TOWER CRANE H6024 TC6024 MAX. LOAD 12TON

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  

Brief Description

  • Feature: Tower Crane

  • Condition: New

  • Application: construction

  • Rated Lifting Moment: 200MT

  • Max. Lifting Load: 12T

  • Max. Lifting Height: 183.7m

  • Span: 60M

  • Place of Origin: China (Mainland)

  • Brand Name: CNBM

  • Model Number: H6024

 

 

Main features

TC6024 tower crane is a company based GB/T5031-2008 《tower crane》design and manufacture of a construction crane. It can be applied widely in high-rise civilian building, bridge and water-conservancy project, big-span industrial workshop and high-rise building, etc. the tower crane is high level slewing self-erecting tower crane which adopts horizontal jib and trolley-jib. The main features as follows:

Height of the tower crane is confirmed according to height of building, lifting ability of the tower crane is independent of height.

The tower crane with features as high working speed, stead work condition and high efficiency.

Hoisting jib has 55m or 60m and 65m three ranges. This meets project needs more widely.

The eyeshot of cab is well, and the cab is installed independently,which creat preferable working condition for handlers.

Location of the tower crane is reasonable, and the externality of the crane is beautiful.

Lifting jib adopts rigid double tension bars with features as light structure.

?the operation is simple and the maintenance is convenient

 

TOWER CRANE H6024 TC6024 MAX. LOAD 12TON

TOWER CRANE H6024 TC6024 MAX. LOAD 12TON

TOWER CRANE H6024 TC6024 MAX. LOAD 12TON

TOWER CRANE H6024 TC6024 MAX. LOAD 12TON

TOWER CRANE H6024 TC6024 MAX. LOAD 12TON

TOWER CRANE H6024 TC6024 MAX. LOAD 12TON

TOWER CRANE H6024 TC6024 MAX. LOAD 12TON

TOWER CRANE H6024 TC6024 MAX. LOAD 12TON

 

Parameter List

TOWER CRANE H6024 TC6024 MAX. LOAD 12TON

 

Packaging & Delivery

Packaging Details:In Nude/40'HQ/ Wooden case
Delivery Detail:30

 

  

Packaging & Shipping


All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
 
 

 

 

 Our Service


1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do they get cranes off HUGE buildings when they are finished building them.?
Large okorder.com.
Q:How do crane operators get up there?
There are ladders leading up there. Crane operators are fit enough to do the climb at least twice a day. I climbed cranes on weekends as a hobby photographer to take panoramic shots from that nice position up there. It was quite a climb to get up more than 200ft (60m)
Q:which is crane lift planning software free to download?
autocad based
Q:What is the allowable range of vertical deviation for tower cranes?
Previous answers to this question have been made. In the industry standard "construction site inspection of machinery and equipment technical specification" (JGJ160-2008), in the form of mandatory provisions: the tower crane installation height to basic design requirements, the axis of the tower line should be no more than 0.4% of the bearing surfaces of the lateral vertical deviation; after the attachment, the highest attachment point following the vertical deviation should be less than 0.2%. "The basic height of the design requirements" in the "strong regulation", that is, the maximum independent installation height on the site".
Q:Climbing process of an internal climbing tower crane
Climbing tower crane, usually installed in the elevator shaft building or ad hoc Bay, also can be installed in the cylinder structure, by means of a climbing mechanism increases with the structure increases, generally every building 3~8m, crane climbing a tower, its height is only 20m left and right, lifting height with construction height and.
Q:How do I make the best paper crane?
find the instructions online...and fold them. crease the folds a lot so it is more crisp...that's about all i can tell you, because i can't give you the instructions.
Q:Is there a world record for making paper cranes?
I would love to find out and compare it to the commercial where the girl is in the bathroom making toliet paper cranes. Since it's not published online - you'd have to find someone with a new copy of Guinness World Records
Q:Is it true that crane flies are THE most venomous insects in the world?
RE: Is it true that crane flies are THE most venomous insects in the world? I've heard that daddy longlegs aka crane flies contain the most deadly venom of all insects. The only reason they aren't dangerous or deadly is because they have no mouth or 'straw' to inject the venom. But I'm not sure what's correct. Although they cannot harm us humans,...
Q:What's the difference between QTZ63 and qtz630, isn't it the same kind of tower crane?
Should be the same series, but lifting weights are not the same
Q:Spiderman 3: What the hell happened to the crane?
1) Something happened to the crane - it doesn't matter what - it was an excuse to bring out spiderman, What happened isn't important. It was a kind of malfunction anyway - NOTHING to do with any villians 2) Gay and jerk side? He wan't being gay, but because he was a jerk in the first place that is why he didn't really know how to dress up properly and being up himself means he doesn't recognise it - which by the way, was well scripted into the movie. It was a bit of a comic relief. The symbiot brought out the darker side of him but that doesn't mean it KNOWs to make him behave appropriately.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range