JL6010 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
Description of TOWER CRANE JL6010
1) JL6010 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
SPECIFICATION of TOWER CRANE JL6010
Max. working range 60m, tip lifting weight 1.0T and Max. lifting weight 6T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 42
Max height with attachment (m) 200
Working range can be adjusted(m)60/56/50/44/38
Min working range(m)2.5
Max lifting capacity(t) 6
Tip load @ 60m(t)1.0
Packaging & Delivery of TC6010
40HQ container
25~30days after deposit
- Q: Method for operating tower crane
- 2.21, drivers must pass the escalator up and down, up and down the escalator, hand tools are prohibited items.2.22 do not drop any objects from tower cranes or defecate.2.23 winter in tower crane operating room heating, should be taken to prevent electric shock and fire measures.2.24 any tower crane with an elevator must comply with the instructions in the elevator manual. No overloading or violation of the operating procedures.2.25 multi machine operation, should avoid two or more than two tower cranes overlap in the radius of rotation. Special circumstances, need to overlap operations, must be safe distance between the vertical arm to ensure the safe distance and the lifting of materials, and have reliable safety measures approved by the competent technical leadership before construction.2.26 jib cranes in heavy lifting off the ground after lifting, rotating and walking three actions can be done at the same time, but the amplitude only alone, strictly with variable load. A crane that allows variable amplitude loading shall not vary at full load or near full load.2.27 lifting hoist is not installed in the rotating part of the crane, lifting operations may not continue in one direction continuous rotation.2.28 a crane with a mechanical torque limiter must adjust the tonnage indicator of the overload limit device according to the radius of gyration and the rated load at that radius.2.29 bend rail subgrade must comply with the provisions of the crane should turn on the outer rail surface of the sand, rail, rail and wings painted with grease. The counterweight box shall be turned to the direction of the outward turn. It is strictly prohibited to do lifting or turning on heavy roads.
- Q: Did not city officials think of the danger if they toppled.
- My friend, that is a good question that only the developer will have to answer to. To the City that is. The crane operator and all other parties in charge of the project will get fined by the City. In addition, they may be lawsuits. Good luck
- Q: how many different types of cranes and winches are there?
- A bit more information might help. In England there are Winches and then there are winches. As for Cranes are we talking about birds.........actually there are only a few type of each.......but there can be quite a few variations of the basic types. let's say 6 types of cranes and 4 or 5 winches.
- Q: feminists always point to sexism. but Ive found 3 women here - who say they have experienced no sexism, and were pleasantly surprised by how excepting their largely male co-workers have been -
- Because it's not interesting to females, they mostly like retail, daycare, hairdressing ect but with high brow jobs they do well in numbers in law and medicine. I hate hearing feminist claim sexism in work like science. I'm in science and yes it is incredibly male dominated to point that sometimes I have been the only female but there was never any sexism at all and the times I was the only female I was treated way better then everyone else. If we look at little further at sex related interests who plays with toy cranes, trucks and lab sets and who plays with barbie and baby dolls? is it really just coincidental? I see females buying the latest fashion or celebrity mag and well guys science, sports and cars. It's obviously not sexism feminists well feminists are just feminists what else would you expect from them.
- Q: How do they erect HUGE cranes without a crane?
- The really huge cranes with the boom that goes straight out at a right angle to the upright section (which goes straight up) is called a tower crane. They're assembled by using a jack assembly at the bottom, so that more sections are stuck in at the ground level.
- Q: Ty Crane is the star basketball player for st.francis, what is he doing now? Where is he? Why is he not in the NBA?
- Ty Crane
- Q: The question is: A crane has a power of 500watts, and is pulling a 142kg. What is the velocity of the pulling of the crane?Please help and thanks!
- I don't remember ever doing a problem like this, but I will try to solve it. P = W/Δt, P = Fd/Δt P = Fv Force required to lift the 142 kg object; F = 142 * 9.8 F = 1391.6 N Therefore; P = Fv 500 = 1391.6*v v = 0.359 m/s So velocity of the crane is 0.359 m/s. Is that right?
- Q: I saw da construction of the upcoming tallest building in da world in Dubai,how did da crane get on top of it?
- Why do you write da instead of the? It's irritating. I apologize to you. That was rude and unkind of me.
- Q: I'm researching Stephen Crane for an English project and I need to how Stephen Crane's works effected others. Thanks for the help! xP
- I'd mention his book Red Badge of Courage and how it changed the war novel for American and English writers. You can look at books like Catch-22 , MASH, or Hemingway's war novels and find that personal voice that Crane used.
- Q: Which one is a better investment? I can get both for 200dollars
- Probably an engine crane (engine hoist). Engine support you still need to lift the engine for the engine support. You hardly ever need to maneuver the engine to do a timing belt. Edit: I have one of the portable lifts what some refer to as a cherry picker. I've never had the need for an engine support.
Send your message to us
JL6010 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords