• Tower Crane with High Quality and Competitive Price System 1
  • Tower Crane with High Quality and Competitive Price System 2
  • Tower Crane with High Quality and Competitive Price System 3
Tower Crane with High Quality and Competitive Price

Tower Crane with High Quality and Competitive Price

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our tower crane:

1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

 

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Independent height (m)

31.5

Max height with attachment (m)

110

Working range can be adjusted(m) 

38/43/48

Min working range(m) 

2.25

Max lifting capacity(t)

4

Tip load @ 48m(t)

0.8

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1

2

2

2

4

4

Speed(m/min)

70

35

7

35

17.5

3.5

Motor

YZTD225M2-4/8 /32    15/15/3.5KW

Trolleying mechanism

Speed(m/min)

20/40

Motor

YDEJ100-4 /8   2.4/1.5KW

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YD132S-6/8  2.4/1.8KW

Climbing speed(m/min)

0.4

Counterweight(t)

7.6

Mast section size(L×W×H)m

1.4×1.4×2m

Working temperature

-40-+60°C

Total power (KW)

23

Power supply requirement (KVA)

115KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

25mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       180A

Rated working voltage & current

380V                   65A

 

TC4808 with CE ISO certificate top kit 4T types of tower crane price for sale

Q:Who do you think was better and who would've won if they faced.
willie with out a doubt
Q:Calculate how much power the crane has?
the crane ?? The crane is not defined.
Q:stories about paper cranes?
Sadako and the Thousand Paper Cranes by Eleanor Coerr - about a girl who gets luekemia from the Atom bomb dropped on Hiroshima and her making paper cranes to pass the time in the hospital.
Q:What were Henry's reasons for becoming a soldier? What about the war was so attractive to him?Why do you think it took Henry so long to begin contemplating his part in battle?How do Jim and Wilson respond to Henry's question? What does this tell you about them?Share your thoughts...
Henry begins the book as an idealistic and completely self-absorbed teenager who wants nothing more than a chance to show off and be thought of as a brave and daring male. From Shmoop
Q:What are equations /formulas that use to calculate maximum vertical load values, the maximum length of boom?
Hello, Briefly, the structure of the crane or lifting mechanism is not usually the limiting case. The limiting case is to ensure that the Center of Gravity of the mobile crane with the load is such that it is bound within the tires or footprint of the crane. If this load is outside the footprint, the crane tips over.
Q:Whenever a vista shot of London comes up, there are a ridiculous amount of cranes. What's up? Are they always building something?
I have no idea why I'm even wasting my time writing this non sense that won't end up helping you what so ever. If I knew the answer to your question I wouldn't mind helping you but considering I'm almost on the other side of the planet, California, I have no idea what to tell you. I guess I just want the points so I can ask a question myself...it's probably the Indians or Pakistanis.
Q:What are the common problems encountered in hiring cranes for house constructions?
It might not be the right size for the job.
Q:who can tell me tower crane details?
1. Accurate positioning Kinematic limit, High-repetition-accuracy torque,weight limiter ; 2. Unique, and reliable car off-axis device and Trolley Anti broken rope Safety Device; 3.Independent of side driver's cab,its Vision is good,with a large space in the tower crane driver's cab,Using linkage console,Configuration ottoman, convenience, and comfort; 4. Machine appearance as an international pop style, beautiful and generous 5. Long boom, operating a large space, a rigid double-bar suspension, light weight, cross-section is small, air resistance is small, the leading domestic;
Q:In the end of chapter 16 of Catching Fire the 2nd book of the Hunger Games it says the name she wrote in the dummy, was Seneca Crane. Who is that?!,
Seneca Crane was the man who ran the Hunger Games in the year that Katniss was in it. He was killed in the end because in the time HE ran the games, TWO people were allowed to win, and President Snow had him killed. It effected the Gamemakers when she wrote it on the dummy because they were shocked and reminded about punishments if they run the games wrong.
Q:I just can't figure this out. They need a crane to assemble tall buildings, but how do they assemble the crane? Especially if the building is over 20 stories high. What crane can build a crane higher than itself?
a mobile crane sets the original lower sections in place, and then the crane is assembled in 6' sections as it climbs itself.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords