Timber Beam with Competitive Price and High Bearing Capacity
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 3000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Table Formwork Description
Table formwork is used for the concrete pouring of wall. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner. Timber beam formwork is a highly efficient and convenient system for medium area slab project. They can be transported to next position as whole table units whether by trolley or by crane lift.
2. Main Features of Table Formwork
Pre-assembled table unites, repositioning work becomes easy and fast.
Table height can be adjusted easily via prop in oder to fit different storey requirement.
Easy operation, save material and time.
High rigidity and repeat rate.
High standard components make low cost available.
The construction site is safe and fast.
3. Table Formwork Images
4. Table Formwork Specifications
Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.
5.FAQ of Table Formwork
1) What promises can be done by us?
. If interested in this kind of formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
2) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
- Q:What is the bowl buckle scaffold, bowl buckle scaffold what are the characteristics?
- The transverse rod is made of welded joints of 48 mm x 3.5mm steel pipe with a certain length. Horizontal connecting rod for vertical rod, or horizontal bearing rod of frame;
- Q:Standard Specification for bowl type scaffold steel pipe diameter
- According to the specification requirements of every three vertical and horizontal cross set with scissors support; height of more than 8 meters in the low to vertical, vertical and horizontal set of scissors. Generally speaking, the technical requirements of the roof beam, the coupling beam parts are independent support, whether the existence of suspension.
- Q:Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
- The vertical distance of the vertical pole is 3 times larger than that of the wall
- Q:Fixed in the construction of steel tubular scaffolding 3 rows of what is meant
- The scaffold is common in interior formwork support, generally in the plane projection matrix, identified in the upper load situation, through the relevant calculations to determine the vertical and horizontal spacing, vertical rod erection step rails to ensure the bearing capacity of the frame body.
- Q:Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
- Bowl buckle scaffold, called bowl buckle frameThe bowl buckle frame is composed of a steel pipe vertical rod, a cross bar and a bowl buckle jointStructure of bowl frame basic construction and erection requirements and fastener type steel tube scaffold is similar, the main difference lies in the bowl. Bowl buckle connector is a connector on the bowl, bowl buckle, bar joint and the upper bowl limiting pin etc. welding buckle under the bowl and the bowl buckle pin in the vertical rod, the bowl set into the pole in the
- Q:Hi people, just wondering if the main Angkor Wat temple is still under restoration/renovation with all that green tarpaulin and scaffolding on it?I'm wondering when that will be off as it might obstruct the amazing views.Is there any restoration schedules?thanks!!
- There is some restoration of the main temple that is being funded by Japan. You can still see the main parts of the temple. The temple that has the roots growing over it is also being restored but you can also access most of it and you can get good pictures. Take plenty of water and a hat and sunscreen it is very hot.
- Q:How bad? :/ i'm a real baby when it comes to this stuff
- I think i have a pretty high pain tolerance and i thought it hurt. It wasn't terrible but it still hurt. It also is really sore after but maybe take some advil or something before and hope that may help. Good luck
- Q:Scaffolding steel pipe, the number of fasteners?Small wall scaffolding, formwork scaffolding support, the number of steel pipe and fastener calculation,
- You can simply think that 5 meters per square meter
- Q:So I'm going to get a scaffold/industrial piercing, and I had a few questions:-does your ear have to be a special quot;shapequot;? Like I mean does you outer ear cartilage rim have to stick more so it can be pierced?My outer cartilage rim is a little flat but it still sticks up -Would this make my piercing reject?Thanks! :)))
- Ummm I think it does have to be a certain shape because when I got mine my piercer said she had to check if I had the right kind of ear.
- Q:Why does this discovery both confuse and frighten her?quot;The Scarlet Letterquot;
- her husband, he has been in England while she was in America for a year or 2 can't remember; I think she thought he was dead or not coming cannot remember. It frightens her because she has a kid that cannot be his.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Timber Beam with Competitive Price and High Bearing Capacity
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 3000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords