• Tower Crane TC5210 System 1
  • Tower Crane TC5210 System 2
  • Tower Crane TC5210 System 3
Tower Crane TC5210

Tower Crane TC5210

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC5210 is a new style crane from cnbm, which is topless style.

Its max iftng capacity is 5.0t, and tip load is 1.0m.

Jib length is 52m

Free standing height is 34m

This fatop model crane is not only good quality, easy installation, but also competitive price.

CNBM Group has always been adhering to the business tenet of "quality first, credit first", regarding customers as God and workers as source of development, paying attention to technology development, service and product quality, introducing and innovating brand products, and injecting endless vigor and vitality to the company development.

CNBM Group has strong technical force and excellent testing equipment. In 2001 it passed IS09001: 2000 Quality Management System Certification, and enhanced both management and service quality. With China's entry into WTO, Wanfeng Group keeps an eye on the world development and continuously expands foreign markets. In 2004, its products entered the international market, in 2006 took the lead to achieve license to enter the Russian market, and in 2007 passed CE certification and opened the door to the EU market, winning favorable opportunity for construction in foreign market. With good reputation and services, our products attracted are more and more foreign customers.

China National Building Materials Group Corporation (CNBM) was established in 1984 with approval from the State Council, and then became a Central Enterprise under direct supervision of State-owned Assets Supervision and Administration Commission of the State Council in 2003.


Upholding the philosophy of “Making Best Use of Resources to Serve Construction”, and vigorously carrying out such strategies as “technical innovation”, “internationalization of building materials”, and “building strength with talents”, CNBM is the largest comprehensive building materials industry group in China that integrates scientific research, manufacturing and logistics into one entity, and consists of four business platforms, i.e. industry, technology, complete set of equipment, and trading & logistics. As of the end of 2009, CNBM’s total assets exceeded RMB 110 billion, with 100,000 employees, and 20 companies under direct management with 100% share control or majority control, among which 6 were listed companies, including 2 overseas listed.


CNBM practices the parent-subsidiary management system, and is one of those wholly state-owned enterprises carrying out the pilot trial of Board of Directors system and innovation system. As the strategic center, decision center, resources center, and policy & culture center, our Group exercises its right as a contributor. Whereas, our sub-groups functioning as business platforms, are mandated to construct the profit center based on their core competences to enlarge brand awareness and increase market share.

Tower Crane TC5210Tower Crane TC5210

Q:I'm talking about one of the ones where the cabin and the worker is high up in the air. You cant exactly remove a part of the bottom of the cranes structure because it would fall on top of you but you cant remove the cabin because its so high up and what can get up that high to remove it except another crane BUT how did that get built ?Thank you.
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q:could someone give me a good summary on the red badge of courage, and yes i did read the book and i have trouble understanding, and help would be good thanks!!
A kid, full of beans, runs off to join the army to annoy his mum, but on the eve of battle suddenly becomes paranoid that he'll do something to disgrace himself through cowardice. (That's actually as far as I got in the book so far.) I am given to understand, though, that in his own mind at least he does disgrace himself and endeavours for the rest of the book to redeem his manliness. In that sense the story arc, or at least the character arc, is not dissimilar to The Four Feathers. The point of the story is to counterpoint the myths of warrior gung-ho and daring-do, and to analyse the inner anxieties and motivations of the individual, volunteer-citizen soldier, and by extension the expectations of society. The novel also presents the battlefield with an unprecedented realism; that is to say, Crane presents the actual fog of war that authors have always set out to clear.
Q:tell me how to do it, in the easiest way
There okorder /
Q:What are the differences between the tower crane and the lift?
Tower cranes are a common fixture at any major construction site. They're pretty hard to miss -- they often rise hundreds of feet into the air, and can reach out just as far. While, Lift is the force that directly opposes the weight of an airplane and holds the airplane in the air. So, first answerer is right they not something alike.
Q:We see lots of cranes doing some heavy lifting during construction. But how do they get so high up these buildings? And when construction is nearly done, how do they go back down?
Depends on the building of course. Either a taller crane is brought in to lift them, or they're lifted by helicopter. And sometimes a building effectively builds itself, and the crane moves up with the construction platform after being constructed at ground level. Will still need a helicopter to remove it of course.
Q:Information of distributor or manufacturer for Crane Lake Cellars will be helpful too.
contact address crane lake cellars vineyard winery napa california
Q:why was the japanese crane hunted for its plumage in the 20th century?
At okorder /
Q:They;re ENORMOUS!!! Do they take them apart or something?
Large cranes are dismantled and sections are placed on numerous flatbed semi-trucks and transported to other locations. Typically this is done early morning, or late evening when traffic is at its minimum. Sections are typically no longer that 60' in length.
Q:how to draw a crane hook on auto cad?
Measure a crane hook then draw it. Even better, visit a manufacturer's web site and see if you can download one of their drawings for a hook.
Q:because i have this huge sofa i need to get to 2nd floor but i cant coz the staircase is too small
Talk to a lumber yard that has a boom truck. Ask them how much to do it. A boom truck will cost much less than a crane. A boom truck can reach 45 to 50 feet. In this economy they are looking for anything they can get. They will most likely do it. But when really busy they wont. But things are slow. Builder 30 years. A crane will cost about 250.00 of the first hour. with a one hour min.
We are a national comprehensive Class-A scientific research and design unit, an internationalized engineering group company and a key national-level hi-tech enterprise, and is the engineering technical platform of China National Building Material Co., Ltd.

1. Manufacturer Overview

Location Shanghai,China
Year Established 1949
Annual Output Value Below US$1 Million
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Central America
Northern Europe
Southern Europe
South Asia
Domestic Market
Company Certifications ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port SHANGHAI
Export Percentage 91% - 100%
No.of Employees in Trade Department 200
Language Spoken: English,Chinese
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords