ZYC600 Hydraulic Static Pile Driver Used Pile Driver Machine for Sale

Ref Price:
$200,000.00 - 500,000.00 / unit
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

ZYC600 Hydraulic Static Pile Driver Used Pile Driver Machine for Sale

 

Lower Energy Consumption:

>>We use variable hydraulic systems with low   loss and constant power in this series of products, so that energy   consumption decreases by 30% and working efficiency increase by 60%.

 


 

High Efficiency:

>>To ensure the high working efficiency of the   whole machine, we use hydraulic systems with big power and great flow, the   pile driving mechanism with multi-speed control and being quick in getting   ready for operation.

 


 

High Reliability:

>>To ensure the high reliability of our   products which engineering machines should possess, we improve the design and   use very reliable materials or components which we select carefully in the   process of purchasing.
  >>For example we use inverted cylinder as a supporting leg which has   become a patent in our country so as to avoid the easy breakage of cylinder   which was the case with traditional design.


 
 

 


 

Convenience in dismantling, transportation and   maintenance:

>>Since we have constantly improved our design   of pile drivers for more than 10 years, every part of the machine is easy to   be taken apart, which provides convenience in transportation and maintenance. 
  >>Compared with the pile drivers made by other companies, ours are more   convenient to be taken apart and shipped as the connection and lay out of the   long boat and the short boat are different.
  >>Take the driver's cab for example; it can be opened at the middle so   that the lifting arm of the crane can pass through it during transportation.   Besides, the side piling mechanism can be taken off so as to reduce the   length of machine to be shipped and greatly reduce the weight of separated   units in transportation.


 
 

 


 

Multi-function:

>>Our products are multi-function static   hydraulic pile drivers with embracing pile driving, top-pressing pile driving   or both at the same time because they are well combined with each other.
  >>Our products have bigger capacity of side piling and corner piling   than those of other companies, and the power of side or corner piling reaches   60% of the middle piling.
  >>Our pile drivers can work with a variety of piles, square piles or   round piles or other shape of steel piles, no matter thin-walled round   concrete piles or thick-walled ones.

 


 

Systemization and Maximization:

>>Our company has developed 14 models of pile   drivers with the capacity of 60 tons to 1200 tons and each model is   classified into 4 kinds according to its function with the maximum tonnage of   1200.


 
 

 


 

Flexibility in Designing:

>>To keep up with the development in the   engineering machinery of the world, we will integrate all useful high   technologies from machine-building, electricity, hydromechanics and   electronics into our products and meet different individual needs of our customers. 
  >>For example, we can, if any customer requires, install a   position-controller for the crane, and a digital screen showing the tonnage   of piling force, etc.


 
 

 


 


Two Patents:

>>The design of inverted cylinder as a   supporting leg which avoids the radial force on the piston extends the   life-time Of the cylinder. 
  The patent number is ZL01249443.7.
  >>Embracing pile driving or top-pressing pile driving or both are used   in operation with one machine. 
  The patent Number is ZL02139875.5.


Parameter/ModelZYC600
Rate piling pressure(KN)6000
Piling speed(m/min)Fast7.0
Low1.4
Piling stroke(m)1.9
Pace(m)Longitudinal3.6
Horizontal0.7
Angle range(°)11
Rise stroke(m)1.2
Square pile(mm)Max550
Circle pile(mm)Max600
Side piling(mm)1250
Corner piling space(mm)2500
Lifting weight(t)16
Pile hanging length(m)15
Power(KW)Piling111
Lifting30
Main dimension(m)Work length13.50
Work width8.08
Transpot height3.15
Total weight(t)600

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.


 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the general safety hazards of temporary power and piling machines in the construction site?
Piling machine electrical short circuit can not strike fire, need temporary power consumption precautions:The construction site of 1 piles and electricity should be used temporarily laying cable laying, temporary power lines should be in conformity with the special safety electricity demand, cable line of mobile often demand, should be laid by vehicle rolling, trampled and pipe, where the workpiece collision is not easy, and may not be placed in soil and water. The electrician needs at least one power outage every week to check the outer wear of the cable and find that the problems need to be dealt with in a timely manner. When the cable goes through a temporary route, it uses a steel pipe as a sheath, trenching, laying underground, and setting a firm and significant azimuth symbol.2, temporary power construction, it is necessary to set up special switch cabinet or switch box, cabinets (boxes) necessary equipment over-current, overload, short-circuit and leakage maintenance equipment. Mechanical equipment and maintenance of the switch cabinet is provided with neutral or ground, switch cabinet (box), anti rain (tide) and cabinet (box) within the switch electrical equipment, switch cabinet (box) with "electric temporary construction site safety technical specification shall be the equipment".
Q:Want to learn this kind of pile driver?.
This kind of machine has little, and is not very flexible, now popular is this kind of flexible operation, power enough, 360 degree rotation of small rotary drilling rig
Q:Requirements of waveform guardrail column piling skills training program and training program.
B, anti blocking blocks, wave beam, end installation(a) after installing the upright column, the bracket (block block) can be installed. The bracket (stop block) is fixed between the wave beam and the upright post through the connecting bolt. The bracket (block) shall be adjusted to make it in place before tightening the connecting bolts.(b) the wave beam is spliced with each other by a splicing bolt and is fixed by a connecting bolt bracket (an anti blocking block), and the direction of the overlap of the roadbed guardrail and the corrugated beam is the key of the installation, and the installation is carried out in strict accordance with the drawing. The direction of overlap shall be consistent with the driving direction. The wave beam should be adjusted continuously during the installation. Therefore, the connecting bolts and the splicing bolts should not be tightened too early so that the long holes in the corrugated beam can be adjusted in time during the installation process so as to form a smooth alignment and avoid local irregularities. When the alignment of the guardrail is considered satisfactory, the bolt can be screwed at last. The connecting bolt between the bracket (stop block) and the wave beam should not be screwed too tight, so that the temperature stress can be adjusted by using a long round hole.(c) the end beam is spliced with standard section guard bars through splicing bolts. The construction method of the end beam is basically the same as that of the wave beam.
Q:What about the engine power of a hydraulic pile driver?
The utility model has the advantages of stable performance and reliable use, and can be used for self loading, self unloading and moving transition. During transportation, the upper section of the main frame can be retracted and folded, thereby saving a great deal of expenses and troubles in lifting and dismounting. The pile machine is not only efficient, economical and practical, it is the best choice for customers, but also can adapt to various bad weather and working conditions of the operating environment.
Q:What is the difference between piling and piling?
The pile construction process should be chosen. If you can hear sounds in 2 kilometers away, to the scene to see the mechanical smoke ears were shock pain. It should be is piling up (diesel hammer). To the scene to see only the pile go down, and there is no sound, this should be the pile. Read this page also read: look back Masahiro long spiral drill development road 10 years
Q:Why levy piling
Like a chopstick, inserted into the soil is not directly on the ground than in a more stable, the pile is equivalent to the chopsticks into the earth part.
Q:How much is a steel sheet pile driver?
According to the machine model, 8-10 or so, no oil, with the driver and a worker.
Q:Is the loading type barrier pile driver practical?
Yes, I haven't bought it yet. But I've seen others use it. We used for engineering machinery factory is Sichuan Hongtu buy loading guardrail piling machines, but we are state-owned enterprises, state-owned enterprises as you know the loading driver caitaiqicu nearly 200 000 a buy is five.
Q:Construction Engineering piling machine how much money?
Need fifty or so, a twenty meters stake will not exceed one thousand dollars, the operation of pile machine need pile machine driver's license, also can hang some of the company's account.
Q:How about the hammer head of hydraulic pile driver is too big?
You can only use the nitrogen charging device to release the nitrogen from the hydraulic hammer, and remember that the value is better than the 1-1.2

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range