ZYC700 Used Pile Driver Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
ZYC700 Used Pile Driver Hydraulic Static Pile Driver for Sale
Lower Energy Consumption: | |
>>We use variable hydraulic systems with low loss and constant power in this series of products, so that energy consumption decreases by 30% and working efficiency increase by 60%. |
High Efficiency: | |
>>To ensure the high working efficiency of the whole machine, we use hydraulic systems with big power and great flow, the pile driving mechanism with multi-speed control and being quick in getting ready for operation. |
High Reliability: |
>>To ensure the high reliability of our products which engineering machines should possess, we improve the design and use very reliable materials or components which we select carefully in the process of purchasing. |
|
Convenience in dismantling, transportation and maintenance: |
>>Since we have constantly improved our design of pile drivers for more than 10 years, every part of the machine is easy to be taken apart, which provides convenience in transportation and maintenance. |
|
Multi-function: |
>>Our products are multi-function static hydraulic pile drivers with embracing pile driving, top-pressing pile driving or both at the same time because they are well combined with each other. |
Systemization and Maximization: |
>>Our company has developed 14 models of pile drivers with the capacity of 60 tons to 1200 tons and each model is classified into 4 kinds according to its function with the maximum tonnage of 1200. |
|
Flexibility in Designing: |
>>To keep up with the development in the engineering machinery of the world, we will integrate all useful high technologies from machine-building, electricity, hydromechanics and electronics into our products and meet different individual needs of our customers. |
|
Two Patents: | |
>>The design of inverted cylinder as a supporting leg which avoids the radial force on the piston extends the life-time Of the cylinder. |
Parameter/Model | ZYC700 | |
---|---|---|
Rate piling pressure(KN) | 7000 | |
Piling speed(m/min) | Fast | 7.0 |
Low | 1.02 | |
Piling stroke(m) | 1.9 | |
Pace(m) | Longitudinal | 3.6 |
Horizontal | 0.7 | |
Angle range(°) | 11 | |
Rise stroke(m) | 1.2 | |
Square pile(mm) | Max | 550 |
Circle pile(mm) | Max | 600 |
Side piling(mm) | 1250 | |
Corner piling space(mm) | 2500 | |
Lifting weight(t) | 16 | |
Pile hanging length(m) | 15 | |
Power(KW) | Piling | 111 |
Lifting | 30 | |
Main dimension(m) | Work length | 14.00 |
Work width | 8.16 | |
Transpot height | 3.15 | |
Total weight(t) | 700 |
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
Company Information
China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!
CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
Advantages
1 sincere
CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.
2 professional
Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.
3 quality
CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.
4speed
We have professional sales team to guarantee your reply within 12hours to save your precious time.
5 After sales
If the tower crane has any problems, we will solve your problems in first time.
- Q: Which price is low for a pile driver?
- Specializing in sales of steel sheet pile, steel sheet pile construction, leasing, model complete, high quality, the construction of steel sheet pile, the price is more favorable, and exquisite design, honest and trustworthy business purposes, in full accordance with the market-oriented, large-scale, standardized operation requirements specification, through the implementation of brand strategy to build the core competitiveness of enterprises
- Q: What kind of pile driver, rotary drilling machine can drill under medium weathering rock layer?
- The Xugong power head, wylong machinery mechanical lock rod rotary drilling rig Yuchai engine and can be weathered rock and sediment layer in the layer below, backfill soil drilling construction
- Q: Rules for operation of impact pile drivers
- Two, piling construction process, before piling construction, in the construction site around the axis control network testing and protection, and do a good mark, and transfer procedures. The construction process is as follows: lofting pile two Pile Lofting pile pile on pile machine machine alignment machine to feed the pile piling pile verticality correction electric welding welding cooling design requirements to stop piling pile hammer machine machine three, hammer pile construction technology and quality control measures of each Pile Lofting after two times of review and correct aligned with the pile location insert, the first section is slow into the retaining pile verticality, upper and lower section pile after aligning welding, welding inspection by the parties after natural cooling time to meet the requirements after piling, final penetration and elevation controlled by the supervision, party a visa confirmation after the stop hammer machine construction. (1) the quality of the pile is guaranteed by 1. After each pile comes into play, the pile shall be discharged after passing the qualification evaluation (including the qualification certificate, the pile type, the date of manufacture, the appearance quality, etc.), and the pile shall be stacked in plain and not too high layers.
- Q: What are the preparations for the piling site?
- 1, the pile position determination: according to the project provided by the construction unit and the pile axis location map of pile location, pile location must be accurate, and in the pile position by a soldering iron drilling, hole depth is 15~20cm, filled with lime, prevent in the process of driving the wrong pile.2. Pile up(1) pile stacking shall be determined by pile driving route and pile driving sequence(2) the site shall be level and level with three passes and one leveling. Remove obstacles in the ground, underground and air in the range of the moving of the pile driver. The wooden posts and the pile rings shall be of the same position, except for the contact between the pile and the pile, and nothing else shall be in contact with the pile so as to prevent cracks in the pile.(3) the strength of reinforced concrete precast piles must be up to 100% before they can be transported and piled3, the selection of pile machineAccording to the design of single pile bearing capacity and pile length, this project intends to use hammer weight 2.5t track type diesel pile driver.
- Q: How to realize the remote control of pile driver (machine)?
- Hello,Piling machine (Mechanical) are generally used for CAN-bus communication, similar to the traditional automobile communication scheme is using twisted pair as a communication medium, if you want to achieve wireless communication, can be used to achieve CANWiFi-200T conversion between CAN communication and WiFi communication, the wireless communication distance is limited, generally at about 50 meters.
- Q: Track excavator truck model, preferably material, and some are sent to the mailbox thank you very much
- You can get them with the manufacturers who produce them. They usually do. Not really. Just find someone to look at the equipment and draw one.
- Q: Can you drive an excavator? Can you learn it quickly?
- What you said is the steel sheet pile hammer shock, will not have to open the machine learning
- Q: Code for installation and operation of pile drivers
- 4. Check whether the voltage of the power supply meets the requirements.5, according to the daily maintenance project to each department lubrication, maintenance.Five, pile driver in the work safety precautions:1, when the piling machine work, there should be special command. The conductor and operator should check each other's signals before they work. Work closely together.2, at the start of the bell signal or other applications, notify the staff around to leave.3, hammer and pile cap, pile cap and column (or pile) plane to pad, a connecting bolt should be tightened, and should always check whether there is loose.4. The starting of the pile driver should be adjusted from low gear to high speed.5, the pile driver in the work should be closely observed on the control panel current, voltage instructions. If abnormal sound or other abnormal conditions are found, stop inspection immediately.6, always check the temperature of the bearing and the bearing cover screws is loosening, should strictly examine the eccentric block coupling screw loosening, prevent the occurrence of accidents.7, sink, column (or pile) prohibited to stand around.8, piling machine with water, mud suction sink, should contact in advance with the relevant personnel, and take care of each other at work.9, long pipe column or pile and the installation of pile cap, the staff must wear safety belts.10 、 in the process of sinking, it is strictly prohibited to do mechanical maintenance work.Six after the stop of the piling machine, the power shall be cut off immediately, and the pile driver and motor shall be inspected and maintained.Seven, piling machine long-term disabled, should be kept in storage, the motor should be good moisture-proof protection, the control panel of the instrument, should be removed, storage, storage.
- Q: Should the starting current be considered when the piling machine is in use?
- There are two main types of pile driver used at present: diesel hammer pile driver and long spiral drilling rig.In general, long spiral ring power head motor starting current depends on the specific circumstances, if the full voltage starting with load, the starting current is 5-7 times the rated current of the power supply. The construction of their equipment. In addition to see how much power head in the face of tricyclic sticking case, two start if exceeds the rated current of it easily after all, a burning motor, power head is not cheap, suggest to consider all hydraulic power head, the power head is three was a bit expensive, but in the face of the card when drilling, two times can start easily and smoothly, the impact of the power grid is very small. Moreover, the torque of the hydraulic power head is 2-3 times as much as that of the ordinary three ring power head. It is more suitable for complex formation than the traditional long spiral, and the construction efficiency is more efficient. Long spiral drill in the type piling machine is the use of a more extensive, and for starting current understanding, we can get better in the construction layout, so as to avoid the occurrence of the voltage is not enough at the time of construction.
- Q: PV pile driver
- Shandong Tengzhou production of this idiot manufacturers have a few, can come to Shandong to look strong, has many years of construction experience in complex terrain. Can prevent landslides and broken stones.
Send your message to us
ZYC700 Used Pile Driver Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords