Great Reputation Cup Lock Scaffolding From China

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffolding 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc.  for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Cup-lock Scaffolding

.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Not easy to lose fastener, portable firm and easy to maintain and transport


3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

1.GREAT REPUTATION CUP LOCK SCAFFOLDING

2.Three Year Warranty

3.Operating Friendly

4.Full Safety Devices

5.Provide OEM service

6.Reasonable price

 

5.   FAQ of Cup-lock Scaffolding

1) What promises can be done by us?

   . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 3) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

 


 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scaffolding piercing?
Vist the store you got it and tell them instead of us
Q:Can you give some ideas about scaffolding students through a calss that teaches about religion?
Introduce the basic tenets of several major religions, then work through the historical contexts, and finally, explain your religion's belief system. Good Luck....
Q:How can teachers use scaffolding?
You need to relate new class knowledge to old knowledge, and also make learning materials for new activities highly structured, and gradually less structured as you move through the topic.
Q:For engineering scaffolding steel pipe all kinds of fasteners and fastening screws calculation method?
Specification for general practical design expressions"Uniform provisions" according to two kinds of components (bending and axial compression) and two load (no combination of wind load and wind load combination) the general practical design formula of scaffolding structure are given, a total of two groups of 4.
Q:A 51.0 painter is on a uniform 23.0 scaffold supported from above by ropes . There is a 2.0 pail of paint t?
Let the scaffold be extended beyond 1m. Let the man walk beyond the right rope. Now tension in the left rope will be zero, if balanced. No units are given Now to the left of the right rope there are two forces, 1. due to the pail and 2. due to the weight of the scaffold. To the right of the right rope the man is standing at a distance d m from the right rope. Taking moment about the right rope, 23*2 + 2*3 = 51* d d = 1.01 m Since the scaffold has an extension of 1m from the right rope, the man go to the extreme right end of the right rope. ======================================... Suppose he moves to the left of the left rope, then the tension in the right rope is zero Taking moment about the left rope, 51* d = 23*2 + 2*1 d = 0.94 m That is from the left end this distance is 1- 0.94 = 0.06 m ===========================
Q:What are the requirements for the broken seam connection of bowl buckle scaffold. For example, both sides of the seam on the vertical pole is very neat, with steel pipe
Do you mean to do the two adjacent joint? Specification requirements shall not be within the same span and within the same level, specific referenceJGJ 1302011 steel tubular scaffolding construction safety technical specification
Q:What do you think about my industrial/scaffolding piercing?
Your industrial's cute but it definitely is too short for a new piercing. No room for swelling and normal healing...I have an industrial too and my top is lower than yours, making my barbell more slanted. But I still think it looks good.
Q:does scaffolding uses truss or frame?
problematic point. research onto yahoo and bing. that will will help!
Q:Scaffold Piercing ? ? ?
I don't think its a bad idea or anything I was thinking about getting that same piercing but got nose instead + regular cartilage piercing. I'd go for it :)
Q:when must you wear safety harnesses on scaffolding?
At all times.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range