JL6016-8ton Topkit Tower crane for construction site

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

 

Description of  TOWER CRANE JL6016-8t

1) JL6013 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

SPECIFICATION of  TOWER CRANE JL6016-8

  • Max. working range 60m, tip lifting weight 1.3T and Max. lifting weight 8T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 56

  • Max height with attachment (m) 200

  • Working range can be adjusted(m)60/56/50/44/38

  • Min working range(m)2.5

  • Max lifting capacity(t) 8

  • Tip load @ 60m(t)1.6


Packaging & Delivery of TC6016-8

40HQ container

25~30days after deposit








Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:do you believe folding 1000 cranes?
No, that's some made up Shinto belief. People want to believe that because if they spent all their time making 1000 paper cranes and it turned out they don't get a wish, they would be really pi$$ed off.
Q:Help with crane fly larvae in my kitchen?
probably not larva of crane fly...they live in the soil outside. Describe or post a pic what you have
Q:Demoiselle Crane chick not walking or standing on its legs?
Your baby crane might have stepped on something, But this is nothing like malnutrition, From what ive learned the crane may have a joint dysfunction in the knee but this very common in cranes, I really think you should take an X-ray of the cranes legs because,(and the baby cranes feet will expand over time) This could get worse. This is more than likely a leg dysfunction. Hope this helps.
Q:what are the application of crane?
To lift and handle heavy objects. Haven't you seen giant cranes lifting big containers ( having automobiles) from docks and placing them on ships?
Q:The Red Badge Courage by Stephen Crane?
Stephen Crane is an excellent author. The point of YOU reading it is to get your take on it. Not someone else's. Just read the book!
Q:how did charles darwin influence stephen cranes writing?
Influenced by Darwin’s Theory of Evolution, Crane believed that people’s actions were determined by environmental factors rather than by conscious choices on their part. He believed also that conflict was the crucible in which human development occurred, and thus was attracted to the violent and seamy aspects of human experience.
Q:how do i fix faulty limim switch in overhead crane?
Limit switch replacement requires adjustment of the cranes travel limits. The limits are imposed by the manufacturer for the application. This service is normally factory authorized only.
Q:How and where do they add parts to the crane to get it higher in order to make taller buildings?
search for others, animation and video of process more edit Some cranes actually climb the structure of the building and are taken apart when the building reaches its full height.
Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
First of all, what you say should be a derrick or a Longmen frame. In any case, the derrick or tower crane should first meet the construction requirements, then the economy and safety requirements. To meet the construction requirements, it is much better to choose the derrick, of course, economically and safely. Derrick is a simple nonstandard equipment. It is easy to install, use and disassemble. It has low running cost and less safety risk than tower crane. The derrick is suitable for construction under 30 meters or less, especially for multi storied buildings and single pieces. The volume and quality are not more than 2 tons.
Q:How do you erect a crane. surely you would need a crane to make a crane.?
Yes you need a crane to erect a crane. A large mobile crane is required to erect a tower crane but the mobile crane is much more expensive so it saves money by only being on site for a few days to erect/dismantle the tower crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range