
- Q: how to build a crane using:woodelasticsgluescrews/boltsbottlessyringesnailsplastictin canand rubber tubingplease be detailed,thanks! :)
- Carefully. okorder has kit numbers and downloadable instructions for many Lego cranes. You might be able to find some of them on OKorder. You may not need to actually build the Lego crane. Instead, look at the model, determine the major pieces (wheels, turntable, arm, etc.). Then, look at your bundle of pieces and make something with the same function.
- Q: You know those machines you pay and get like 15 seconds to operate the fricken metal hand?Can you give me some tips?
- make sure you find something that isn't trapped by anything else in the pit.. line up the crane one the front, then move over to the side and line it up... these machines used to be a lot easier 20 years ago, but now the arm doesn't apply much pressure.. it has to be lined up just right or you will never get anything...
- Q: how do they erect those large tower cranes you see on big building projects?
- with another crane. assemble the tower first in sections, assemble the jib on the ground then lift it into place
Send your message to us
Tower Cranes Self Climbing with High Efficiency 4ton 5510
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords