Tower Crane Spare Parts with CE certificate
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
- Option:
- TC4808
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Item specifice
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC4808(QTZ40)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Specification of Tower Crane
Independent height (m) | 31.5 | ||||||
Max height with attachment (m) | 110 | ||||||
Working range can be adjusted(m) | 38、43、48 | ||||||
Min working range(m) | 2.25 | ||||||
Max lifting capacity(t) | 4 | ||||||
Tip load @ 48m(t) | 0.8 | ||||||
Hoist mechanism | Falls | 2 | 4 | ||||
Lifting capacity(t) | 1 | 2 | 2 | 2 | 4 | 4 | |
Speed(m/min) | 70 | 35 | 7 | 35 | 17.5 | 3.5 | |
Motor | YZTD225M2-4/8 /32 15/15/3.5KW | ||||||
Trolleying mechanism | Speed(m/min) | 20/40 | |||||
Motor | YDEJ100-4 /8 2.4/1.5KW | ||||||
Slewing mechanism | Speed(r/min) | 0-0.6 | |||||
Motor | YD132S-6/8 2.4/1.8KW | ||||||
Climbing speed(m/min) | 0.4 | ||||||
Counterweight(t) | 7.6 | ||||||
Mast section size(L×W×H)m | 1.4×1.4×2m | ||||||
Working temperature | -40-+60℃ | ||||||
Total power (KW) | 23 | ||||||
Power supply requirement (KVA) | 115KVA for generator | ||||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||||
Startup voltage & current | 380V×95%=361V 180A | ||||||
Rated working voltage & current | 380V 65A |
Loading diagram:
48m jib length:
R | 12 | 14 | 16 | 18 | 20 | 22 | 24 | 26 | |||||
a=2 (t) | 2t---20.7m | 1.87 | 1.70 | 1.56 | |||||||||
a=4 (t) | 4t—10.95m | 3.61 | 3.04 | 2.62 | 2.30 | 2.04 | 1.84 | 1.67 | 1.53 | ||||
R | 28 | 30 | 32 | 34 | 36 | 38 | 40 | 42 | 44 | 46 | 48 | ||
a=2 (t) | 1.44 | 1.34 | 1.24 | 1.17 | 1.09 | 1.03 | 0.98 | 0.93 | 0.88 | 0.84 | 0.80 | ||
a=4 (t) | 1.41 | 1.31 | 1.21 | 1.14 | 1.06 | 1.00 | 0.95 | 0.9 | 0.85 | 0.81 | 0.77 | ||
43m jib length:
R | 12 | 14 | 16 | 18 | 20 | 22 | 24 | 26 | |||||
a=2 (t) | 2t---21.2m | 1.92 | 1.75 | 1.61 | |||||||||
a=4 (t) | 4t—11.25m | 3.72 | 3.13 | 2.7 | 2.37 | 2.10 | 1.89 | 1.72 | 1.58 | ||||
R | 28 | 30 | 32 | 34 | 36 | 38 | 40 | 42 | 43 | ||||
a=2 (t) | 1.48 | 1.37 | 1.28 | 1.20 | 1.13 | 1.06 | 1.01 | 0.95 | 0.93 | ||||
a=4 (t) | 1.45 | 1.34 | 1.25 | 1.17 | 1.10 | 1.03 | 0.98 | 0.92 | 0.9 | ||||
38m jib length:
R | 12 | 14 | 16 | 18 | 20 | 22 | 24 | 26 | |||||
a=2 (t) | 2t---21.9m | 1.99 | 1.81 | 1.66 | |||||||||
a=4 (t) | 4t—11.58m | 3.84 | 3.23 | 2.78 | 2.44 | 2.17 | 1.96 | 1.78 | 1.63 | ||||
R | 28 | 30 | 32 | 34 | 36 | 38 | |||||||
a=2 (t) | 1.53 | 1.42 | 1.32 | 1.24 | 1.16 | 1.10 | |||||||
a=4 (t) | 1.50 | 1.39 | 1.29 | 1.21 | 1.13 | 1.07 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:Tower crane driver simulation exam which website?
- The driver of the tower exam is nothing more than the operation and safety of knowledge.
- Q:My understanding is that under Crane doctrine the tax basis of the property to begin with is Equity Invested + Financing (recourse or nonrecourse doesn't matter). i.e. 20K down + 80K purchase money mortgage = 100K. What if the property is appraised for only 80K right before purchase but purchaser paid 100K? Is the tax basis 80K or 100K.In other words, is the tax basis the actual assessed value of the property or is the tax basis the total investment?Thanks,Ben
- Your understanding of Crane is correct. For purposes of calculating the gain on sale, the basis would be $100k. What Crane really said was that the net proceeds would have to include any assumed debt, in addition to any cash received -- basically that you had to include the debt on both ends of the transaction if my reading is correct. (That jives with the example in Commissioner v Tufts et al, 81-1356 so I think we're correct on that.) Where basis gets interesting is when you are calculating depreciation. At least when you convert a residential property to business use -- i.e. a rental -- you use the LESSER of the cost basis (Crane) or the FMV on the date that the property is placed in business(rental) service. In your example, the depreciable basis would be $80k since that was the lower. For calculating the gain on sale, the cost basis would still be $100k (adjusted down for any depreciation allowed or allowable while in business use of course).
- Q:crane signals?
- There are hand signals which are used by men not operating a larger crane for hoisting,lowering,stopping, holding and slow. There are more but you would get a better idea in the link below. Scroll to pictures. 2nd link is a place to purchase placards or magnetic backed visuals.
- Q:tnx for answering :)
- I'm not sure what's behind it.. but if you fold a thousand paper cranes, you can make a wish..
- Q:So Pretty much, there is a crane, and there are four blue minions on top. I can pick them up, and carry them back and forth, but I can't get them down. If I drop them in the middle they always die. Can somebody give me a way to beat this?
- Found the answer!:) By that point, if you did everything right you should have 8 blue minions. Put 6 of them on the crane and 2 of them(with a guard marker) in the middle where you ar gonna drop the ones from above. Then when you drop them, the ones guarding will pick them up and heal them.:) P.S.A tip, if you want the crane to come back slower don't remove all the minions from it, just remove 2 and the rest will slow it down. Hope this helped, have fun.:)
- Q:Please help. I need real answers.
- About Ichabod Crane, the school master, Washington Irving writes in A Legend of Sleepy Hollow: He was, in fact an odd mixture of small shrewdness and simple credultiy. His appetite for the marvellous, and his powers of digesting it, were equally extraordinary; and both had been increased by his residence in this spellbound region. Ichabod Crane digests Cotton Mather's (a Puritan preacher) History of New England Witchcraft, a book in which he firmly and most potently believes. He spends many hours reading Mather's work, and fluttered by his excited imagination he believes that he is struck with a witch's token at times. To drive away the evil spirits, he sings psalm tunes. Nevertheless, Crane still delights in the supernatural, so he spends winter evening with the old Dutch wives who exchange tales of ghosts and goblins around the fire. In turn, Ichabod entertains them with Mathers's reports on witchcraft, as well as predicting what the sounds in the winter air portend.
- Q:ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
- You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
- Q:How To Make Origami Crane?
- You okorder and see how to make origami crane step by step
- Q:Synopsis for the poem Lost Dances Of Cranes?
- If this is the poem, you will find several comments at the link provided. Your fields are empty now. Only your ghosts dance while cranes of another kind dance cities into being. All that remain of you are a fading crackle of your energy and some grainy video footage that people in the new cities will watch to marvel at the wonders the world once held. craftygreenpoet.blogspot .uk/20...
- Q:Ty Crane is the star basketball player for st.francis, what is he doing now? Where is he? Why is he not in the NBA?
- Ty Crane is actually at Venice Beach in Los Angeles I just saw him, he was selling his mix tapes, we talked then he said he was Ty Crane the actor from Coach Carter. He smiled eveytime he said he was a movie star. Go to Venice beach by the weights and courts and you will see him there!!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane Spare Parts with CE certificate
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
- Option:
- TC4808
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords