Name: | RingLock Scaffold System |
Category: | Scaffolding System |
Material: | Steel (Q235/Q345) |
Size: | D48*3.25mm, etc |
Surface: | Electro Galvanized, Hot Dipped Galvanized, Painted, Powder Coated |
Component: | Standard, Ledger, Diagonal Brace, Bracket, Base Jack, U Head Jack, Etc. |
Application: | Slab Support, Staircase, Stage Plateforms, Bridge Support, Mobile Tower, etc. |
Manufacturer: | OEM is Available |
Items or goods can be manufactured according to your standards. |
Advantage
* Good loading capacity
* Easy to assemble and dismantle
* Excellent quality for formwork & scaffolding with wide choices
Other scaffolding & formwork products:
(1) Scaffolding System:
(2) Scaffolding Frame & Accessories:
(3) Scaffolding Couplers/Clamps:
(4) Formwork System Scaffolding & Accessories:
FAQ
Why Us?
We are one of the largest construction materials suppliers in China.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q:I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
- Check with Home Depot or Lowes. you can usually find what you need there.
- Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
- The following model for your reference, the project budget is to determine the project cost and work, material consumption of the document, is the basis for assessing the economic investment
- Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
- (332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
- Q:Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
- scaffolding load shall not exceed 270kg / m
- Q:The obvious would be helpful too!
- Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
- Q:Sprinkling water on the construction helps to help reduce haze days
- Construction site environmental protection measures are as follows: First, the dust management
- Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
- Q:Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
- Steel pipe commonly used specifications for 1m-6m first determine your height and length, width
- Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
- This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
- Q:There is no shelter outside the scaffolding project has been accident accident case
- I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ??5800m2
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Steel Formwork Scaffolding System Formwork System with low price
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 m.t
- Supply Capability:
- 1000 m.t/month
Offcanvas right
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords