Hydraulic Truck Mounted Pile Driver
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 1 Sets per Week set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
truck mounted hydraulic pile-driver
high quality and famous brand
mounted on truck
competitive price
ISO certificated
truck mounted hydraulic pile-driver
1.Purpose
The truck mounted hydraulic pile-driver is a special equipment used for driving express highway protective grating.
2.Structural features
1)The truck mounted hydraulic pile-driver is of good dynamic behavior,low oil consumption,and reliable braking performance. There are 6 seats in driving cab.
2) Articles for fisrt aid repair,guard board,streel column and servicing materials may be carried with the machine together.
3)Its function of pile driving and pile extraction increase the efficiency of fisrt aid repair of guardrails, and it is an ideal device for first aid repair of highways.
3.Main technical parameters of truck mounted hydraulic pile-driver
Size |
6980×2256×2605mm |
Engine power |
90kw |
Weight of complete machine |
5480kg |
Hydraulic system pressure |
10Mpa |
Hydraulic system flow |
30-50L/min |
Time of impact |
350-780meeting/min |
- Q:How did the pile of clay work after the pile driver finished?
- Friction end bearing pile -- the pile whose load is mainly loaded by the end of pile.Method according to construction methodBored piles: bored piles, immersed tube cast-in-place piles, hand dug bored piles, and explosion enlarged cast-in-place piles.In addition, the hole forming methods are: manual digging, mechanical drilling (positive cycle rotary method, reverse cycle rotary method, auger drilling method, drilling rig drilling method, etc.).
- Q:How many types of piles are there in the site? What procedures are usually used for piling? Such as eyes open what kind of..
- Precast pile, artificial dig hole pile, sinking pipe filling pile, spiral drilling pouring pile and powder spraying pile.
- Q:Piling of percussive drilling
- 7, the drilling process control should be rigorous, but also do not have to worry about failure, a reasonable choice of treatment methods, generally can be solved, the common, foot blade perforation, hole collapse, partial hole, cross hole, drilling, drilling, drilling buried crane, well preventive measures are generally not in advance, very important duty responsibility. 8, the remaining holes, steel cage decentralization, concrete pouring, sealing and other are more conventional, do not write more. But the bottom of the hole, sediment, sediment, etc. must be recycled clean, otherwise it will be buried in the later works of greater risk. When the concrete is poured, the bottom concrete under the impact of residue inclusion in steel or bond caused by defects in the pile in concrete, on the upper structure of the load transfer to the bottom of the pile, the structure will definitely should produce uneven settlement for residue.
- Q:Pile up can not go down, how to deal with?
- 1. If the hammer is reached, the hammer is finished.2, according to the geological report should be able to play but did not move, can not continue to fight, otherwise the pile will crack or break, stop and find out the reason.
- Q:what kind of VLV cable is needed, how to determine, after the cable from the low-voltage distribution box out, 460m arrived distribution of electricity 100It's best to explain how to calculate, how to determine the current, and the specifications of the cable, thank you very much!630 of the box changed to the distribution box for the cable, 240 of the cable is single core, or 3*240 cable. What kind of cable can be specific about it? Underground directly buried, directly to a cable model, aluminum core cable
- Your problem, our engineers will give you the most professional recommendation models of wire diameter we all offer you out for you. People engaged in the sale of love making friends Chinese five hundred cable top ten brand-name products in Shanghai look forward to working with you to see the user contact information will be the price in contact time
- Q:How many small pile drivers are there in Hunan? It's best to have the exact location
- Hunan small piling machine manufacturers or a lot, like Hunan wylong machinery should be more excellent in mechanical industry.
- Q:Does the mud come up with the shovel? Can you tamper with a stone? 1.2 traction? How many meters per hour can the ramming mud fall? And the price of the equipment! It's better to have a talk with that big brother! Thank you on your knees
- this not move so we will look at the geological prospecting will not find a understand Someone helps you see if you're going to lose it.)
- Q:The pile driving team has many years of piling experience, to undertake the construction of large and small piles, includingKongguanzhu
- To consider how the site can take back the unearthed excavation method is ABC pile test done to dig a long tight schedule but also increase the test equipment such as AC two AC after completion of the test sequence can also do a ramp to the middle of the excavation
- Q:Which brand is good for a pile driver / pile driver?
- Pile driver has multiple types of wheeled and tracked, allowing users to have more choices, but in terms of pricing is reasonable, domestic brands in the relatively high cost of sales in the top brands, many brands.
- Q:How to use the pile driver?You're right. Contact 18961845125 before you know.
- 5, the pile driver in the work should be closely observed on the control panel current, voltage instructions. If abnormal sound or other abnormal conditions are found, stop inspection immediately.6, always check the temperature of the bearing and the bearing cover screws is loosening, should strictly examine the eccentric block coupling screw loosening, prevent the occurrence of accidents.7, sink, column (or pile) prohibited to stand around.8, piling machine with water, mud suction sink, should contact in advance with the relevant personnel, and take care of each other at work.9, long pipe column or pile and the installation of pile cap, the staff must wear safety belts.10 、 in the process of sinking, it is strictly prohibited to do mechanical maintenance work.Six after the stop of the piling machine, the power shall be cut off immediately, and the pile driver and motor shall be inspected and maintained.Seven, piling machine long-term disabled, should be kept in storage, the motor should be good moisture-proof protection, the control panel of the instrument, should be removed, storage, storage.
1. Manufacturer Overview |
|
---|---|
Location | Liaoning, China (Mainland) |
Year Established | 2000 |
Annual Output Value | |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Mid East Eastern Asia Western Europe |
Company Certifications | ISO:9001:2000 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | 31% - 40% |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | 5,000-10,000 square meters |
No. of Production Lines | 6 |
Contract Manufacturing | OEM Service Offered |
Product Price Range |
Send your message to us
Hydraulic Truck Mounted Pile Driver
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 1 Sets per Week set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords