Tower Crane VFD PLC 16 Ton Max Capacity CMAX

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 16T Maximum Lifting Height(M): 200M Rated Loading Capacity: 3.5T
Span: 71M Rated Load Moment: 315T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC7021(QTZ250) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

 

Technical Sheet for TC7135

 

Free standing   height (m)

50

Max height   with attachment (m)

200

Working range   can be adjustedm

5055606571

Min working   rangem

2.5

Max lifting   capacityt

16

Tip load @ 71mt

3.5

Hoist   mechanism (VFD+PLC)

Falls

2

4

Lifting   capacityt

04

08

08

016

Speedm/min

080

040

040

020

Motor

YZPBF280-8-55KW

Trolleying   mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YPBE132M-4-7.5KW

Slewing   mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YLEW112M-6-120N.M×2

Climbing speedm/min

0.5

Counterweightt

26

Mast section   sizeL×W×Hm

2×2×3

Working   temperature

-40+60

Total power (KW)

95

Power supply   requirement (KVA)

255KVA for   generator

Cable type (   within 30 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup   voltage & current

380V×95%=361V  260A

Rated working   voltage & current

380V  146A

 

Loading diagram

 

70m jib length

R

3.718.26

20

22

24

26

28

30

32

4 Falls (t)

16

14.48

13.02

11.8

10.77

9.89

9.12

8.45

R

34

36

38

40

42

44

46

48

4 Falls (t)

7.86

7.34

6.87

6.44

6.06

5.71

5.39

5.1

R

50

52

54

56

58

60

62

64

4 Falls (t)

4.84

4.59

4.36

4.15

3.95

3.76

3.59

3.43

R

66

68

70

4 Falls (t)

3.28

3.14

3

           

71m jib length

R

4.735.36

36

38

40

42

44

46

48

2 Falls (t)

8

7.98

7.38

6.96

6.58

6.24

5.93

5.64

R

50

52

54

56

58

60

62

64

2 Falls (t)

5.37

5.13

4.9

4.7

4.5

4.32

4.15

3.99

R

66

68

70

71

2 Falls (t)

3.84

3.7

3.56

3.5

 

65 m jib length

R

3.719.55

21

23

25

27

29

31

33

4   Falls (t)

16

14.79

13.36

12.16

11.15

10.27

9.5

8.83

R

35

37

39

41

43

45

47

49

4   Falls (t)

8.24

7.7

7.23

6.8

6.41

6.05

5.73

5.43

R

51

53

55

57

59

61

63

65

4   Falls (t)

5.15

4.9

4.66

4.44

4.24

4.05

3.96

3.7

 

65m jib length

R

4.738

39

41

43

45

47

49

51

2 Falls (t)

8

7.77

7.35

6.96

6.61

6.29

5.99

5.72

R

53

55

57

59

61

63

65

66

2 Falls (t)

5.47

5.23

5.02

4.81

4.62

4.45

4.28

4.2

 

60m jib length

R

3.721.45

22

24

26

28

30

32

34

4   Falls (t)

16

15.57

14.13

12.93

11.89

10.99

10.2

9.51

R

36

38

40

42

44

46

48

50

4   Falls (t)

8.89

8.34

7.84

7.4

6.99

6.61

6.27

5.96

R

52

54

56

58

60

4   Falls (t)

5.67

5.4

5.15

4.92

4.7

 

60m jib length

R

4.741.9

44

46

48

50

52

54

56

2 Falls (t)

8

7.58

7.21

6.87

6.56

6.27

6

5.75

R

58

60

61

2 Falls (t)

5.52

5.3

5.2

 

55m jib length

R

3.721.54

23

25

27

29

31

33

35

4   Falls (t)

16

14.89

13.57

12.45

11.48

10.63

9.89

9.24

R

37

39

41

43

45

47

49

51

4   Falls (t)

8.65

8.13

7.65

7.22

6.83

6.47

6.14

5.84

R

53

55

4   Falls (t)

5.56

5.3

 

55m jib length

R

4.741.6

43

45

47

49

51

53

55

56

2 Falls (t)

8

7.71

7.33

6.98

6.65

6.35

6.08

5.82

5.7

 

50m jib length

R

3.722.4

24

26

28

30

32

34

36

4 Falls (t)

16

14.85

13.58

12.5

11.56

10.74

10.011

9.37

R

38

40

42

44

46

48

50

4 Falls (t)

8.79

8.27

7.8

7.38

6.99

6.63

6.3

 

50m jib length

R

4.743.6

44

46

48

50

51

2 Falls (t)

8

7.92

7.53

7.18

6.85

6.7

 

 Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane Main Section TC5613 in China

Tower Crane Main Section TC5613 in China

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
Part: foundation, tower, wall unit, excessive section, lifting mechanism, rotating mechanism, lifting mechanism, the lifting arm, a balance arm, electrical control, safety protection device etc..Main technical parameters: maximum lifting weight, amplitude and maximum amplitudeLifting torque = magnitude X maximum amplitude lifting
Q:What does the lifting mechanism mean in a tower crane?
Magnification, in simple terms, refers to several ropes through the hookIf it is one in and out of two wire rope, that is two magnificationSimilarly, two into two out is four magnification
Q:How do you become a crane operator?
Hey Patrick, I was formerly a tower crane erector out of Washington DC. BUt, to yor question, I wold highly recommend you go to your town's Operator engineers Union Hall and inquire as to the qualifications and requirements to enroll in their apprenticeship program. Yes you will have to go thru the apprenticeship program. A tower crane operator is a coveted job among operators... You have to learn to hold your 'P for long periods as well as have great depth perception You coming out of the service, you should be given some preference Good luck
Q:how do they get cranes on top of building sites?
It's crazy but they actually use the crane to build itself!!!
Q:How do I get on the cranes on the Highrise map in MW2?
NO okorder.com/
Q:Why do tower cranes need to be fabricated?
The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3-4 times the same structure light steel wire rope (laboratory comparable conditions) with the research on the wear resistance of phosphating, and greatly enhance the possibility of. Manganese phosphating is bonderizing, can solve the wear problems of wire rope used in the process, according to the current market situation of wire rope, manganese phosphating coating of steel wire rope price is higher than that of plain steel wire rope, and prolonging the service life of much higher than the rate of price increase, so the phosphating coating steel wire rope daily use fee is only plain steel wire 30-45% rope, the use of lower cost, higher cost, smooth steel wire rope is eliminated. For reference only
Q:paper cranes?
Most people give paper cranes to their love ones who are ill. Since it is a tedious job, they will all help each other in folding it. Shalbi I may be wrong, but I know that to be able to make a wish, you have to fold the cranes yourself. The wish can be anything, but the most common wish is to recover from sickness and have a prosperous life. A crane signifies longevity and fidelity that is why they like to use them on weddings. ^_^
Q:On Batman Begins what is Dr. Crane's full name?
johnathan crane..no middle was mentioned..if i'm not mistaken...
Q:would someone who study both white crane kung-fu & ninjutsu be called a mixed martial artist?
My strictly Kung Fu favorites are Fearless, Ip Man, Ip Man 2. Kung Fu Hustle and Four Dragons come in very, very close behind. Ong Bak 2 showcased some Kung Fu, but wasn't strictly. If it counts, it'd rate with Kung Fu Hustle and Four Dragons, but wouldn't make my top three.
Q:Brief introduction of ten no hanging criterion for tower crane operation
8, oxygen acetylene generator with explosive materials are not allowed to hang; 9, mechanical safety device failure or sick when not hanging; 10, bad weather, more than six winds not hanging.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range