• ZYC series ZYC1000B multi-functional Hydraulic Static Pile Driver System 1
  • ZYC series ZYC1000B multi-functional Hydraulic Static Pile Driver System 2
  • ZYC series ZYC1000B multi-functional Hydraulic Static Pile Driver System 3
  • ZYC series ZYC1000B multi-functional Hydraulic Static Pile Driver System 4
ZYC series ZYC1000B multi-functional Hydraulic Static Pile Driver

ZYC series ZYC1000B multi-functional Hydraulic Static Pile Driver

Ref Price:
$200,000.00 - 500,000.00 / unit get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
Q: How many meters can a small pile driver reach?
The maximum diameter of the pile driver is 1.2 meters
Q: What is an impact pile driver?
You mean the kind of pile driver that used to use high explosive diesel engines to produce impact?The principle is like using the percussion hammer nails, using a hammer impact in the nail head will generate the nail.It's very seldom used now.
Q: I've heard that the pile driver's pay is high. I want to study. Also please seniors pointing. Be deeply grateful!
There's one in the neighborhood. Can find other counterparts to learn, skilled in their own open. However, the piling machine is not stable, but also a team together. And we're going out of town, this month, ten days.
Q: How to safely operate a pile driver?
Code of practice for safety operation of pile drivers(1) all kinds of pile operators should be trained and tested, and obtain special operation personnel operation certificate, with operation permit operation.(2) the pile shall be vertical and the pile forward shall not exceed 5 degrees, and the back shall not exceed 18 degrees.(3) the angle between the steel wire rope and the guide rod shall not be greater than 30 degrees, and the lifting stake shall be operated according to the operation rules of the lifting operation. It is strictly prohibited to tilt or tilt when lifting precast piles.(4) the hammer of the wire rope should be slightly relaxed after instrumentation, to prevent the hammer lay wire rope, tug, hammer head hook should be locked.(5) diesel hammer pile machine, hoist hammer, hanging pile must use the winch ratchet insurance. Start piling hammer should be opened before the mechanical lock, the hammer claw retracts, starting out before starting the hook, prevent the hammer hanging from the pile top pile accident.
Q: I have two pile drivers, followed by engineering piling, what qualifications do you need?
Hang on it, for qualification trouble. You can contact me if you need to buy piling equipment.
Q: How to maintain the pile driver daily?
Daily maintenance of pile driver1 、 maintenance of each shift (after class, after class)(1) before the daily operation, the operator should clean the surface of the pile driver. Parts that need oiling must be lubricated 1-3 times a day to keep the lubricated parts lubricated. (2) remove dirt and dirt from the equipment. (3) check and fasten the connecting bolts of each department, check the lubrication and wear of main clutch, steering pump, fan bearing, high pressure oil pump, load wheel and idler pulley. If there are any problems, they should be dealt with in time.
Q: Bridge pile driver is a stone below, how to do?
What's your machine, please? If your machine is an impact drill, I suggest you use the hollow hammer. The ventilation is fast, the cross drill is easy to break, the side is slow, and several drilling rigs have their respective numbers. Next time they are talking to you
Q: What about a dry digger, a pile driver? How much money? What's the speed?
You can't spend much money on your own alterations
Q: HD50 cylinder type diesel hammer, HD62 hammer, HD80 hammer, walking pile driver, crawler type pile driver
Crawler type piling machine is a crawler pile frame supporting tube type diesel hammer general "crawler piling machine" or "Caterpillar diesel hammer" or "Caterpillar diesel hammer"; "HD" should be the product number Guangdong Liyuan cylinder diesel pile hammer
Q: What's the profit of a pile driver for a day at the site?
Because, after all, the pile driver is not only a few years, the choice of good quality in the early may not be cost-effective, but after taking into account, or suggest that you buy a little bit of the machine. After all, if the driver problem that you every two or three days, the work is not good for.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords