• Tower Crane Spare Parts with CE certificate System 1
  • Tower Crane Spare Parts with CE certificate System 2
  • Tower Crane Spare Parts with CE certificate System 3
  • Tower Crane Spare Parts with CE certificate System 4
  • Tower Crane Spare Parts with CE certificate System 5
Tower Crane Spare Parts with CE certificate

Tower Crane Spare Parts with CE certificate

Ref Price:
$20,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month
Option:
TC4808

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Maximum Lifting Weight:
4T
Maximum Lifting Height(M):
110M
Rated Loading Capacity:
0.8T
Span:
48M
Rated Load Moment:
60KM

Detail of Tower Crane


Feature:Tower Crane 

Condition:New         

Model Number:TC4808(QTZ40) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 



Main Features of Tower Crane

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.


Specification of Tower Crane

 

Independent height (m)

31.5

Max height with attachment (m)

110

Working range can be adjustedm

384348

Min working rangem

2.25

Max lifting capacityt

4

Tip load @ 48mt

0.8

Hoist mechanism

Falls

2

4

Lifting capacityt

1

2

2

2

4

4

Speedm/min

70

35

7

35

17.5

3.5

Motor

YZTD225M2-4/8 /32    15/15/3.5KW

Trolleying mechanism

Speedm/min

20/40

Motor

YDEJ100-4 /8   2.4/1.5KW

Slewing mechanism

Speedr/min

0-0.6

Motor

YD132S-6/8  2.4/1.8KW

Climbing speedm/min

0.4

Counterweightt

7.6

Mast section sizeL×W×Hm

1.4×1.4×2m

Working temperature

-40+60

Total power (KW)

23

Power supply requirement (KVA)

115KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

25mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       180A

Rated working voltage & current

380V                   65A

Loading diagram

 

48m jib length

R

12

14

16

18

20

22

24

26

a=2 (t)

2t---20.7m

1.87

1.70

1.56

a=4 (t)

4t—10.95m

3.61

3.04

2.62

2.30

2.04

1.84

1.67

1.53

R

28

30

32

34

36

38

40

42

44

46

48

a=2 (t)

1.44

1.34

1.24

1.17

1.09

1.03

0.98

0.93

0.88

0.84

0.80

a=4 (t)

1.41

1.31

1.21

1.14

1.06

1.00

0.95

0.9

0.85

0.81

0.77

43m jib length

R

12

14

16

18

20

22

24

26

a=2 (t)

2t---21.2m

1.92

1.75

1.61

a=4 (t)

4t—11.25m

3.72

3.13

2.7

2.37

2.10

1.89

1.72

1.58

R

28

30

32

34

36

38

40

42

43

a=2 (t)

1.48

1.37

1.28

1.20

1.13

1.06

1.01

0.95

0.93

a=4 (t)

1.45

1.34

1.25

1.17

1.10

1.03

0.98

0.92

0.9

38m jib length

R

12

14

16

18

20

22

24

26

a=2 (t)

2t---21.9m

1.99

1.81

1.66

a=4 (t)

4t—11.58m

3.84

3.23

2.78

2.44

2.17

1.96

1.78

1.63

R

28

30

32

34

36

38

a=2 (t)

1.53

1.42

1.32

1.24

1.16

1.10

a=4 (t)

1.50

1.39

1.29

1.21

1.13

1.07


Images of Tower Crane


Tower Crane Max. lifting Weight 10T  in China

 

 

Tower Crane Spare Parts with CE certificate

Tower Crane Spare Parts with CE certificate

Tower Crane Max. lifting Weight 10T  in China


FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Q:Tower crane driver simulation exam which website?
The driver of the tower exam is nothing more than the operation and safety of knowledge.
Q:My understanding is that under Crane doctrine the tax basis of the property to begin with is Equity Invested + Financing (recourse or nonrecourse doesn't matter). i.e. 20K down + 80K purchase money mortgage = 100K. What if the property is appraised for only 80K right before purchase but purchaser paid 100K? Is the tax basis 80K or 100K.In other words, is the tax basis the actual assessed value of the property or is the tax basis the total investment?Thanks,Ben
Your understanding of Crane is correct. For purposes of calculating the gain on sale, the basis would be $100k. What Crane really said was that the net proceeds would have to include any assumed debt, in addition to any cash received -- basically that you had to include the debt on both ends of the transaction if my reading is correct. (That jives with the example in Commissioner v Tufts et al, 81-1356 so I think we're correct on that.) Where basis gets interesting is when you are calculating depreciation. At least when you convert a residential property to business use -- i.e. a rental -- you use the LESSER of the cost basis (Crane) or the FMV on the date that the property is placed in business(rental) service. In your example, the depreciable basis would be $80k since that was the lower. For calculating the gain on sale, the cost basis would still be $100k (adjusted down for any depreciation allowed or allowable while in business use of course).
Q:crane signals?
There are hand signals which are used by men not operating a larger crane for hoisting,lowering,stopping, holding and slow. There are more but you would get a better idea in the link below. Scroll to pictures. 2nd link is a place to purchase placards or magnetic backed visuals.
Q:tnx for answering :)
I'm not sure what's behind it.. but if you fold a thousand paper cranes, you can make a wish..
Q:So Pretty much, there is a crane, and there are four blue minions on top. I can pick them up, and carry them back and forth, but I can't get them down. If I drop them in the middle they always die. Can somebody give me a way to beat this?
Found the answer!:) By that point, if you did everything right you should have 8 blue minions. Put 6 of them on the crane and 2 of them(with a guard marker) in the middle where you ar gonna drop the ones from above. Then when you drop them, the ones guarding will pick them up and heal them.:) P.S.A tip, if you want the crane to come back slower don't remove all the minions from it, just remove 2 and the rest will slow it down. Hope this helped, have fun.:)
Q:Please help. I need real answers.
About Ichabod Crane, the school master, Washington Irving writes in A Legend of Sleepy Hollow: He was, in fact an odd mixture of small shrewdness and simple credultiy. His appetite for the marvellous, and his powers of digesting it, were equally extraordinary; and both had been increased by his residence in this spellbound region. Ichabod Crane digests Cotton Mather's (a Puritan preacher) History of New England Witchcraft, a book in which he firmly and most potently believes. He spends many hours reading Mather's work, and fluttered by his excited imagination he believes that he is struck with a witch's token at times. To drive away the evil spirits, he sings psalm tunes. Nevertheless, Crane still delights in the supernatural, so he spends winter evening with the old Dutch wives who exchange tales of ghosts and goblins around the fire. In turn, Ichabod entertains them with Mathers's reports on witchcraft, as well as predicting what the sounds in the winter air portend.
Q:ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
Q:How To Make Origami Crane?
You okorder and see how to make origami crane step by step
Q:Synopsis for the poem Lost Dances Of Cranes?
If this is the poem, you will find several comments at the link provided. Your fields are empty now. Only your ghosts dance while cranes of another kind dance cities into being. All that remain of you are a fading crackle of your energy and some grainy video footage that people in the new cities will watch to marvel at the wonders the world once held. craftygreenpoet.blogspot .uk/20...
Q:Ty Crane is the star basketball player for st.francis, what is he doing now? Where is he? Why is he not in the NBA?
Ty Crane is actually at Venice Beach in Los Angeles I just saw him, he was selling his mix tapes, we talked then he said he was Ty Crane the actor from Coach Carter. He smiled eveytime he said he was a movie star. Go to Venice beach by the weights and courts and you will see him there!!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords