• JL6010 Topkit Tower crane for construction site System 1
  • JL6010 Topkit Tower crane for construction site System 2
  • JL6010 Topkit Tower crane for construction site System 3
JL6010 Topkit Tower crane for construction site

JL6010 Topkit Tower crane for construction site

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

 

Description of  TOWER CRANE JL6010

1) JL6010 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

 

SPECIFICATION of  TOWER CRANE JL6010

  • Max. working range 60m, tip lifting weight 1.0T and Max. lifting weight 6T.

  • Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

  • Trolleying mechanism can provide two operation speeds.

  • Free standing height (m) 42

  • Max height with attachment (m) 200

  • Working range can be adjusted(m)60/56/50/44/38

  • Min working range(m)2.5

  • Max lifting capacity(t) 6

  • Tip load @ 60m(t)1.0


Packaging & Delivery of TC6010

40HQ container

25~30days after deposit





Q:The really really tall ones you see next to skyscrapers. How do they assemble them? I thought that maybe they use another crane, but then how did they assemble that crane? Some of them are really, really tall. Try to remember what one looks like. They have long hollow necks with a top section where the driver sits that stretches long horizontally.
You okorder /
Q:What does "slewing up" and "under rotating" in the slewing form of a tower crane mean?
In short, when the tower rotates in the form of a tower, the tower is stationary (ie does not follow the rotation), and the form of the lower turn is the tower will rotate.
Q:Please write in days, hours, weeks, etc.I need math help!!!!
13 years 8 months 2 hours 13 minutes 20 seconds
Q:this is a little of a random question but why do you think that we should save the crested cranes of uganda? and what do you know about the crested cranes???
Why shouldn't we? Where do we draw the line when we're responsible for species after species going extinct. Granted, you shouldn't be expected to physically rebuild their habitat yourself if your not up to it; but a small change here or there isn't to much to ask to help save the world, is it?
Q:Two cranes are lifting identical steel beams at the time.One crane is putting out twice as much power as the other assuming friction is neglible, what can you conclude is happening to explain this difference?
You suggested they are lifting comparable metallic beams. we do no longer be responsive to if the cranes are comparable of their overall performance. Are they the two lifting the load in an analogous way? would be one is shifting it vertically against gravity and yet another one is shifting it horizontally. The motor performance and the operator studies would be diverse. using and coasting would reason substantial adjustments.
Q:What company makes a good engine crane I can order online?
Dont know if you have a Harbor Freight store near you, but i bought an engine crane from them this past spring , 2 ton for $100. Go to the website and find a store by you, or maybe order one on line. good luck..........
Q:Or would it be better to custom order for my applications?
1. Crane did not go out of business although they were on shaky ground a year and a half ago. A group of private investors and corporations baled them out. Howard's, Crower Comp are all pretty equal. Your car has roller hydraulic lifters so you'd better know what you're buying. Your missing some Chevrolet factory roller lifters and roller cam grinds. I see you haven't purchased the 2010 GM Performance Parts Catalog from your Chevrolet dealer parts counter yet. It's loaded with mild to wild hydraulic roller small block cams. You haven't figured it out yeat have you? A cam switch isn't going to make that 305 run worth a hill of beans. You need a set of cylinder heads to alow it to breathe first. Remember the EQ 3045A vortec performance heads for your 305? The valves ports are bigger and shaped for higher velosity. You're so stubborn I know you'll buy a cam first and whine like hell cause the car won't run any better. You'd better give this project a lot of thought because you're stuck with the stock intake and fuel/air mixer. Lower rear end gears such as 3.42's or 3.73's will wake the car up. Do that first and see if you want to spend any more money on it.
Q:Hi, I just bought a 12 foot tommy jib crane, for my cannon x1-h1, I also bought a pan and tilt motor that you put on top of the camera mount at the end of the jib and then add your camera on top of your motor mount. This thing is really heavy now, I have to use 40 lbs for a counter weight. On top of that all the weight is making the jib slanted and shooting crooked. So I took off the motor head and just left the camera on there, and it help a bit, but its still crooked. Is there any fix for this other than buying a more expensive stronger jib crane? It shoots great and I know I can fix the video in post, but it just bothers me. Any help?
i don't know what went wrong, but the manufactures recommends using only 15 pounds to counterweight the 12 foot tommy jib. you may have assembled the works improperly. i don't understand why you would be using a motor head, you should set up your shots head-on and use the supplied arm to keep the camera level or on shot. put marks on the floor for the talent if you have too so they can stay in the shot. i have used 10 foot jibs with the Panasonic WV-D5000 which would be at least as heavy as the XL H1 and not used any counterweights, just lockdown the tripod.
Q:What makes a crane so strong?
Cranes are built using a structural technique called a truss which is characterized by looking like a series of triangles connected together. That structure prevents the members from having to resist any bending loads. All of the truss members experience only tension and compression, no bending. That is an extremely efficient structure which is why they can be so strong without being monstrously heavy. Or if you prefer the short answer, engineers make the crane so strong.
Q:Has anyone actually folded 1000 paper cranes? i want some proof
no and no proof

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords