Tower Crane Sales TC6024 Construction Equipment Wholesaler
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC6024 Description:
1.CMAX Tower Crane TC6024 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC6024 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC6024 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC6024 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC6024 Parameter:
Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50.5
Max height with attachment (m) 200
Working range can be adjusted (m) 48、54、60
Min working range (m) 2.5
Max lifting capacity (t) 10
Tip load @ 50m (t) 2.4
Tower Crane TC6024 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC024 Diagram:
\\
Tower Crane TC6024 Technical Sheet:
Tower Crane TC6024 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: Please no direct translations. I need the official name of the whooping crane in French.
- grue de huée
- Q: I loved Dr. Crane and his sexy glasses and eyes. Plus, I just love Cillian Murphy, haha. Is his character back in the Dark Knight, I heard he was...but I was wondering if anybody could confirm it?
- The Joker was hired by the various crime organizations to kill the Batman. He used his criminal genius to concoct an elaborate plan to force Batman to reveal his identity. This would destroy Batman's advantage of anonymity, making it easier to kill him. As it turned out, The Joker didn't want money, he wanted to run Gotham City's criminal underground, Batman and Harvey Dent were in the way. In the Batman comics, the Joker is Batman's arch enemy. Homicidal, and brilliant, he's always looking for a way to kill Batman. Even if it means killing innocents or destroying Gotham City in the process. For all those confused about Joker robbing banks: He only robbed the banks that the criminals had their money in. By doing this, he was sure to get their attention. When Gordon and his crew cracked down on 'the mobs'' assets, Joker was there to lend assistance by eliminating all those that were causing the problems. Mainly Harvey Dent, and Batman, but also the Commissioner, and the judge allowing Dent to prosecute them. Always a couple of steps ahead of most, he knew by asking for half of 'the mob's' money, they'd be weak enough to overtake. The reason Batman completes Joker is because Batman is the only person smart enough to see through his plans. Therefore, it's always a challenge to defeat Batman, but not necessarily kill him.
- Q: Calculate the work the crane performs.
- Crane work = weight to be lifted x 6.95 m Weight to be lifted = 2.75x10^3 N + 1.20 m^3 (2.00 x 10^3 kg/m^3) (9.8) = 2750 + 23520 = 26270 Therefore, Crane work = 26270 x 6.95 = 182576.5 J
- Q: In the Pacific NW, what will get rid of Crane Flies in my yard?
- Crane Flies,aka Mosquito Hawks are beneficial insects and I would not get rid of them.
- Q: well I am making 1000 paper cranes... I am on 18... but how do you string them all together anyone know?
- How To String Paper Cranes
- Q: I was watching house m.d. When I notice house walking with a crane I asked a friend who knows house and has seen it but dosent remember why and how. why is he?
- I dont know how, maybe polio, but he does have a disability.
- Q: I just can't figure this out. They need a crane to assemble tall buildings, but how do they assemble the crane? Especially if the building is over 20 stories high. What crane can build a crane higher than itself?
- a mobile crane sets the original lower sections in place, and then the crane is assembled in 6' sections as it climbs itself.
- Q: What Japanese counter word is used for multiple origami objects...such as 1000 cranes?
- Japanese doesn't use counter / measure words, but rather other grammatical particles. Only Chinese uses counter / measure words.
- Q: What are the necessary safety devices on a tower crane?
- (3) amplitude limiting deviceA crane shall be equipped with a minimum amplitude limiter and a device for preventing the boom from rebounding backward. The trolley must be equipped with a trolley switch and a terminal buffer.(4) rail clamping device and walking spacing deviceTrack type tower cranes must be equipped with rail clamps. A walking limit device shall be installed at the same time.(5) anemometer;For cranes with a hinge height of more than 50m at the root of the boom, a anemometer shall be installed at the top.
- Q: Protected cranes are nesting in pine trees with possible disease carrying bird droppings covering drive way and street where neighborhood children play. I've called several local organizations only to be told there is nothing I can do since they are protected by law. These birds return every year and stay for about 4 months - each year gets worse with droppings and stench. Daily cleaning is required but that still does not keep the areas around them clean.
- Give the U.S. Fish and Wildlife Service a call I'm sure they will help in some way.
Send your message to us
Tower Crane Sales TC6024 Construction Equipment Wholesaler
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords