Wheel Loader Engineering Machine XCMG Lw300fn for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Wheel Loader Engineering Machine XCMG Lw300fn for Sale
Product Details
Basic Info.
Model NO.:lw300fn
Type:Large Loader
Usage:Universal Type
Scraper Type:Front End Loader
Transmission:Hydraulic Transmission
Walking Mode:Wheeled
Load and Unload Method:Front Discharge
Engine Power:162kw
Certification:CE, ISO9001: 2000
Condition:New
Color:Yellow
Rated Load:5000kg
L*W*H:8165*3016*3485
Country of Origin:China
Brand:XCMG
Mqo:1
Port:Qingday/Shanghai/Tianjing
Export Markets:South America, Southeast Asia, Africa, Eastern Asia
Additional Info.
Trademark:XCMG
Packing:Nude Packing
Origin:Jiangsu, China
HS Code:84295100
Production Capacity:1000 Units Per Year
Product Description
XCMG 3 ton high quality wheel loader lw300fn
Our company will offer you the high quality products with a low price, quick delivery, and professional after-sale service.
Product Description
With the features of maturity and reliability of the old model, LW300Fis improved all round, and leads in the same kind of product. LW300F adopts metal cab and hood, and electrophoretic coating. The machine features high efficiency, strong power, long service life and comfortability, and is applicable to various conditions.
1. Rated operating Load: 3000kg,
2. Bucket capacity: 1.8 m3
3. Machine weight: 10000KG
4. Tyre size: 17.5-25-12PR
Item | Parameter | Unit | ||
---|---|---|---|---|
Rated load | 3.0 | t | ||
Bucket capacity | 1.8 | m 3 | ||
Dumping height | 2892 | mm | ||
Dumping distance | 1104 | mm | ||
Max. drawing force | ≥120 | kN | ||
Max. traction | ≥90 | kN | ||
Dimension (Length × Width × Height ) | 6905×2470×3028 | mm | ||
Operating weight | 10.0 | t | ||
Boom lifting time | 5.65 | s | ||
Total time of three devices | 10.3 | s | ||
Wheelbase | 2600 | mm | ||
Min. turning radius (bucket outer) | 5925 | mm | ||
Rated power | 92 | km/h | ||
Travel s peed I Gear (Forward/Backward) | 0~10/14 | km/h | ||
II Gear (Forward/Backward) | 0~16/25 | km/h | ||
III Gear (Forward) | 0~21 | km/h | ||
IV Gear (Forward) | 0~35 | km/h | ||
- Q: How is this machine all around ? What else is in same circuit as the drive motor ? Thank you very much !!!!!
- No idea sorry,but i searched for 30 minutes for an answer...
- Q: I have a Komatsu PC50 mini-excavator. My worker changed the diesel filter and now it won't start. He says the diesel isn't getting through so perhaps there are air pockets? How would I resolve this issue?
- 1. Loosen the fittings on the filter to purge air... 2. Lightly ether start engine... 3. Tighten fittings when leaking diesel fuel...
- Q: Excavator first originated in that country?
- The first invention of backhoe loader manufacturers - Keith Keith tracked and wheeled excavator pioneer in 1951, the first full hydraulic backhoe excavator located by the French Poclain (POCLAIN) launched the factory, thus creating a new excavator in the field of technology development space. In 1961, the Poclain plant introduced the TY45 wheel hydraulic excavator again, making it the best excavator manufacturer in the industry. In the mid 60s, Keith produced and sold excavators in the United States with 6 types
- Q: Im playing the new moon map and at some point both excavators come on, cutting off the entire map. Is there any way of getting around them aside from hacking the control panels or getting headbutted by the astronaut?
- hack one of the green light in the first room
- Q: I need one for the panama canal what brands and models fit the specs. It cant be small it needs to be a medium sized one.
- That is hard to answer without knowing what you are doing with it. What reach do you need? how much weight will it be lifting? are you loading trucks? what size bucket do you need? A 320 Cat is a smaller excavator where a 330 is closer to a medium size excavator. Th next question is what about parts and service? If your on a production job you need to think about parts and service availability. Would you want a contractor to go and do the job? Write me back and I'll see if I can help.
- Q: I am looking to an excavator or a place to but cheap uncleaned roman coins. I am looking to buy uncleaned coins for $1 or less if possible!
- Under $1? Wow! You don't ask for much. The first link appears to be outdated, but the second link might be helpful.
- Q: the nature of subsoil, the width, the depth and the placing of the support system will governed the method of?
- Hello okorder /
- Q: them outside right now at my father-in-law's. I'm pretty sure the perc rate will be between 1-5 minutes for 1 inch of water, but we're going to do the official test in a little bit to check. The soil here is sandy and it's a three bedroom house with 3 people living in it and 4 people who visit almost every weekend.
- 8 to 10ft is deep enough, Be sure to embed your Leach Lines in about 6 to 8 ft of Pea Gravel filling out the Bottom to Leach lines. You should Start from your Liquids Tank and Start your down flow about a 1/4 Bubble on a 2 to 4ft Level until you get to the End. Also you can reduce your PVC PIPE FROM 4 TO 2 PVC. At the opening of your hole T- off run 5 to 10 Leach Lines space them 2 to 3 apart fill top of lines With Pea Gravel Top Soil and Pack well. One noteable; You might want to Line the bottom of your leach Hole Polyurathane, Oil or Sulpher and Lime to prevent mold Mildew. Hope I Helped you as simple as Possible.
- Q: Komatsu PC series excavators -5, -6, -7, -8. Which year did they begin production?
- This is the case at homeProduction began in November, -5:1995-6:1997 began in January-7:2002 began in September-8:2007 began in SeptemberabroadMay, -5:88November, -6:1992April, -7:2001September, -8:05
- Q: What card does excavator driver need to mount guard?
- Operation certificate, special operation certificate!Specific to the driving school inquiry, half of the large driving schools have agents, as well as excavators, schools are also agents here documents test!Usually 800 yuan each
Send your message to us
Wheel Loader Engineering Machine XCMG Lw300fn for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords