• Guohong Tower Crane CHP5103-8 System 1
  • Guohong Tower Crane CHP5103-8 System 2
  • Guohong Tower Crane CHP5103-8 System 3
Guohong Tower Crane CHP5103-8

Guohong Tower Crane CHP5103-8

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
34 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Shandong Guohong is a professional tower crane manufacturer.

Shandong Guohong can manufacture topless crane & luffing crane & topkit crane , the capacity from 40mt to 1000mt tower cranes . we have manufactured these cranes for various client in Korea, Middle east, Malaysia, Pakistan, Australia, Germany(OEM), South Africa and China.

Shandong Guohong prides itself on offering the most products and services around the world.

The leading products are mechanical devices such as various type of tower cranes and construction lifts; as well as road construction like asphalt mixing equipments together with steel building structure installation, etc. With the right to engage in foreign tradewe have passed ISO-9001 Quality Management System Certification,CE Certificate and got National Special Permission Authentication Grade A and Russia EAC certificate of tower crane.

Shandong Guohong Group, originally founded in 1999, is one of the first enterprises that restructured in Weifang City in 1997. The present group company was founded in 2003 and composed of four companies- Guohong Steel Structure, Guohong Door & Window, Guohong Leasing and Guohong Properties. It has 400 staff, fixed assets of about RMB70 million and land area of 90,000m2. Main products include FO/23B, 7030, QTZ125, QTZ80, QTZ63, QTZ40 and QTZ315 series tower crane, construction lifts and material elevator, as well as construction steel structure and high-grade aluminum-plastic doors and windows. Its products are sold in more than 10 provinces and cities in China and over 20 foreign countries.
  Shandong Guohong Group is Top 10 Tower Crane Enterprises of Shandong Province, Top 100 Private Enterprises of Weifang City, Top 20 Enterprises of Guohong City, "AAA" Level Banking Credit Enterprise, Provincial-level Advanced Equipment Management Unit, Provincial-level "Contract Honored and Promise Kept" Unit and Top 100 Provincial-level Honest Enterprises. " Guohong " trademark was rated as Shandong Famous Brand, and Guohong tower crane is honored Shandong Brand-name Product

Q:This poor little guy has been out on my balcony where I smoke my cigarettes for two days now. One wing is badly mangled and he can't fly away, I thought to just let him work it out yesterday in hopes of him healing on his own somewhere, but today he was climbing on my leg as if asking for help and I feel horrible for him now...he's suffering, he hasn't gone far in at least 24 hours I feel I should feed him and give him water until he heals...what do crane flies even eat?? Any advise aside of killing him and putting him out of his misery would be great!!
He'll probably die anyway. It's the way nature works.
Q:Equipment safety of tower crane
The boom of a tower crane is divided into two types: horizontal and compressed arms. When the movable arm is horizontal, the carrier car runs along the horizontal arm with variable amplitude and amplitude, and the movable arm is longer, but the boom has a larger deadweight. The arm for the strut type when the tractor boom luffing mechanism pitch amplitude, amplitude motion than horizontal smooth, but its relatively small weight.The weight of a tower crane varies with its amplitude. The product of the weight and the amplitude is called the load torque, which is the main technical parameter of the crane. Through the rotary mechanism and slewing tower crane, lifting height, rotation and walking the inertial mass, so it needs to have good control performance, especially the lifting mechanism can fast, slow, heavy and light load installation fretting. In addition to the general use of resistance speed regulation, but also often use eddy current brake, FM, pole change, SCR and mechanical and electrical joint speed regulation. When the crane in the layout to drawing, especially in real estate development area, residential buildings, such as tower crane, but also to consider the safety distance of adjacent tower crane, two in horizontal and vertical direction to ensure the safe distance of not less than 2m, the adjacent tower crane tower crane and interference can not occur. Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
Q:The really really tall ones you see next to skyscrapers. How do they assemble them? I thought that maybe they use another crane, but then how did they assemble that crane? Some of them are really, really tall. Try to remember what one looks like. They have long hollow necks with a top section where the driver sits that stretches long horizontally.
You okorder /
Q:a 10 crane is moving across a frictionless surface at 4 m/s. if you wish to bring the crate to a stop, how much work would it need to do to dissipate all the kinetic energy?Physic
If an object with mass 10kg is moving at x m/s it's Kinetic energy is ?mv? =?×10 kgm?/s? = 5x? Joules Example: 10kg @ 4m/s Ke = ? (10kg)× (4m/s)? = 80 Joules
Q:I've come up with a few reasons, if someone could add on to it then that would be wonderful!Thank you for answering my question :D
A crane allows us to place light or heavy loads with precession and safety; on top of buildings, across water ways, down mine shafts and over obstacles. Building a pyramid today would be done with cranes, instead of building ramps to slide the massive stone blocks up. Cranes speed up any construction project. Cranes eliminate a lot of manual labor. Cranes prevent injuries by doing the hard work. One example, we used a crane to lift off an entire house roof, in one piece. We then built a second story and then used the crane again to put the roof back on. Without a crane, it would have taken several days to tear off the shingles, remove the roof sheeting and the trusses, not to mention the money saved. The building codes do not allow the reuse of wood trusses, yet not taking the roof apart, allowed use to reuse the trusses, a savings of hundreds of dollars. Wingman
Q:does anyone have a good slogan for the whooping crane?
**** the whooping crane
Q:A man said to the universe:“Sir, I exist!“However,” replied the universe,“The fact has not created in meA sense of obligation.”
If Jesus did not say it it is irrelevant!
Q:It affects my day to day life, especially in the summer, having to cope with crane flies, wasps and moths getting into my house, so I usually just pretty much keep myself in my room, door closed, windows closed to prevent any from getting into my room. If I happen to be near any of these insects I tend to have a panic attack and can't handle it. I have no reason for my fear, I am just afraid of them for no reason. If my room is too hot, I'll just sit in the dark with the window slightly open, in fear of them coming into my room. It's getting silly now and a lot of my friends will tease me about it. Really it's weird, I'm afraid of these insects, however I don't mind spiders (though I will not touch them), or any other insects for that matter. Can anyone help me to overcome my fears?
Think butterflies and hang a bag of water over your door also keep a bottle of bug spray handy
Q:Captain Kirk, TJ Hooker or Denny Crane?
Danny Crane.. his style and acting really fits that charactor..
Q:Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
According to the present list of quotations, the winning project, the tower crane cost has been included in the total price, and has nothing to do with the construction side, that is, the cost of tower crane foundation should be borne by the construction side.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords