• Steel Frame Formwork GK120 with High-effective Performance for Large Projects System 1
  • Steel Frame Formwork GK120 with High-effective Performance for Large Projects System 2
  • Steel Frame Formwork GK120 with High-effective Performance for Large Projects System 3
Steel Frame Formwork GK120 with High-effective Performance for Large Projects

Steel Frame Formwork GK120 with High-effective Performance for Large Projects

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Structure of Steel Frame Formwork GK120

 

There is a prizing part designed in the corner, which can help to position and remove formwork easily.

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

2. Main Features of Steel Frame Formwork GK120

 

  • High standardized system

  • Easy connection with adjustable steel clamp

  • Convenient and fast corner formwork

  • Flexible to assemble and application

  • The adjustable steel clamp is convenient to use, and can hold tightly.

  • -There is a prizing part designed in the corner, which can help to position and remove formwork easily.

 

 3. Steel Frame Formwork GK120 Images

 

 

Steel Frame Formwork GK120 with High-effective Performance for Large Projects

 

Steel Frame Formwork GK120 with High-effective Performance for Large Projects

 

Steel Frame Formwork GK120 with High-effective Performance for Large Projects

 

 

4. Steel Frame Formwork GK120 Specification

 

-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

5. FAQ of  Steel Frame Formwork GK120

   

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

 3) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, 

     etc.by air/ sea, and we are VIP of these express.  

   .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7

    days.   

Q:THE SCARLET LETTER
Because of the guilt he was suffering from, he decided to hold a vigil (a long period of staying awake) at the scaffold where Hester was chastised from their sin. He does this hopeful for a remedy of the pain he has endured.
Q:Bowl buckle scaffold from the machine to pull out the upper and lower bowl
Do not know if there is no other norms on the bowl, it is this.The values of the carrying capacity are like those provided by the manufacturer.
Q:Standard Specification for bowl type scaffold steel pipe diameter
Span and step distance is in accordance with the relevant regulations; the top of the free end is more than the specifications is not greater than 50cm, and free from backwater not greater than 30cm
Q:What are the requirements for the broken seam connection of bowl buckle scaffold. For example, broken seam on both sides of the vertical pole is very neat, with a steel pipe fastener connection side to connect a number of vertical pole, both sides of the rod is not on a line, but also how to connect?
According to your description, I guess you use a different length of the vertical pole, or the use of ordinary steel pipe mixing bowl buckle scaffold. If the use of uniform specifications of the bowl buckle steel pipe should not be your problem.
Q:Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
The welding rod is welded on the transverse rod and the diagonal rod, and the transverse rod and the inclined rod are inserted into the lower bowl buckle when the assembly is assembledA bowl type steel tube scaffold column horizontal distance is 1.2 m, the vertical distance according to the load of scaffold is 1.2 m; 1.5 m; 1.8 m; 2.4 m, step away from 1.8 m and 2.4 M. when erecting pole connecting joints should be staggered, staggered first layer vertical rod 1.8 m long and 3 m the vertical bar,
Q:From the book quot; The Scarlet Letterquot;
He says not at thois time but that one day he will.
Q:Bowl buckle scaffold steps can only be used in the number of meters 3
Outer wall scaffold = outside line * masonry height (not to be deducted from the door and window area)2 li scaffolding = net length of the wall * wall high (not to be deducted from the door and window area of the empty ring)
Q:I would like to ask those who know the specification scaffolding? Can you teach me?
4, left foot hand eye regulation: a single exclusive console scaffold should be set foot on the wall as a small bar in the eye, the fulcrum, pay attention to not allow foot hand eye parts: adobe walls, soil nailing wall, hollow brick, brick cavity wall, independent column, half brick wall and 180 thick brick the wall brick lintel and a beam into a 60 degree angle of the triangle, windows and doors on both sides of brick and 1 3/4
Q:So I'm going to get a scaffold/industrial piercing, and I had a few questions:-does your ear have to be a special quot;shapequot;? Like I mean does you outer ear cartilage rim have to stick more so it can be pierced?My outer cartilage rim is a little flat but it still sticks up -Would this make my piercing reject?Thanks! :)))
Ummm I think it does have to be a certain shape because when I got mine my piercer said she had to check if I had the right kind of ear.
Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
0.7 - the basic wind pressure reduction coefficient determined by the return period of 5 years. In some special cases, a value above 0.7 may be used, but not less than this value.More than W0, Z, beta Z, STW are in accordance with the "building structure load code" (GBJ9-87) of the corresponding provisions of the selection or calculation to determine, which STW 6.3.1 in accordance with its table thirty-second and thirty-sixth.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products