Tower Crane TC6016 stepless speed in China

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details

Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 10T

Span: 60m                                             Place of Origin: China(Mainland) 

Brand Name: CMAX                              Model Number: TC6016         


Packaging & Delivery

Packaging Detail: Nude package          Delivery Detail: 25-30days



● Max. working range 60m, tip lifting weight 1.6T and Max. lifting weight 10T.

● Slewing mechanism and trolleying mechanism equipped with VFD technical control, stable and reliable,can provide stepless speed regulation.

● Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.



Q: What is the difference between CNBM and CMAX?

A: CNBM stands for China National Building Materials (Group) Corporation, which is established in 1984, is the largest state-owned group corporation of building material & machinery with a total asset of 15 billion USD and a staff of 100000.

CMAX is the brand name of CNBM Group’s construction products, C stands for China and Max stands for Maximum.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, CNBM could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….


Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.


Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


To Lead The Revoluation of International Trade

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Where can i read Cape Hatteras by Hart Crane online?
I Try searching lines from the poem if that doesn't work for you like imponderable the dinosaur sinks slow.
Q:Do cranes play major role in Japanese culture? How so? Do cranes live in Japan?
Red-crowned cranes (also known as Japanese cranes and Manchurian cranes) breed in Siberia and Mongolia during the spring and summer but migrate in flocks to Japan, Korea, Taiwan, China, and other East Asian countries for the winter season. They are the second rarest crane in the world, and it is known as a symbol of good fortune, longevity, and fidelity in these countries. In Japan, they are considered to be a national treasure. They frequently appear in art, literature, and folklore. I remember a tale about a lonely man in winter and finding a crane nearly dead in the snow. He nursed the crane in his home until it was well enough to fly away on its own. The next winter, the crane came back as a beautiful maiden wearing the finest red and gold silks. She promised to live with his man and weave silks for him to sell. The only catch was that he was to never look at her while she was working. They lived happily for a while, until one day he couldn't hold in his curiousity any longer. He took a peek behind the screen and saw a crane weaving silk with its feathers! Naturally, the crane noticed and flew away, never to return. In Japan, cranes are said to have the legendary lifespan of 1,000 years (hence, the folding of 1,000 paper cranes). Cranes are also known to mate for life, making them a popular motif at weddings and anniversaries.
Q:How are construction cranes built in the first place?
The first crane generally arrives on a trailer or on it's own wheels.
Q:What are the safety devices in a tower crane?
Answer: 1: height limit2: lifting weight limiter3: torque limiter4: travel limiter5: speed (maximum speed of force must be more than 40m/min)6: put a device (jib tower crane to move) must have7: the rotary limiter (no collector on the revolving part) must have8: car broken rope protection9: anemometer (boom root hinge point height is greater than 50m should be set)10: windproof device (rail type)11: buffer and end stop12: Rail sweeping plate (rail)13: protective cover14: derailment device15: emergency power off switch (red mushroom head)
Q:why do cranes have outriggers?
the capacity of a travelling crane relates to its resistance to tipping, and is dependent upon wheelbase, which can be extended by use of the outriggers, and counterweight (the big boxy thing at the back of the crane). Every lift requires a firm and stable platform which is what the outriggers provide. For every lift (weight) and reach (how far from the slew point), there is a limiting capacity factor. This is required to be posted within the operator's cab. The actual load lifted may be monitored by a load cell on a running rope (or other location), and through a computer control, limit the actual capacity of the crane.
Q:What are the safety devices for the horizontal arm self lifting tower cranes?
(1) the lift height limit position limiter must be able to stop lifting motion immediately when the lifting device is raised to the 8OOmm at the lower end of the boom. For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately. (2) lifting moment limiter and maximum weight limiter; when lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped. If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value. When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.
Q:Are electric bug zappers effective for killing crane flies?
I'm sure they are, but keep it away from your house or you're going to be attracting more bugs and have them dead near your house.
Q:Math help, Two cranes can unload a ship?
No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x² - 16x) = 1/15 15(2x - 16) = x² - 16x 30x - 240 = x² - 16x x² - 46x = - 240 x² - 23x = - 240 + (- 23)² x² - 23x = - 240 + 529 (x - 23)² = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1
Q:Tower crane; command; gesture
1. prepare (note): arm extension, placed above the head, five fingers stretched out naturally, palm forward remain motionless.2. main hook: single hand natural fist, in the head, touch the head3. auxiliary hook: a hand clenched, small arm to immobile on the other hand, elbow, hand hand touch before.4. hook up: small arm to the side of the upper extension, five fingers natural extension, higher than the shoulder, with the wrist as the axis rotation.
Q:How do you erect a crane. surely you would need a crane to make a crane.?
Modern building cranes (the tower cranes that you see on most building sites) have the ability built in to jack themselves up as the building grows. Jacks raise the crane at ground level, allowing a new section to be inserted at the bottom of the tower. But the crane arrives at the building site in pieces, and a small truck-mounted or crawling crane may in fact be required to assemble and erect the tower crane - so, except for the smallest cranes that could be put up by hand, you are correct.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range