SCHONER BRAND TOPLESS TOWER CRANE SLP6518

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

KIND REMINDER:
WE ALSO MANUFACTURE OTHER TYPES OF MASTSECTION AND OTHER TOWER CRANE
SPARE PARTS, SUCH AS LIFTING JIB, TIE-IN
COLLAR, CLIMBING CAGE AND HOOK.  
WE WISH TO PRODUCE MOST-SATISFIED PRODUCTS FOR YOU!
PLEASE FREELY CONTACT US FOR INQUIRY!



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:how to say no to my child who wants to keep a pet? crane fly.?
Hi!! wong-say Why say no? Just put on in a jar and tell the little chap that they have to stay out side in the fresh air. then it will fly away and the matter is over plus the lad has learned that it is impossible. everyone is happy then.
Q:why the new york cranes collapsed?
Update, Tuesday, 1:17 pm: Investigators have narrowed down the cause of the NYC crane collapse to a $50 strap of nylon fabric that snapped under the weight of a six-ton piece of steel. More details here.
Q:Why didn't Machida use the crane kick on Jones?
He did. Didn't you watch the fight? Here: youtu.be/3awhIoL54fY
Q:how do they get counter-weights onto high cranes?
The crane itself hoists them. Suppose a crane is rated to support X tons, then the optimal counter weight would be X/2 tons, an the crane has to be designed to support an imbalance of X/2 tons. If the operational crane is not lifting anything, then it has to support its unbalanced counter weight, and if it lifts its maximum load, then it has to stand an unbalanced load of (again) X/2 -- the other half of the load is balanced by the counterweight. Therefore the crane is capable of hoisting its own counterweight as an unbalanced load. It is then secured in place and the crane can then start operating to its rated maximum lifting capability.
Q:If a friend folded a thousand paper cranes for you what would you think?
That they have too much time on their hands.
Q:what would you wish for if you had 1000 paper cranes?
1,000 paper cranes? like sadako? i love that story! 3 wish for anything you want, i've never heard of a limitation of what you could wish for :) i've also never heard of something else you had to do after you made the cranes to make your wish come true, so i'm pretty sure all you have to do is fold the cranes.
Q:Neck-craning & neck-straining?
it will can be let you feel well.
Q:How does a crane get on top of a building and how does it go back down?
Depends on the building of course. Either a taller crane is brought in to lift them, or they're lifted by helicopter. And sometimes a building effectively builds itself, and the crane moves up with the construction platform after being constructed at ground level. Will still need a helicopter to remove it of course.
Q:How does a climbing or tower crane work?
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:I'm looking for a quick-release crane hook. ?
We manufacture a QUICK RELEASE FOR CRANE look at www.craneequipment.ca

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range