• Tower Crane TC6520 VFD+PLC Technical Control System 1
  • Tower Crane TC6520 VFD+PLC Technical Control System 2
  • Tower Crane TC6520 VFD+PLC Technical Control System 3
  • Tower Crane TC6520 VFD+PLC Technical Control System 4
  • Tower Crane TC6520 VFD+PLC Technical Control System 5
Tower Crane TC6520 VFD+PLC Technical Control

Tower Crane TC6520 VFD+PLC Technical Control

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
10T
Maximum Lifting Height(M):
200M
Rated Loading Capacity:
2.0M
Span:
65M
Rated Load Moment:
160T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6520(QTZ160) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

Specification of Tower Crane

 

Technical Sheet for TC6520

 

Free standing   height (m)

50

Max height   with attachment (m)

200

Working range   can be adjustedm

556065

Min working   rangem

2.5

Max lifting   capacityt

10

Tip load @ 65mt

2

Hoist   mechanism (VFD+PLC)

Falls

2

4

Lifting   capacityt

02.5

05

05

010

Speedm/min

080

040

040

020

Motor

YZPBF250M1-6-45KW

Trolleying   mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YZPBE132S-4-5.5KW

Slewing   mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YTW112M-4-5.5KW×2

Climbing speedm/min

0.5

Counterweightt

21.3

Mast section   sizeL×W×Hm

2×2×3

Working   temperature

-40+60

Total power (KW)

63

Power supply   requirement (KVA)

230KVA for   generator

Cable type (   within 35 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup   voltage & current

380V×95%=361V      219A

Rated working   voltage & current

380V                 121A


Loading diagram

 

65m jib length

R


20

25

30

35

40

46

48

a=2 (t)

5t---29.1m

4.84

4.1

3.53

3.02

2.87

a=4 (t)

10t---14.73m

7.33

5.8

4.77

4.03

3.46

2.95

2.8

R

50

52

54

56

58

60

62

64

65

a=2 (t)

2.74

2.62

2.5

2.4

2.3

2.21

2.12

2.04

2.00

a=4 (t)

2.67

2.55

2.43

2.33

2.23

2.14

2.05

1.97

1.93

 

60m jib length

R


20

25

30

36

38

40

42

a=2 (t)

5t---35.67m

4.95

4.67

4.42

4.19

a=4 (t)

10t---18.15m

9.06

7.2

5.94

4.88

4.6

4.35

4.12

R

44

46

48

50

52

54

56

58

60

a=2 (t)

3.98

3.79

3.61

3.45

3.3

3.16

3.03

2.91

2.8

a=4 (t)

3.91

3.72

3.54

3.38

3.23

3.09

2.96

2.84

2.73


55m jib length

R


20

25

30

32

34

36

38

a=2 (t)

5t---37.75m

4.97

a=4 (t)

10t---19.23m

9.61

7.64

6.31

5.89

5.52

5.19

4.90

R

40

42

44

46

48

50

52

54

55

a=2 (t)

4.70

4.45

4.23

4.03

3.85

3.67

3.52

3.47

3.3

a=4 (t)

4.63

4.38

4.16

3.96

3.78

3.6

3.45

3.3

3.23

  

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane 8T Max Capacity TC6014 Factory

Tower Crane 8T Max Capacity TC6014 Factory

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

Q: I am doing uni coursework to design an ergonomic layout for an operator cab for a tower crane and so I need to list the required operator controls.Thanks!
There are only two control levers that are on a tower crane.There is one on either side of the seat called joy sticks the right side joy stick controls the hoist cable to go up and down pushed forward to go down and pulled back to hoist up.The left has four functions it controls the swing of the crane and also the boom of the crane to control the swing you push the lever to the left to swing left and push the lever right to swing right.You pull the lever back to boom up and puh it forward to boom down.
Q: i probably sound like an idiot asking this question :Pis it electricity? fossil fuel burning involved? pulleys? how does the pulley work? any human power involved? specifically, how is it stupid to lift a chair that can be lifted by a person, with a crane?
Most cranes are diesel engine powered hydraulics and hydraulic motor. So that would be fossil fuel. Some cranes use pulleys to magnify the total lifting capacity. A pulley magnifies work by exchanging distance for lifting power. For example, to lift a 10 ton weight 20 feet in the air, if you put four pulleys in there so that 80 feet of cable would have to be pulled up , then it would only take 1/4 the amount of power to lift that 10 tons (2.5 ton lifting force would lift it) Look at any links or wikipedia for how compound pulleys work.
Q: In Scottsdale AZ I have never noticed them before this year. They are on the walls all around our doors.
Crane FLIES not cranes. The winter crane fly has an abundant hatch--well, during early spring or late winter. In this they are just everywhere--this species just does this sort of thing. Typically crane flies are a rather rare sight, such as during the summer months, usually of an entirely different species. There's really not much to explain their abundance.
Q: I want to know how to make the best and easyist paper crane with origami.
find the instructions online...and fold them. crease the folds a lot so it is more crisp...that's about all i can tell you, because i can't give you the instructions.
Q: Ever felt like a paper crane?
Made to fly, bended to will, broken in the process because some jerk knocked you down. At the end of the day tossed away because you're nothing more than a delicate pretty thing in their eyes, with a skin as thick as the tissue paper you're made of. Yep.
Q: What does the crane mean to the Korean people?
Long Life
Q: I need to go to a tower crane school inside Las Vegas, where do i go? At least inside Nevada. Not Arizona or Utah or California.
check with the International Union of Operating Engineers. I know that in the past, they provided the training, and past the general operators certification, there is a Crane certification, and possibly also a Tower Crane endorsement.
Q: How many meters does the tower crane installation height require expert proof?
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsAnnex No. [2009]87 [Annex two]"More than a certain size of the risk of larger sub sub project scope."Three, lifting and installation, demolition works(1) lifting projects with unconventional lifting equipment and methods with single lifting weights of 100kN and above.(two) lifting equipment installation with lifting weight 300kN and above; demolition work of climbing crane within height 200m and above.The installation and disassembly of the tower crane in accordance with the provisions of the above provisions shall be verified by the expert panel.
Q: Also, could anyone give me a site with a detailed behind the scenes look on different types of freight ships? I hold a strong interest in the shipping sector and being unsure on little details like these annoy me. Thanks!
? ? ? Onboard Cranes from the cabs on each Crane , where'd you think from ?
Q: i want to know about the origami cranes
Origami okorder

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords