Construction HDG Steel Ringlock Scaffolding System with En12810 Standard CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Construction HDG Steel Ringlock Scaffolding System with En12810 Standard
Type:
Material:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Scaffolding Part Type:
Move Method:
Structural Style:
Surface Treatment:
Certificate:
Color:
Production Capability:
Delivery Time:
Export Markets:
Descriptions of Construction HDG Steel Ringlock Scaffolding System with En12810 Standard
1. Standard:
3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm.
2. Ledger:
3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm.
3. Diagonal brace:
3000x2000mm, 1780x2000mm, 1000x1500mm, 1000x2000mm, 1500x2000mm.
4. Tube specification:
Φ 48.3x4.0mm, φ 48.0 x3.25mm, φ 48.0 x3.0mm.
5. Surface Finish:
Hot DIP Galv. Electric Galv.Powder coating, Dip Painting.
6. Material:
Q235, Q345
7. Certificate:
EN12810,SGS test report for loading capacity.
The Parts of Construction HDG Steel Ringlock Scaffolding System with En12810 Standard
Ringlock System Main Parts | |||
Item NO. | Description | Material | Finish |
1 | Standard | Q345/Q235 | HDG |
2 | Ledger | Q345/Q235 | HDG |
3 | Brace | Q345/Q235 | HDG |
4 | Base Collar | Q235 | HDG |
5 | Base Jack | Q235 | HDG/EP |
6 | U-Head | Q235 | HDG/EP |
7 | Plank | Q235/Q195 | HDG |
8 | Stair | Q235 | HDG |
Stair Guardrail | Q235 | HDG | |
9 | Ladder | Q235 | HDG |
Ladder Bracket | Q235 | HDG |
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q:What is the service life of the mobile scaffolding accessories?
- The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized. 5 years of surface treatment period, and the use of the elimination period, very close to the larger share of the market share.
- Q:i had it done 2/3 months ago, it was fine at first but now on each end i have two lumps on my ear:S there relitavely smal...the size of like a really tiny pea.there really painfull and sore and quite red and sometimes they scab over with yellowy crust [yes i know sounds disguisting]im just a bit worried that its gone all weird or are these normal? am i cleaning it right?
- I had the same situation occur when I got my scaffold/industrial done. I wouldn't be too concerned. The lumps are called hypertrophic scars, and supposedly they are pretty common and are caused by overcleaning, harsh products, or (as I think was my case) general irritation from the jewelry moving repeatedly back and forth through the piercing or being bumped around or rubbed/touched. Mine lasted quite a long time. Try leaving your piercing alone for a couple of days. Then salt water solutions or compresses are supposed to help the lumps to heal, and I also used tea tree oil and neosporine intermittently. Hot compresses like a heated washcloth applied to the area help to reduce the lumps, as well. Sometimes it's recommended to try another type of jewelry, like titanium, or switch temporarily to two separate bars. You might also try finding a really gentle cleanser/soap. I just kept my original piercing, using the above techniques off and on, and after months of the lumps remaining red and sore, they just went away totally. Just keep your eye out for any pussing (hypertrophic scars ooze, but they don't usually pus), increased swelling, and the area feeling very hot- these are signs of infectiona nd you should see your doc right away. Good luck! :)
- Q:Which God can tell me what is required, how to get ah?
- Regardless of the site is the use of their own disc foot accessories, or rental of disc scaffolding accessories, before use should be carried out preliminary calculations, see how many accessories,
- Q:Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q:I'm a civil engineering student and we were asked to submit a paper about designing a simple scaffolding. I just want to see a sample paper so that I would know what details should I include.
- can't draw here, but it's just an x with a flat board on top in 3 dimensions.
- Q:by scaffolding ?
- I'm guessing it is a reference to large breasts. But I could be wrong.
- Q:I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
- A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
- Q:Are the terms quot;nuclear matrixquot; and quot;nuclear scaffoldquot; interchangeable? I know that when we talk about DNA compaction we say that MARs on the DNA attach to the nuclear scaffold. I am wondering if the scaffold is just a specific part of the matrix??
- For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
- Q:scaffolding piercing.. do they hurt? and how much are they in england? thanks x?
- Yes, they hurt, quite a lot. But how rad they look outweighs the pain. :D
- Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
- The outer hanging scaffold board 12 embedded parts embedded in the crack, because the outer hanging scaffold embedded generally should be buried in the beam, and checking of the beam.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Construction HDG Steel Ringlock Scaffolding System with En12810 Standard CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords