Tower Crane The Product model-TC5010(angle bar)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TC5010 hydraulic self-lifting tower crane is a new-style hoisting and transporting machine designed to meet the need of assembling high-level construction equipment. The product is an upper rotary self-lifting kind with horizontal jib, trolley amplitude. The length of the jib is 50m, rated maximum lifting capacity is 5t, Tip load at 50 m is 1t and rated maximum lifting moment is 570kN.m. The following is the main characteristics.
1. Wide applicability. The applicability is ranging from civil construction in small and medium cities, to high-rise, multi-layered civil construction in big cities. It can also be used in the construction of multi-layered industrial factories, in the slip-form construction of huge chimneys and silos and in goods loading in port or goods yard.
2. Easy to assemble and disassemble. Hydraulic jacking device is employed to increase or reduce crane standard section to adjust crane height to construction height.
3. High speed, easy adjustment, stable operation and high efficiency. Low speed with heavy load and high speed with light load can be realized through lifting structure. Two kinds of speed of trolley can meet operational needs. Open stopper is equipped to slewing structure, enabling precise placement and easy assembly of crane.
4. Complete protective and reliable safety devices. The product is equipped with weight limit, moment limit, height limit, trolley limit and slewing limit to ensure normal operation. Besides rest platform, protective railings are also equipped.
5. Driver’s cabin is separately set. It is broad, bright, comfortable, safe and easy to operate.
The product is supplied with the basic height (Free standing) 32.5m.If it is used in high-rise construction, the number of standard sections and attached devices can be increased to meet consumers’ needs. The maximum height of the product is 120m.
(Free standing height is 32.5m and attached height 120m are the maximum lifting height of crane lifting hook.)
Parameter list(list 1)
List 1 parameter list
Max.working range | m | 50 | ||||||
Rated load moment | kN.m | 570 | ||||||
Max.Load | T | 5 | ||||||
Min.working range | m | 3 | ||||||
KN | T | a=2 | a=4 | |||||
1.045 | 1.036 | |||||||
Max.lifting load range | m | a=2 | a=4 | |||||
24.17 | 12.92 | |||||||
Lifting Height | Free height | m | 32.5 | |||||
Attached height | a=2 120 | a=4 60 | ||||||
Size of the whole | Foundation base | M | 5×5 | |||||
Overall height | Free height | 42.23 | ||||||
Attached height | 128.43 | |||||||
Tip to slewing center | 51.13 | |||||||
Balance jib to slewing center | 11.18 | |||||||
Whole machine weight | Free height (without counterweight) | T | 20.98 | |||||
Attached height (without counterweight) | T | 43.98 | ||||||
Counterweight | T | 10.5 | ||||||
Other | Total power | KW | 25.9 | |||||
Wind speed | m/s | Working ≤20 | ||||||
Jacking mast section ≤12 | ||||||||
Operating temperature | 0C | -20~+40 | ||||||
Facilities data(list 2)
Trolley Mechanism | Motor | Model | YDES112-4/8 | ||||
Speed | r/min | 1380 | 710 | ||||
Power | KW | 2.4 | 1.5 | ||||
Decelerator | Model | BE2450X | |||||
Gear ratio | 39 | ||||||
Trolley speed | m/min | 40/20 | |||||
Lifting Mechanism | Motor | Model | YZTDE200L3 -4/8/24 | ||||
Speed | r/min | 1440 | 720 | 220 | |||
Power | KW | 18 | 18 | 5 | |||
Decelerator | Center distance | Mm | 460 | ||||
Gear ratio | I | 18.2 | |||||
Rope capacity | M | 280 | |||||
Brake | Model | YT145Z/5 | |||||
Brake force | N | 450 | |||||
Lifting speed | m/min | 65/32.5 | 32.5/16 | 7.3/3.6 | |||
Rated load | T | 1.25/2.5 | 2.5/5 | 2.5/5 | |||
Min.speed of descent | m/min | <7.3 | |||||
Total weight | T | 1.2 | |||||
Slewing Mechanism | Motor | Model | 132M2-4 | ||||
Speed | r/min | 1410 | |||||
Power | KW | 3.7 | |||||
Decelerator | Model | 100Z | |||||
Gear ratio | I | 150 | |||||
Output torque | N·m | 8300 | |||||
Pinion gear | Modulo | M | 10 | ||||
Teeth no. | Z | 15 | |||||
Stand-off error | X | +0.5 | |||||
Hydraulic coupling | Model | YOX280A | |||||
Rotary support | Model | 011.40.1120 | |||||
Speed | r/min | 0.71 | |||||
Hydraulic jacking device | Hydraulic oil station | Working pressure | Mpa | 25 | |||
power | KW | 4 | |||||
Oil cylinder | Rated pressure | Mpa | 20 | ||||
Bore | Mm | Φ140 | |||||
Stem diameter | Mm | Φ90 | |||||
Travel | Mm | 1300 | |||||
Installation distance | mm | 1748 | |||||
Jacking speed | m/min | 0.4 | |||||
KN | t | 30 | |||||
Loading capacity
50M Ratio two | ||||||||||||||||||||||
R(m) | 3~24.17 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | |||||||||
Load C (KG) | 2500 | 2406 | 2302 | 2205 | 2115 | 2031 | 1953 | 1879 | 1811 | 1746 | 1686 | 1629 | 1575 | |||||||||
R(m) | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | |||||||||
Load C(Kg) | 1523 | 1475 | 1429 | 1385 | 1344 | 1304 | 1267 | 1231 | 1196 | 1164 | 1132 | 1102 | 1073 | |||||||||
R(m) | 50 | |||||||||||||||||||||
Load C(Kg) | 1045 | |||||||||||||||||||||
50M Ratio four | ||||||||||||||||||||||
R(m) | 3~12.92 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | |||||||||
Load C (Kg) | 5000 | 4968 | 4589 | 4260 | 3972 | 3718 | 3493 | 3291 | 3109 | 2944 | 2795 | 2658 | 2533 | |||||||||
R(m) | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | |||||||||
Load C (Kg) | 2418 | 2312 | 2213 | 2122 | 2037 | 1958 | 1883 | 1814 | 1748 | 1687 | 1629 | 1574 | 1522 | |||||||||
R(m) | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | |||||||||
Load C (Kg) | 1473 | 1426 | 1382 | 1340 | 1300 | 1261 | 1225 | 1190 | 1157 | 1125 | 1094 | 1065 | 1036 |
Tower crane mast section
Product photo
- Q:How would the environment, habitat, or ecosystem be affected if whooping cranes were extinct?
- the whopoping crane is not a part of the food chain. Nothing would happen. 100 birds is not a pencil point in the data. We spend millions on this bird and it's lose would NOT be noticed by anyone. I'll bet not one person on this form has even seen one, can tell us what is food chain function is. A link to a post or wikpedia won't cut it either, I want the exact species that is in the chain both up and down and what the exact effect would be. Since no one can give a specific chapter and versus on the specifics and talk about genaerizations, IMHO, I'm correct. NOW If the question was about the loss of all Raptors in the world, there would be an upset. The Whooping crane in it's self is so small it's impact of lose is zero. I call BS on the poster that says she saw them in FL. NOT ONE SINGLE WEB site lists FL as it's home range. You could at least have gone to Wiki and gotten your facts right and answered my AP question, but you instead tried a red herring act to promote your bias. PS I've been to the AP and know all about them (clue tell us what I meant here and prove you are a player on this subject)
- Q:A crane lifts a 425 kg steel beam vertically a distance of 117m. How much work does the crane do on the beam if the beam accelerates upward at 1.8 m/s^2? Neglect frictional forces.a.) 3.4 x 10^5 Jb.) 4.0 x 10^5 Jc.) 5.8 x 10^5 Jd.) 4.9 x 10^5 JSolved as W= mgh but obviously that is wrong. Where do I go wrong?
- You have the right idea, the answer is d. EDIT: Well I actually read the rest of the question (sometimes I get an itchy trigger finger!), and the net force should be found first, the net force includes the weight and the tension in the crane's cable (so you need to find the tension): ∑F = ma = T - mg T = m(a + g) = 425kg(1.80m/s? + 9.80m/s?) = 4930N So the net force is the sum of the tension in the cable and the weight of the beam, or: F = T - mg = 4930N - (425kg)(9.80m/s?) = 735N Then, the work done by the crane is: W = FΔy = 735N(117m) = 8.95 x 10^4J Does not match any of your choices, so I am perplexed! Maybe someone will straighten me out. Apologies if I failed to help.
- Q:What are the types of tower cranes?
- The tower crane is divided into: fixed tower crane mobile tower crane self lifting tower crane mobile tower crane is divided into: rail type tire type automobile type self lifting tower crane is divided into: attachment type climbing uses: concrete with cage for loading and unloading installation general building mixed
- Q:How to select tower crane type according to the height of building? Seek explanation
- This depends on the height of your building, the area, the choice of tower cranes, the model is different, his work coverage is not the same. Now for tower crane, height is not a problem, mainly depends on the size of your building, not in the crane's scope of operation.
- Q:I've come up with a few reasons, if someone could add on to it then that would be wonderful!Thank you for answering my question :D
- A crane allows us to place light or heavy loads with precession and safety; on top of buildings, across water ways, down mine shafts and over obstacles. Building a pyramid today would be done with cranes, instead of building ramps to slide the massive stone blocks up. Cranes speed up any construction project. Cranes eliminate a lot of manual labor. Cranes prevent injuries by doing the hard work. One example, we used a crane to lift off an entire house roof, in one piece. We then built a second story and then used the crane again to put the roof back on. Without a crane, it would have taken several days to tear off the shingles, remove the roof sheeting and the trusses, not to mention the money saved. The building codes do not allow the reuse of wood trusses, yet not taking the roof apart, allowed use to reuse the trusses, a savings of hundreds of dollars. Wingman
- Q:What does tower crane jacking up mean?
- First of all, the boom and trim balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.Jiangsu Zhendong port machinery manufacturing heavy port machinery is a professional manufacturer of mechanism
- Q:Method for operating tower crane
- In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
- Q:How do cranes get put together?
- They're just born that way! lol, just kidding!
- Q:Absolutely bs. I hope a crane falls on ALL these effin construction workers and their families and the building executives' heads. Let THEM have family members die or get hurt from these accidents - then they will get what's coming to them. They should all burn in hell. Total greed total total greed. They will pay
- the inspectors are only partly to blame. In most cases they are inspecting something they don't have a clue as to how it works. The building inspectors i believe were the ones in charge of the n.y.c. inspections. they can only see the obvious problems. the rest must be caught during the yearlies or during mobilization of the machine!
- Q:what do you mean by a detente ball in the crane of a revolver?
- a okorder /
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane The Product model-TC5010(angle bar)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords