Steel Cup Lock Scaffolding Standard
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Type: | Model Nunber: | Material: | |||
Thickness: | Color: | Length: | |||
Surface Finish: |
Packaging & Delivery
Packaging Detail: | Pallet or according to your requirement. |
Delivery Detail: | 15-35 days after the orders confirmed. |
Specifications
1. We r a factory.
2. Good price and high quality
3. 500/ 1000/ 2000/ 2500/ 3000/ 3500mm
Quick Details
Product Detail Description:
Product name | Cup Lock Scaffolding Standard |
Type | Hollow or Solid |
Materials | Q235 |
Surface Treatment | Hot dip galvanized, Painted |
Appearance color | red paint, blue paint, yellow paint, green paint, bright galvanized |
Model Number: | WJ-A004A |
Certificate | AS1576 |
Thickness | 3.8MM |
Packaging & Delivery:
Packaging Detail: | pallet |
Delivery Detail: | 15--30 days after contract |
Hot-dipped galvanized kwickstage scaffolding transom
1. Material: Q235 for other components or as your request
2. Thickness of the transom: 3.25MM
3. Standard with spigot, ledger and brace with forged connect point
4. Having our own HDG workshop. we can control the zinc thickness much better
- Q: Fixed in the construction of steel tubular scaffolding 3 rows of what is meant
- The scaffold is common in interior formwork support, generally in the plane projection matrix, identified in the upper load situation, through the relevant calculations to determine the vertical and horizontal spacing, vertical rod erection step rails to ensure the bearing capacity of the frame body.
- Q: is both 1 m farm from the scaffold. if the boeard is 20 kg in mass, how close to the end can the painter stand w/out tipping the board over?
- good one babe. Heres yet another for ya An airline captain became breaking in an extremely extraordinarily new blonde stewardess. The path they have been flying had a stay-over in yet another city. Upon their arrival the captain confirmed the stewardess the ultimate place for airline workers to consume, save and stay in a single day. the subsequent morning because of the fact the pilot became preparing the group for the day's path, he observed the hot stewardess became lacking. He knew which room she became in on the hotel and called her up thinking what occurred to her. She replied the telephone, crying, and stated she could no longer get out of her room. you may no longer get out of your room? the captain asked, Why no longer? The stewardess replied, There are in uncomplicated terms 3 doorways in right here, she sobbed, one is the bathing room, one is the closet, and one has a demonstration on it that pronounces 'do no longer Disturb'!
- Q: I have a cartilage piercing on my right ear and now I want scaffolding. Can they just pierce the other side of my ear (opposite my other cartilage piercing) and put a scaffold bar through my existing cartilage piercing hole and the new piercing hole opposite? Can I then get another cartilage piercing straight underneath the scaffolding? How much does it hurt? Thanks in advance :)
- an industrial piercing is much different than a helix. a helix is normally pieced from the from to the back of the ear while a helix is pierced from the outside to the inside of the ear. without a picture or seeing it it's hard to say so go to your local professional. piercings don't tickle. the pain shouldn't be a concern.
- Q: How bad? :/ i'm a real baby when it comes to this stuff
- I think i have a pretty high pain tolerance and i thought it hurt. It wasn't terrible but it still hurt. It also is really sore after but maybe take some advil or something before and hope that may help. Good luck
- Q: can I claim compensation for falling of scaffolding and breaking my arm?
- If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.
- Q: What's your opinion of them?
- love , i think they look really good.
- Q: What is the difference between the bowl buckle scaffold and the fastener type steel pipe scaffold? What is the difference
- . Its main function is to protect. Specific reference to JGJ 1302011 "construction fastener type steel pipe scaffolding safety technical specifications" in the relevant instructions, and illustrations.
- Q: The kind of hot galvanized scaffolding, many site use is very beautiful now, I would like to ask the material and the characteristics of this shelf there is how to install?
- In use, only need to put the plug into the hole of the ends of the cross rod pole corresponding, and then knock tightly, the quality of the demolition ride fast and overlapping is the traditional scaffold cannot do. Its erection speed is 4-8 times more than 2 times that of steel pipe scaffold. Let me explain in the form of a picture
- Q: One of my fav. when laws are unjust. like laws I don't believe in regarding freedom of body how about you..
- I don't think I get it? lol
- Q: Cost of rent per day per month per ton of scaffolding
- The rent of the wheeled scaffold varies from place to place, with different regions
Send your message to us
Steel Cup Lock Scaffolding Standard
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords