• SCD160 TOWER CRANE With an internationally fashionable appearance System 1
  • SCD160 TOWER CRANE With an internationally fashionable appearance System 2
  • SCD160 TOWER CRANE With an internationally fashionable appearance System 3
SCD160 TOWER CRANE With an internationally fashionable appearance

SCD160 TOWER CRANE With an internationally fashionable appearance

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

This brand new tower crane with column style is dubbed and produced according to the newest standards—JG/T5037-93 ‘Categories of Tower Crane’.

With level beams, trolley radius changing, swing top and versatile crane including the following characteristics:

1.With domestically advanced technology and capacity indexes matching up with international level, the tower crane’s working radius can reach 43 meters.

2.With an internationally fashionable appearance, the crane enjoys popularity among both domestic and overseas users.

3.The working style of this tower crane can be divided into 2 ways: base fixation and wall-attached fixation with independent erecting height up to 25 meters. On the basis of independent erecting, the attached erection can be achieved by adding standard sections and additional devices and the height can be 100 meters.

SCD160 TOWER CRANE With an internationally fashionable appearance

 

KIND REMINDER:
WE ALSO MANUFACTURE OTHER TYPES OF MASTSECTION AND OTHER TOWER CRANE
SPARE PARTS, SUCH AS LIFTING JIB, TIE-IN
COLLAR, CLIMBING CAGE AND HOOK.  
WE WISH TO PRODUCE MOST-SATISFIED PRODUCTS FOR YOU!
PLEASE FREELY CONTACT US FOR INQUIRY!


 

 

 


Q:What does "automatic tower crane" mean less than 100 tons per metre?
When you are working on this crane, the weight between the weight and the weight to the horizontal distance of the crane Center shall not be greater than 100 tons.For example, if the weight and crane center level distance is 10 meters, the maximum weight is 10 tons; if it is 20 meters, the maximum lifting weight is 5 tons; if it is 40 meters, the maximum lifting weight is 2.5 tons.
Q:Write a fully developed paragraph that contrasts the effects of war in two of the following works: Cranes, Thoughts of Hanoi, and Tokyo.
Hanoi To Tokyo
Q:are they for camera support
Yes Best of luck with it
Q:When should a crane be load tested?
if crane using regularly more then 8 hrs test should be every 4 months 8 months and full sevice at 12 months............ Load Testing Services ACECO provides inhouse vertical load testing services for load bearing equipment. Examples of equipment that can be load tested: ? Below the hook lifting devices ? Hoists ? Hooks ? Testing can be performed to meet ASME B30.20, B30.10, and B30.16 as well as ANSI N14.6. ? Standard inhouse 50 ton load testing capacity. ? Ability to test higher load capacity devices (Up to 5,000,000 pounds). ? Have tested up to 640,000 pounds (320 tons). ? Engineering manufacturing available to provide lift fixtures for test purposes. ? Can provide nondestructive testing of critical welds and critical locations. ? Inhouse capability to make weld repairs using AWS D1.1 qualified procedures and welders. ? Calibrated test weights available. ? Testing can be performed in accordance with 10CFR50,Appendix B Quality Program. ? Certificates of Test and/or Test Reports can be provided. ? Can provide onsite load testing services, including supply of calibrated weights.
Q:What measures should be taken to make tower cranes stable?
Phosphating coating of steel wire rope, give priority to the use of manganese or zinc manganese phosphating, and smooth steel wire rope production process comparison, just add the last bonderizing process, steel wire, wear resistance and corrosion resistance is greatly improved, the use of the wire without direct phosphating cold twisted steel wire rope.
Q:I have preliminary data: up to 2 tons of weight; work range of 40 meters; lifting torque 800KNm; lifting height 45m.. I encountered problems in the design, and some of its specific reference, I would like to ask here, for example, how much is the weight of its whole machine, how much is the balance weight, the balance of the radius of gyration? Super boom weight? (it's better to have the approximate weight of each component). And when I design this tower crane, is it necessary to use planetary gear for the gear reducer?Thanks to your advice, Liu is here to thank you
You're welcomeDesign units are different.Our factory is Langfang Design Institute drawings. May refer to the following.Arms 55 meters long.
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
First of all, your engineering structure is reinforced concrete Or steel? What's the weight of the lift? The lifting capacity of tower cranes should meet the needs. Generally speaking, steel structure hoisting, tower crane of the largest lifting weight and gravity moment should be large; hanging steel reinforcement of a smaller can.Secondly, the boom length should be covering the scope of construction (can also be arranged to meet several sets of crane lifting coverage). But in the 360 level luffing jib range, can not have obstacles (other cranes and buildings), and the boom and the distance between them (below) should be not less than 2m.Third, in the construction project is relatively high, the site is relatively small, you can mount the internal climbing tower crane. Building covers a large area, sometimes one can solve the problem. Of course, it is more troublesome to disassemble and lift inside, but the standard section used is less and the cost can be lower.
Q:How does a crane get down from a skyscraper once they're done using it? Like the crane on top of the skyscraper, do they get take it apart?
realdolby is correct. Small crane from parts that can be transported in service elevator is brought up and assembled. It is used to swing out and lower larger crane's parts. Then the small crane is broken apart and taken down in elevator.
Q:i will like to crane operator?
You made a statement, you will like to crane (an) operator. Which operator is it you are going to like to crane? If you mean would you like to operate a crane, that is up to you. If you mean can you be a crane operator, that is up to an employer. You need to be employed as one, and that probably means training and experience before being allowed to operate cranes for him/ her.
Q:What should the sub contractor do before the installation of the bridge crane in the workshop?
Baidu search [tower crane tower demolition, lowering section safety technical disclosure]. If it is installed, remove the "two words" to "installation", and other contents are adjusted slightly.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords