ZYC series ZYC320B multi-functional Hydraulic Static Pile Driver
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
ZYC series ZYC320B multi-functional Hydraulic Static Pile Driver
Company Information
China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!
CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
Features:
Main product: ZYC series multi-functional Hydraulic Static Pile Driver Self-developed with 5 up-to-date patents.
The working principle is using hydraulic pressure to clamp precasted pile, H shape or other shape steel pile, and then driving the pile into ground by hydraulic pressing.
Suitable for piling precast round & square concrete pile, H shape steel pile and other irregular-shaped pile in clay, soft soil and sandy ground.
It has characteristics of no noise, no vibration, no pollution, clear ground with high speed of pile driving, reliable construction quality and environmental protection, high efficiency, energy saving. It is welcomed by the customers with wide market prospect.
● Flexible connection technology
Novel flexible connection technology of central axis, won national practical patent
● Multi-functional piling technology
Original combination clamping piling and top piling won invention patent
● Inverted cylingder technology
Structure design of inverted cylinder changes strained condition of cylinder and increases the service life of cylinder, won national practical patent
● Integrative side and corner piling technology
Particular side and corner piling mechanism increasing the capability of side & corner piling and won national practical patent
Self-adaptive clamping mechanism
Original self-adaptive clamping mechanism won national practical patent
Parameters:
Rated piling pressure(tf) | 320 | suitable pile & specification(mm) | 300-350 ¢300-400 | |
Max. Piling speed(m/min) | 7.7 | Max. Crane lifting weight(t) | 12 | |
Piling stroke(m) | 1.8 | Hanging pile length(m) | 14 | |
Max. Longitudinal pace(m) | 3.6 | Minimum side piling space(mm) | / | |
Max. Transverse pace(m) | 0.6 | Minimum corner piling space(mm) | / | |
Max. Rise stroke(m) | 1.0 | Intensity of pressure(tf/m²) | 10.2/11.2 | |
Max.rotation angle per time(°) | 15° | Weight composition | (t) Machine weight | 110±2 |
Rated hydraulic system pressure(mpa) | 23(20) | Added water weight(t) | 26 | |
Hydraulic Pump (Unit × Ml/Turn) | 2×80+1×80 | Counter weight(t) | 184 | |
Motor power (Unit × kw) | 2×37+1×30 | Total weight(t) ≥ | 320 |
FAQ
To provide customers with professional and technical services, to meet the demands of customers for construction efficiency and cost control, to achieve value for customers, which is the constant pursuit of Toppile, Toppile implant this concept in the whole process of sales and services.
Before sales
Research market with customers; provide technical advice, customized design and production.
On sales
Always communicate and adjust of design with customer to ensure the product satisfy all requirements.
After sales
Provide installation, adjustment, maintenance service, create customers files, following up machine working situation, provide customer a whole set of “Butler” and “Gapless”services.
Value added services
Redesign and upgrade the hydraulic system of piling machine, upgrade structure components.
Provide high quality and lower price components.
Toppile is the agent of many components factories, including cylinders, pumps, seals, hydraulic elements.
Advantages
1 sincere
CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.
2 professional
Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.
3 quality
CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.
4speed
We have professional sales team to guarantee your reply within 12hours to save your precious time.
5 After sales
If the tower crane has any problems, we will solve your problems in first time.
- Q:Code for installation and operation of pile drivers
- First, piling machine operators must be familiar with the structure of the machine, performance, operation essentials and safety precautions, after passing the test and obtain a certificate, you can operate alone.Two, operators must concentrate on the operation. Do not talk, laugh, play or make trouble with unrelated persons. No smoking or food is allowed during the operation.Three, strictly abide by the relevant provisions of the maintenance of pile drivers, conscientiously do all levels of maintenance, to ensure that pile drivers are often in good condition. And pay attention to the rational use, correct operation.Four, the pile driver in the work should be prepared for the following:1, to the construction staff understand the construction conditions and tasks, and construction problems found in this class should pay attention to matters.2. Adjust the position of the speed change gear of the pile driver according to the vibration force required by the construction personnel.3. Check whether the insulation of cables and wires is good. Check that the controller's contacts are good and that the bounds are correct.
- Q:Pile up can not go down, how to deal with?
- 1. If the hammer is reached, the hammer is finished.2, according to the geological report should be able to play but did not move, can not continue to fight, otherwise the pile will crack or break, stop and find out the reason.
- Q:How many piles can a small pile driver hit in a day?
- You can Baidu a little dragon, small pile driver consulting
- Q:5A few days ago bought a highway guardrail, piling machine, because the hammer piling frequency is too high, too much strength, not good control, please experts pointing adjustment method or operation method. Thank you
- You can only use the nitrogen charging device to release the nitrogen from the hydraulic hammer, and remember that the value is better than the 1-1.2
- Q:The piling machine and the appearance are not considered as large machinery import and export fields
- See what kind of bar! If it is a small blue ocean highway, the pile driver is not large, even if the loading type. The foundation pile driver is different from the other machines and should be counted
- Q:What are the parts of a pile driver?
- The hammer into the exhaust valve reversing by manual control, can also be installed in the side with the hammer and hammer lifting flange lever automatic control, impact stroke two ways can adjust the hammer. Three diesel hammer body is made of cylinder and piston, similar to the working principle and the single cylinder two stroke diesel engine into the cylinder combustion under high temperature and high pressure atomized diesel combustion chamber by injection pressure generated by the detonation driven hammer working. According to the structural form of diesel hammer rod and cylinder type separation. The guide rod type diesel hammer is pressed on the pile cap with a plunger as a hammer seat, and the cylinder is used as a hammer head to move up and down along the two guide rods. When in operation, the pile hanging in place pile frame in Longmen, then put the diesel hammer at the top of the pile, the hook will lift down the cylinder, and the cylinder sleeve off hook to the whereabouts of the piston, the cylinder will be closed in the air compression cylinder rocker pin until the pressure continues to fall outside the cylinder pushing hammer on the base of the fuel pump, fuel pump will be injected into the cylinder oil mist, oil mist meet high temperature gas burning immediately above, blasting, explosive shock down pile., to push the cylinder to cylinder to rise, fall along the guide rod, and the beginning of the second impact cycle. The cylinder type diesel hammer takes the cylinder as the hammer seat and directly uses the lengthened cylinder to guide the inner wall.
- Q:Buying a pile driver doesn't know how to make a profit Has anyone done that yet?
- Generally speaking, piling this industry is better to make money, but it will be more difficult, after all, is heavy physical labor. If you can do it for a long time, you can make money basically. But also can not guarantee, mainly depends on how your construction site, and whether you can answer the live, the most important thing is to have a good pile driver, long service life, mechanical problems.
- Q:How much is piling foundation for pile driving machine?
- Piling machine prices from more than ten million to millions of, and the specific depends on how big you hit the pile, the specific configuration. Selection of models requires selection according to use.
- Q:How many tons of pile drivers are used to hit 400X400 square piles?
- Usually with 6.3 ton or 8.3 tons of guide rod, diesel hammer will be able to hit. The static pile machine is not clear.
- Q:Pile foundation
- At the bottom of the drill bit, when rotating, the soil layer becomes loose and becomes slag. It is suspended by mud and overflowed with mud. The well wall is protected by water head and mud. Reverse circulation rotary drilling: the mud flows into the borehole from the mud pool and is mixed with drilling slag. Suction role in vacuum pump, drill into a slag mixture into the mouth, through the drill pipe, and a slurry pump debris control raft excreted into the sedimentation tank cleaning, for further use. Because the bore diameter of drill pipe is much smaller than that of well bore, the water slurry in drill pipe is increased by 4~5 times faster than that of positive circle, and it is dominant in drilling hole of bridge drilling pile.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
ZYC series ZYC320B multi-functional Hydraulic Static Pile Driver
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords