• Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings System 1
  • Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings System 2
  • Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings System 3
Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Steel Frame Formwork GK120

 

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

 

2. Main Features of Steel Frame Formwork GK120

 

  • High standardized system

  • Easy connection with adjustable steel clamp

  • Convenient and fast corner formwork

  • Flexible to assemble and application

 

 3. Steel Frame Formwork GK120 Images

 

 

Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

 

 

4. Steel Frame Formwork GK120 Specification

 

-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

-The adjustable steel clamp is convenient to use, and can hold tightly.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

 Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

 

5. FAQ of  Steel Frame Formwork GK120

   

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.  

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.    

Q:A) what is the velocity of the brick after 4.0 s?B) how far does the brick fall during this time? This is using 9.8 m/s^2 as the acceleration
v = a*t d = (1/)at^2 Plug in the numbers.
Q:Who can give me a bowl buckle scaffold acceptance form?
1) the fastener style scaffold frame structure in the erection of the part
Q:A scaffold of mass 53 kg and length 6.5 m is supported in a horizontal position by a vertical cable at each end. A window washer of mass 80 kg stands at a point 1.7 m from one end.(a) What is the tension in the cable closer to the painter? _______________N(b) What is the tension in the cable further from the painter? _________________N
Static Equilibrium: ΣTorques: 53g(3.5) + 80g(4.8) = T(6.5) {where T = ANS (a) (53)(9.8)(3.5) + (80)(9.8)(4.8) = 6.5T 1817.9 + 3763.2 = 6.5T 5581.1 = 6.5T T = 5581.1/6.5 = 859 N ANS (a) Total weight = (53 + 80)(9.8) = 1303 ANS (b) = 1303.4 - 858.6 = 444 n
Q:is it possible to have an industrial piercing done in 2 stages? so like 1 hole first and then a few weeks later the 2nd hole done. ive found a place that for 2 holes is cheaper than having the whole process done as one. Please help :)
yes it is possible. I know people who have done that. But I suggest getting it done at once because it will hurt less in the long run. Getting your cartilage done hurts for about 2 weeks and then get the top part done that is another 2 weeks. So to get it done together it will only hurt for 2 weeks in instead of 4.
Q:What is the height limitation of the standing braces in ringlock scaffolding system?
Check the OSHA web site and search for scaffolding and then narrow the search. I bet you can find your answer there.
Q:I just got my ear pierced(scaffold) and I was wondering if anything would go wrong if I played sports... I play soccer Track and my coach said they would let me play soccer as long as I covered it up, but I was just wondering if I get hit or something if it would damage my ear really badly? :) Thanks lt;3
i probably will cause if u get him with a soccer ball it could rip the scaffold ring right out of ur ear. u should just take it out when u do sports and when ur not doing sports put it back it. i hope this helps u
Q:i have decided that i'll finish a tragic story that i have been writing with the public execution of the both lovers (protagonists). This story is in the monarchy age. Well but i want to ask you what method of execution is the more suitable for to lovers which love is forbiden and tragic. i've two options one is that they should be burned in the stake so their love and passion will burn them, other option is that they should be beheaded (guillotine ore axe what do you think?) so they'll lost their heads for love or the last option is that they die for hanging so they will have a last dance together in the rope. So what do you thing that is more suitable for end my tragic story? and which analogy is better for a forbbiden love and his punishment?
Yeah I am big into tragic romances especially during that era. I also vote for burning at the stake. I mean just the concept of fire consuming them as passion did invokes such empathy and sadness. Also since it is not a quick execution think of what you can do to prolong the execution. They will be able to hear each others agony and they can say their i love yous as their dying words. Romantic, tragic, it would rock!
Q:It's not fixed to the building and it looks as though a heavy gust of wind would send it crashing down. How exactly does scaffolding stay up and not topple over?
If you take a look at Chinese scaffolding, the principles are how it works are rather naked.
Q:Bowl buckle scaffold steps can only be used in the number of meters 3
6 vertical protective scaffolding = natural floor to the top of the cross bar between the tower set up the actual length of the towerThe total amount of construction work of the comprehensive scaffold is calculated according to the total floor area of the building
Q:I heard that because of the bicentennial in 2012, a lot of buildings are under renovation. I am worried that when we get there, all the buildings will be under scaffolding and we won't see anything or be able to appreciate the true ambiance of the city. Does anyone know what the city looks like right now?
Hello. You can see most of everything. Not too many buildings in Restoration. The City looks well now . But Buenos Aires and generally Argentina are a mix of things. You visit Argentina and Buenos Aires for Monuments, Food, Culture, Dance and People. So....Enjoy Argentina and have fun

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords