• Steel Frame Formwork GK120 with Durable Performance for High-rise Buildings System 1
  • Steel Frame Formwork GK120 with Durable Performance for High-rise Buildings System 2
Steel Frame Formwork GK120 with Durable Performance for High-rise Buildings

Steel Frame Formwork GK120 with Durable Performance for High-rise Buildings

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Steel Frame Formwork GK120

 

There is a prizing part designed in the corner, which can help to position and remove formwork easily.

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

2. Main Features of Steel Frame Formwork GK120

 

  • Light weight

  • High strength

  • High standardized system

  • Easy connection with adjustable steel clamp

  • Convenient and fast corner formwork

  • Flexible to assemble and application

 

 3. Steel Frame Formwork GK120 Images

 

 

Steel Frame Formwork GK120 with Durable Performance for High-rise Buildings

 

Steel Frame Formwork GK120 with Durable Performance for High-rise Buildings

 

 

 

4. Steel Frame Formwork GK120 Specification

 

-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

-The adjustable steel clamp is convenient to use, and can hold tightly.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

 

5. FAQ of  Steel Frame Formwork GK120

   

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects. 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issue. 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.    

Q:The latest version of the external scaffolding erection norms and template engineering construction quality acceptance specification which two ah? Thank you
The existing scaffold erection specification is JGJ130-2011 "safety technical specification for the construction of steel tubular scaffold with couplers"; JGJ166-2008 "safety technical specification for the construction of bowl buckle steel tubular scaffolding";
Q:Tips and advices regarding the piercing or healing process will be greatly appreciated. Thanks:)
It all depends on where you go. They can range between 25-35 dollars. Just remember to relax and eat a good meal before you go. Healing takes around 6 months to a year. Your piercer will instruct you on how to care for it. Always ask your piercer any and all questions you have.
Q:I am considering getting an ear scaffolding, and was wondering, is it girly???
is there a pic somewhere? ok i googled it, and it is just that long bar that goes through the top of the ear twice, and i actually know more guys with it than girls, but i am not going to lie... cartilidge piercings hurt, not when you get them done, but later on, and that has gotta be hella uncomfortable.
Q:I mean, anybody knows when will they finish the exterior restoration?
My friend, the restoriation of the outside facede of the Guggenheim Museum should be completed in spring of 2008. The exterior restoration is part of $29 million restoration project to the 46 year building. Good luck Native New Yorker
Q:Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
Horizontal not more than 6 meters, vertical not more than 4 meters!!!
Q:What are the requirements for the broken seam connection of bowl buckle scaffold. For example, broken seam on both sides of the vertical pole is very neat, with a steel pipe fastener connection side to connect a number of vertical pole, both sides of the rod is not on a line, but also how to connect?
Do you mean to do the two adjacent joint? Specification requirements shall not be within the same span and within the same level, specific referenceJGJ 1302011 steel tubular scaffolding construction safety technical specification
Q:I want this piercing in my ear called Scaffolding, it looks like this
That's also called an industrial... not any more painful then another cartilage piercing...but the healing time is usually longer.. expect soreness for 3 months to a year after you get it...
Q:The first scaffold scene is when Hester and Pearl are up there in front of the public.The second scene is with Dimmesdale, Hester, and Pearl at night. The stars create an quot;Aquot; in the sky.The third scene is in public again but with Dimmesdale and he dies.
the first is puritanistic because of public humiliation and romanic because pearl notices her father at such a young age. the second because they are together as a fam(puritans did not belive in individualism) and romantic because the stars make an A in the sky. the third because of public confession and dimmesdale dies
Q:Pankou scaffolding function how powerful
Pankou scaffolding hot-dip galvanizing process, the use of up to 15 years of age or above.
Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
0.7 - the basic wind pressure reduction coefficient determined by the return period of 5 years. In some special cases, a value above 0.7 may be used, but not less than this value.More than W0, Z, beta Z, STW are in accordance with the "building structure load code" (GBJ9-87) of the corresponding provisions of the selection or calculation to determine, which STW 6.3.1 in accordance with its table thirty-second and thirty-sixth.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords