• Tower Crane SCD90 With high efficiency and excellent timing capacity System 1
  • Tower Crane SCD90 With high efficiency and excellent timing capacity System 2
  • Tower Crane SCD90 With high efficiency and excellent timing capacity System 3
  • Tower Crane SCD90 With high efficiency and excellent timing capacity System 4
Tower Crane SCD90 With high efficiency and excellent timing capacity

Tower Crane SCD90 With high efficiency and excellent timing capacity

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
KIND REMINDER:
WE ALSO MANUFACTURE OTHER TYPES OF MASTSECTION AND OTHER TOWER CRANE
SPARE PARTS, SUCH AS LIFTING JIB, TIE-IN
COLLAR, CLIMBING CAGE AND HOOK.  
WE WISH TO PRODUCE MOST-SATISFIED PRODUCTS FOR YOU!

PLEASE FREELY CONTACT US FOR INQUIRY!


Specification of SCD90


Jib Length: 45m

Tip load:2.2ton

Max Load:8ton

Free standing height: 52m(2X2X3m mast section); 34m (1.6X1.6X3m mast section)

Hoisting Mechanism: 45RCS20 or 30LVF

Luffing:30RWA

Slewing: RCV95

Container loading for free standing height:5X40HQ

Tower Crane SCD90 With high efficiency and excellent timing capacity

1.With high efficiency and excellent timing capacity, the tower crane is liable and safe. The rotating structure is driven by Epicyclic reducer. The elevating system is featuring in tight structure, high efficiency, convenient to use and maintain and safety.

2.Safety devices are integral and belong to mechanic and electric appliances with great reliability and can be used in wild and harsh environment.

3.The tower crane applies hanging jibs with large breadth and bi-tie bars. The jibs is very rigid , light in weight, pleasing to eyes, small in base with great capacity to shoulder pressure and resist wind.

 


Q:what is the difference between rigging, wire rope and rope?
Wire rope is twisted line made of stainless, or high tensile steel. Rigging refers to the slings, or chains that attach the load to the lift hook. Rigging also refers to the act of attaching a load to a load handling device, such as a crane.
Q:Romney woulda had that thing fixed by now.
Obama hates cranes!
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
Fast Crane = A unload x /hour Slow Crane = B unload y /hour A + B = 8 hours x /hour + y /hour = 8 hours (average rate) average rate = (x + y) / 2 so 8 hours = (x + y) / 2 and x + y = 16 since the slow crane is 12 hours longer, x must be 2 hours, since they will both take 2 hours and the slower crane will take 2 hours plus 12 hours equalling 14 hours. The rate of crane A is 2 hours to unload and the rate of crane B is 14 hours to unload. The average rate for both to unload is 8 hours. There were certain assumptions made to solve this puzzle and it is not clear how they actually operate on the ship while unloading. ~~ The most practical way to unload the ship is *NOT* to use the slower crane since it takes longer for them to work combined, than for the faster crane to work alone !! A tricky but fun question !! :-b
Q:did stephen crane win any awards?
Stephen Crane (November 1, 1871 – June 5, 1900) was an American novelist, short story writer, poet and journalist. Prolific throughout his short life, he wrote notable works in the Realist tradition as well as early examples of American Naturalism and Impressionism. He is recognized by modern critics as one of the most innovative writers of his generation.
Q:Tiger=StrengthSnake=FlexibilityCrane=Balance and the last two are?
Theres well over 300 different styles of Kung Fu.
Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
Q:Tower cranes sometimes have very long booms, but seem to usually have fixed counter-weights at fixed positions behind the cab. Why doesn't it flip backwards when there is no load, or flip forwards when a load is way at the far outward end of the boom? It seems to be a very large range of moment arms given that the counter-weight has a fixed one.
I think the counter weights are connected to a pully system that directly interacts with the boom and hook movement. This way it can put more or less pull on the weights according to the amount of weight or position of the weight on the crane.
Q:No inspector would intentionally overlook a dangerous existing situation re: crane usage in a major city---so what went wrong--never before has this happened and now two majjor incidents?
I think they are accidents. Unfortunately people who work for the city government - at least in NY - are incredibly incompetent and corrupt. What makes you say that No inspector would intentionally overlook a dangerous existing situation ? That 's exactly what the inspector of the first crane collapse did. Oops, my mistake. He didn't check the cranes at all. And all those people who died recently in construction by being blown off by wind from great heights??!! I have never heard anything like that before. Who gives these people the necessary permits?? How trained are these people? Where is their union?
Q:What does a track type tower crane look like? In that case, use?
The rail type multi characteristic tower crane consists of track, door frame, main arm, auxiliary arm, hook and so on. Its features are: A, crane through the door frame (2), supported on a track (1); B, the door frame (2) is provided with a rotary bearing (3); C (3) is arranged on the rotary supporting all kinds of machinery and equipment (4), and balance weight (8); D, the main arm (5) the jib (6) through the bearing cable (7) is installed on the rotary support (3); E, the main arm (5) side arm (6) and Russo (7) can have a variety of length combination; F, a main arm, jib all tube truss structure; G, hook pulley h, equipped with a variety of rate; the torque limiter (10) and amplitude detection device (11); I, operating room in slewing bearing (3); J, self moving use winch is luffing winch main arm, mounted on a rotary support (3).Track type multi characteristic tower crane. The utility model is especially suitable for power construction and hoisting operation. The slewing support on the track type door frame is provided with a main and an auxiliary arm frame, and various variants can be formed through different combinations. Its maximum torque of 3360 tons meters, the maximum lifting capacity of 140 tons, the maximum working range of 60 meters, the maximum rise of 120 meters. The utility model can be carried in the lifting, and the work is smooth and safe. The main and auxiliary arms are all truss structures, light in weight. The electronic torque limiter and other safety devices are adopted, and the 130 meter high machine can be installed by itself. This machine can also be used in petroleum, chemical, metallurgical and other large projects.
Q:In the poem "The Wayfarer”, what is Crane's ironic comment on the pursuit of truth?
On a semi-close inspection, it would seem to me that Crane is saying that, ironically, the truth hurts. He's making a statement similar to Shakespeare in Hamlet. Hamlet is NOT muddled by indecision, as so many poor readers have often thought, but he sees much too much of the truth of the way of the world, and sees how futile and terrifying it is, and is embarrassed, or even humorously angered, that he should be asked to fix the world in the face of such impossible distress and futility. Similarly, the path to truth in Crane's The Wayfarer is overgrown with painful daggers which, if you step onto the path, will cut up your feet; if you take the path and find truth, you'll be hurt and dumbstruck and terrified by this path, so that the Truth (with a capital 'T') itself convinces the poem's 'hero' to turn to a different path, to choose something other than truth. And he doesn't even need to walk the path at all, only get a bit of a glimpse into truth, in order to be terrified by it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords