Guohong Tower Crane CHP5103-8

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
Supply Capability:
34 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Shandong Guohong is a professional tower crane manufacturer.

Shandong Guohong can manufacture topless crane & luffing crane & topkit crane , the capacity from 40mt to 1000mt tower cranes . we have manufactured these cranes for various client in Korea, Middle east, Malaysia, Pakistan, Australia, Germany(OEM), South Africa and China.

Shandong Guohong prides itself on offering the most products and services around the world.

The leading products are mechanical devices such as various type of tower cranes and construction lifts; as well as road construction like asphalt mixing equipments together with steel building structure installation, etc. With the right to engage in foreign tradewe have passed ISO-9001 Quality Management System Certification,CE Certificate and got National Special Permission Authentication Grade A and Russia EAC certificate of tower crane.

Shandong Guohong Group, originally founded in 1999, is one of the first enterprises that restructured in Weifang City in 1997. The present group company was founded in 2003 and composed of four companies- Guohong Steel Structure, Guohong Door & Window, Guohong Leasing and Guohong Properties. It has 400 staff, fixed assets of about RMB70 million and land area of 90,000m2. Main products include FO/23B, 7030, QTZ125, QTZ80, QTZ63, QTZ40 and QTZ315 series tower crane, construction lifts and material elevator, as well as construction steel structure and high-grade aluminum-plastic doors and windows. Its products are sold in more than 10 provinces and cities in China and over 20 foreign countries.
  Shandong Guohong Group is Top 10 Tower Crane Enterprises of Shandong Province, Top 100 Private Enterprises of Weifang City, Top 20 Enterprises of Guohong City, "AAA" Level Banking Credit Enterprise, Provincial-level Advanced Equipment Management Unit, Provincial-level "Contract Honored and Promise Kept" Unit and Top 100 Provincial-level Honest Enterprises. " Guohong " trademark was rated as Shandong Famous Brand, and Guohong tower crane is honored Shandong Brand-name Product

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:are crane fly poisonous?
No daddy long legs are real because when I got home from last night and I also saw 5 crane flies on my door so daddy long are at are real after all and also crane flies aren't poisonous.
Q:What should be included in the disassembly plan of the tower crane?
- 1 -Contents and requirements of special construction plan for tower crane installation1. General situation of Engineering; 2, installation location and elevation plane3. The type, performance and technical parameters of the tower crane selected4,; foundation and attachment device set(1)The foundation of tower crane and the bearing capacity of its foundation shall comply with the product specificationRequirements for books and design drawings. Before installation, the foundation shall be checked and accepted before installation. There should be drainage facilities around the foundation.(2)Attached tower crane is used, the attachment device and set freeThe end height shall comply with the requirements of the product manual. When adhering to a horizontal distance or attachmentThe design calculation and drawing system should be carried out when the spacing is not satisfied with the requirements of the product specificationDrawing and writing relevant instructions shall be examined and approved by the technical leaders of the enterprise or through the originalManufacturer confirmation. Attachment device and component shall be the original manufacturer or by embedded partsEnterprise with corresponding ability to make. Attachment device design, the main structure of the building to support the checking.5, climbing conditions and adhesion node detail;The foundation, anchor and climbing support structure of an internal climbing tower crane shall be used as the foundationAccording to the product manual to provide the design calculation, and the internal climbing tower crane bearing structure checking.6, the main components of the weight lifting and installation position.7, the installation of auxiliary equipment; the type, performance and arrangement position.8. Rigging and special tools9, set the power supply;10, the construction personnel configuration;
Q:do you know where Ty Crane is now? The one in the film coach carter.?
Ty Crane is actually at Venice Beach in Los Angeles I just saw him, he was selling his mix tapes, we talked then he said he was Ty Crane the actor from Coach Carter. He smiled eveytime he said he was a movie star. Go to Venice beach by the weights and courts and you will see him there!!
Q:Two cranes lifting at the same time .One has twice as much power explain this difference?
One is lifted 2 times faster P = F*v W = N * m/s
Q:What category is a Crane bird?
I KNOW I KNOW! -birds-
Q:What kind of equipment must be installed on luffing trolley of horizontal luffing tower crane?
The car must have a support wheel to prevent the trolley from hanging in the middle.
Q:In stephen Crane's The Open Boat does the correspondent change from the beginning of the story to the end?
Wow. I haven't read this in years but I loved this shortstory. Yes, the narrator (or corespondent) definitely changes and the nature of this change is made explicit in the closing passages of the story where, if I recall correctly, he says that he feels as if he has become an interpreter of nature.
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
Q:If garden gnomes and oragami cranes were to battle with one would win?
cranes. they have wings and beaks. duh.
Q:What should I do with my 1000 paper cranes?
Lol if you *really* want to be crafty... Get a spring (Or several) Glue it to the bottom of a box. Then glue a cardboard piece on top. Then put something heavy... (For example, a glass crane, shoudn't cost much) and put all the paper cranes under it. Then... when she opens the present and takes the glass one out the paper ones will fly everywehre :D

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range