FANGYUAN TOWER CRANE TC4708

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:



1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.  
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q:Whooping Crane or Whopping Crane?
Whooping Crane is the name for the tallest bird in north america. A whopping crane is just a big-*** crane.
Q:Chinese poems about Mandarin ducks or cranes?
this one is about cranes We thought they were gulls at first, while they were distant- The two cranes flying out of a natural morning, They circled twice about our house and sank, Their long legs drooping, down over the wood. We saw their wings flash white, Frayed at the black tip, And heard their harsh cry, like a rusty screw.
Q:Where are gears used on a crane?
Don't okorder.com
Q:How are those really tall construction cranes assembled ???
I assume you are talking about a tower crane. From a distance, it looks like a T with one side shorter than the other. First, you need a good foundation for the crane to sit on. Next, you have a large mobile crane. With the mobile crane, you construct the tower (metal framing going up), the cab (where the operator sits and the motors), the boom (the mast out front) and the counter-weights (on the side opposite the boom). For the most part, this will get you a tower crane that will be about 200 feet above the ground. Most tower cranes today are self-jumping. Once you are ready to jump the tower crame (i.e. insert another section of the metal frame) there are hyraulics that lift the boom, cap and counterwieghts. This will create a gap in the metal frame. The tower crane will then pick up a section of frame and hoist it up and the ironworkers will slide it into place. The top section will be lowered down onto the new frame piece. The hydraulic jacks then get re-attached higher up to continue the jumping process. That is how you get a crane to build a 50+ soty building. By the way, once the crane is about 700 feet in the air, (if you have the stomach for it), it is a blast to ride out to the end of the boom.
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:Follow up question about Sand Hill Cranes?
i though you thoroughly researched about hunting them before asking the question, I figured it was illegal to kill but since you put it in there with other legit game animals I figured it was legal in your area. um, almost all animals can be eaten. except some snakes and other animals with toxins as a defense mechanism, it's unwise to eat those unless you know it very well (such as the blow fish)
Q:Question about Cranes. The large machines next to skyscrapers, not the birds.?
Sorry the only information on Cranes here is of the Feathered variety, you have entered the wrong section sorry.
Q:Why does Crane deliberately place the dinghy's crew in sight of land in the story?
The Open Boat is a true story - Crane was sent to Cuba as a war correspondent in 1897, and he boarded a vessel named the Commodore. The vessel sank off New Smyrna Beach, Florida in heavy weather, and the survivors made their way to shore in the open boat described. The wreck of the Commodore is in 90 feet of water, fourteen miles out and is currently under an Admiralty salvage claim.
Q:stories about paper cranes?
Sadako and the Thousand Paper Cranes by Eleanor Coerr - about a girl who gets luekemia from the Atom bomb dropped on Hiroshima and her making paper cranes to pass the time in the hospital.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range