• Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings System 1
  • Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings System 2
  • Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings System 3
Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Steel Frame Formwork GK120

 

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

 

2. Main Features of Steel Frame Formwork GK120

 

  • High standardized system

  • Easy connection with adjustable steel clamp

  • Convenient and fast corner formwork

  • Flexible to assemble and application

 

 3. Steel Frame Formwork GK120 Images

 

 

Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

 

 

4. Steel Frame Formwork GK120 Specification

 

-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

-The adjustable steel clamp is convenient to use, and can hold tightly.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

 Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

 

5. FAQ of  Steel Frame Formwork GK120

   

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.  

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.    

Q: The scaffold is 18 m long. A 650-N box sits 3.0 m from the left end. What is the tension in each wire? left wire = 520 N; right wire = 130 N left wire = 640 N; right wire = 210 N left wire = 195 N; right wire = 975 N left wire = 295 N; right wire = 1000 N can someone show me how to do this please :)
Lets call left wire T1, right = T2 T1 = (200 x 9) + (650 x 15) = 11550 11550 = 18T1 11550/18 = 641.67 N T2 = (200 x 9) + (650 x 3) = 3750 3750 = 18T2 3750/18 = 208.33 N left wire = 640 N; right wire = 210 N
Q: on a scale of 1-10
Are you seriously asking that question?
Q: Mechanical model, stability, etc.
(4) cantilever scaffold: scaffold for installation or repair of cantilever work.(6) formwork support: a frame for supporting a template and a scaffold material.5 divided by the size of occlusion(1) open type scaffold: only with the work of the railing and the foot board, no other shelter facilities scaffolding.(2) partially enclosed scaffolding: Scaffolding with an area of less than 30%.(3) semi closed scaffolding: shield area of 30% to 70% of the scaffolding.(4) fully enclosed scaffold: scaffold with full length and full height along the outer side of the scaffold.(5) open type scaffold: scaffolding provided along the periphery of the building.(6) sealing ring type scaffold: scaffolding along the periphery of the building.
Q: the shop said i might have the wrong ear shape, does anyone know of any pictures or diagrams of the wrong shape so i can see. Also what are some do's and do not's. not like cleaning cos i've read loads of them, just anything else useful. thankssharotoxxx
Hello You should have asked them I dunno whats that mean the wrong ear shape But you can always do a cartilage piercing, it looks a way better Good luck
Q: So I'm going to get a scaffold/industrial piercing, and I had a few questions:-does your ear have to be a special quot;shapequot;? Like I mean does you outer ear cartilage rim have to stick more so it can be pierced?My outer cartilage rim is a little flat but it still sticks up -Would this make my piercing reject?Thanks! :)))
You can still get the scaffold done, but it might not take to your body well. You also need to be careful of the piercer that you choose. If your piercer places the bar in the wrong place, it can cause keloids or stress bumps. This might also happen if you don't have the right ear. I got an industrial, and my piercer didn't seem to put the bar exactly where I wanted on one end. Although I took very good care of my piercing, and didn't put any stress on it, I still got a keloid on that side of the ear, and it wouldn't go away. A lot of my friends had beautiful industrials, and I couldn't figure out why mine looked the way I did until I did a little more research, and the keloid appeared because my piercer did not pierce my ear in the correct location. I had to remove the piercing for the keloid to disappear. This might happen to those who don't have ears that are fit for an industrial. If you do decide to get it, please don't mess with it (although it's hard not to). When you sleep, try cupping your hand over your ear so that you don't put pressure on the piercing. :-) If you don't know what side you'd like it on, get it on the side that you sleep on the least. You may get a bit of a stress bump around the piercing, but these tend to disappear once the piercing heals up.
Q: The other day i woke up to clean it and there was dry blood in the bottom piercing (by ear lobe) on both sides. I think it's because I got it two days before I got a bath with it and then I was sleeping weird. So anyway, my sister says I should just leave the dry blood because it helps it stay in place and it will irritate it if you pick it off but should I? It hurts even after I soak It to try take the dried blood off.
Let the dry blood come off on its own. Using a sterile saline wound wash spray twice a day to keep it clean will help soften it up and it will come off within time. You can take baths but you really need to make sure your head never gets submerged under the water while your piercing is healing. Washing your hair under the faucet is fine but rinsing it in the water you're sitting in is not.
Q: Bowl buckle type steel pipe scaffold and full fastener type scaffolding are long what kind of? What is the difference
In general, all scaffolding are used to build a bowl buckle scaffold, and rarely use fastener scaffolding to take,
Q: What were Hester's three appearances on the scaffold?1 was prosecution and another was dimmesdale's death and confession. What was the third?
I remember when Pearl was seven she they went back up on the scaffold. The only reason I rememeber is that Pearl asked dimmsdale if he was going to satnd up there with her and Hester. This was before the reader knew dimmsdale was the father.
Q: A 60.0 kg painter is on a uniform 25 kg scaffold supported from above by ropes. There is a 4.0 ? kg pail of paint to one side. Can the painter walk safely to both ends of the scaffold? If not, which end(s) is dangerous, and how close to the end can he approach safely?
If both ends of the scaffold are supported by ropes then there is no chance of the plank rotating. OHS would still complain about the lack of handrails, the fact that the plank can swing without stabilization. Not to mention that ropes are unacceptable. They should be Nylon woven tape with fixed ends and at very least a one tonne rating. However that is not the thrust of your question. If the ropes are NOT at the very ends then by passing the rope on the end which has the 4 kg can of paint the whole plank may rotate about the pivot created by the rope. This will depend on where the two ropes are on the plank.
Q: Standard Specification for steel tubes for ladder type scaffolding
Mobile ladder scaffolding used in the room, inside and outside decoration; facade advertising; bridge support; template support; full scaffolding, wall scaffolding and other uses. The utility model has the advantages of convenient loading and unloading, safety, reliability, practicability, etc.:

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords