Construction Platform Ringlock Modular Scaffolding with En12810 Standard CNBM

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of  Construction Platform Ringlock Modular Scaffolding with En12810 Standard 

  • Type:High Building

  • Material:Steel

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Wall Hanging Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Platform

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Tower Scaffolding

  • Surface Treatment:Hot DIP Galvanized, Galvanized, DIP Painted

  • Certificate:En12810, SGS Test Report for Loading Capacity

  • Color:Silver, Dark Red, Orange

  • Production Capability:100 Tons Per Week

  • Delivery Time:About 20-30 Days After Confirmation

  • Export Markets:Global

  • Construction Platform Ringlock Modular Scaffolding with En12810 Standard CNBM

  • Construction Platform Ringlock Modular Scaffolding with En12810 Standard CNBM

  • Construction Platform Ringlock Modular Scaffolding with En12810 Standard CNBM

  • Descriptions of   Construction Platform Ringlock Modular Scaffolding with En12810 Standard 

  • 1. Standard:
        3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm.
    2. Ledger:
        3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm.
    3. Diagonal brace:
        3000x2000mm, 1780x2000mm, 1000x1500mm, 1000x2000mm, 1500x2000mm.
    4. Tube specification:
        Φ 48.3x4.0mm, φ 48.0 x3.25mm, φ 48.0 x3.0mm.
    5. Surface Finish:
        Hot DIP Galv. Electric Galv.Powder coating, Dip Painting.
    6. Material:
        Q235, Q345
    7. Certificate: 
        EN12810,SGS test report for loading capacity.

The Parts of   Construction Platform Ringlock Modular Scaffolding with En12810 Standard 

3.00m  standardQ345  48.3*3.2mm1.00 15.3Hot-dipped  Galvanized
2.50m  standardQ345  48.3*3.2mm1.00 12.9Hot-dipped  Galvanized
2.00m  standardQ345  48.3*3.2mm1.00 10.5Hot-dipped  Galvanized
1.50m  standardQ345  48.3*3.2mm1.00 8.1Hot-dipped  Galvanized
1.00m  standardQ345  48.3*3.2mm1.00 5.7Hot-dipped  Galvanized
0.50m  standardQ345  48.3*3.2mm1.00 3.3Hot-dipped  Galvanized
2.00m  ledgerQ345  48.3*2.5mm1.00 6.8Hot-dipped  Galvanized
1.80m  ledgerQ345  48.3*2.5mm1.00 6.2Hot-dipped  Galvanized
1.50m  ledgerQ345  48.3*2.5mm1.00 5.3Hot-dipped  Galvanized
1.20m  ledgerQ345  48.3*2.5mm1.00 4.4Hot-dipped  Galvanized
0.90m  ledgerQ345  48.3*2.5mm1.00 3.5Hot-dipped  Galvanized
0.60m  ledgerQ345  48.3*2.5mm1.00 2.6Hot-dipped  Galvanized
2.00*2.00m  braceQ235  33.5*2.3mm1.00 7Hot-dipped  Galvanized
1.80*2.00m  braceQ235  33.5*2.3mm1.00 6.7Hot-dipped  Galvanized
1.50*2.00m  braceQ235  33.5*2.3mm1.00 6.4Hot-dipped  Galvanized
1.20*2.00m  braceQ235  33.5*2.3mm1.00 6.1Hot-dipped  Galvanized
2.00*1.50m  braceQ235  33.5*2.3mm1.00 6.3Hot-dipped  Galvanized
1.80*1.50m  braceQ235  33.5*2.3mm1.00 6Hot-dipped  Galvanized
1.50*1.50m  braceQ235  33.5*2.3mm1.00 5.6Hot-dipped  Galvanized
1.20*1.50m  braceQ235  33.5*2.3mm1.00 5.2Hot-dipped  Galvanized
0.90*1.50m  braceQ235  33.5*2.3mm1.00 4.9Hot-dipped  Galvanized
0.60*1.50m  braceQ235  33.5*2.3mm1.00 4.7Hot-dipped  Galvanized
2.00*1.00m  braceQ235  33.5*2.3mm1.00 5.8Hot-dipped  Galvanized
1.80*1.00m  braceQ235  33.5*2.3mm1.00 5.4Hot-dipped  Galvanized
1.50*1.00m  braceQ235  33.5*2.3mm1.00 4.9Hot-dipped  Galvanized
1.20*1.00m  braceQ235  33.5*2.3mm1.00 4.5Hot-dipped  Galvanized
0.90*1.00m  braceQ235  33.5*2.3mm1.00 4.1Hot-dipped  Galvanized
0.60*1.00m  braceQ235  33.5*2.3mm1.00 3.8Hot-dipped  Galvanized
2.00*2.00m  braceQ345  48.3*2.5mm1.00 10.2Hot-dipped  Galvanized
1.80*2.00m  braceQ345  48.3*2.5mm1.00 9.8Hot-dipped  Galvanized
1.50*2.00m  braceQ345  48.3*2.5mm1.00 9.2Hot-dipped  Galvanized
1.20*2.00m  braceQ345  48.3*2.5mm1.00 8.8Hot-dipped  Galvanized
2.00*1.50m  braceQ345  48.3*2.5mm1.00 9.1Hot-dipped  Galvanized
1.80*1.50m  braceQ345  48.3*2.5mm1.00 8.7Hot-dipped  Galvanized
1.50*1.50m  braceQ345  48.3*2.5mm1.00 8Hot-dipped  Galvanized
1.20*1.50m  braceQ345  48.3*2.5mm1.00 7.4Hot-dipped  Galvanized
0.90*1.50m  braceQ345  48.3*2.5mm1.00 7Hot-dipped  Galvanized
0.60*1.50m  braceQ345  48.3*2.5mm1.00 6.6Hot-dipped  Galvanized
2.00*1.00m  braceQ345  48.3*2.5mm1.00 8.3Hot-dipped  Galvanized
1.80*1.00m  braceQ345  48.3*2.5mm1.00 7.7Hot-dipped  Galvanized
1.50*1.00m  braceQ345  48.3*2.5mm1.00 7Hot-dipped  Galvanized
1.20*1.00m  braceQ345  48.3*2.5mm1.00 6.2Hot-dipped  Galvanized
0.9*1m  braceQ345  48.3*2.5mm1.00 5.6Hot-dipped  Galvanized
0.6*1m  braceQ345  48.3*2.5mm1.00 5.2Hot-dipped  Galvanized
0.88m  board  bracketQ345  48.3*2.5mm1.00 9.5Hot-dipped  Galvanized
0.60m  base  collar  downQ235  38.1*4.5mm1.00 4.4Hot-dipped  Galvanized
0.60m  base  collar  upQ235  38.1*4.5mm1.00 5.2Hot-dipped  Galvanized
0.24*2.00m  PlankDX51D-Z801.00 8.2Hot-dipped  Galvanized
0.24*1.80m  PlankDX51D-Z801.00 7.5Hot-dipped  Galvanized
0.24*1.50m  PlankDX51D-Z801.00 6.5Hot-dipped  Galvanized
0.24*1.20m  PlankDX51D-Z801.00 5.5Hot-dipped  Galvanized
0.24*0.90m  PlankDX51D-Z801.00 4.5Hot-dipped  Galvanized
0.50*2.00m  PlankDX51D-Z801.00 15.3Hot-dipped  Galvanized
0.50*1.80m  PlankDX51D-Z801.00 14Hot-dipped  Galvanized
0.50*1.50m  PlankDX51D-Z801.00 11.9Hot-dipped  Galvanized
0.50*1.20m  PlankDX51D-Z801.00 9.9Hot-dipped  Galvanized
0.50*0.90m  PlankDX51D-Z801.00 7.9Hot-dipped  Galvanized
  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:scaffold, where to buy?
Unless you need it constantly it might be cheaper to rent as most contractors do. Home Depot, Safeway Rentals or most any tool and equipment rental outfit rents it at pretty reasonable rates.
Q:How to maintain the scaffold after use
Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q:Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
PoleName specification A (mm) B (mm) theoretical weight (kg)Riser LG-60 6004LG-120 12007.41LG-180 180010.67LG-240 240014.02LG-300 300017.31
Q:Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q:How old do you have to be to have your hip peirced and scaffolding?
In all honestly, I'd try to talk your friend out of getting that hip piercing. Surface piercings, especially one there, Will reject. I don't mean to sound negative, but have her put two dots where she would want the piercing, and move around as she does daily, she will see how much that area moves. The more movement = the less likely it will heal. They could reject after a month, they could reject after two years. It really depends. No matter how well the piercer, or how well she takes care of it, it will reject. I went to the best piercers in state to get my surface work (sternum, nape) done. I also took care of it by doing sea salt soaks once or twice a day. When that didn't work I used the LITHA (leave it the hell alone) method.The sternum rejected in six months, where the nape was doing great up until that two year mark. Then it started rejecting. If you want to see what a rejecting piercing looks like feel free to send me an Email, I have some pics of my sternum piercing early on - when it started rejecting, then a day or two before I took it out. It honestly looked horrible that few days before I took it out. The piercing place I go to won't do surface piercings on minors, so you have to be 18 for that one in Minnesota. For the scaffold/industrial, you have to be 16 with parental consent and 18 without in the United States.
Q:Piercing question: How do I know what size industrial/scaffold bar to get?
as always,size does matter. the bigger,the better. go with the biggest size you can get. if they have it in extra huge,this is the size you want.
Q:Fastener type steel pipe scaffold accessories
Foot plateThe foot board can be made of steel, wood, bamboo and other materials, each quality should not be greater than 30kg. Stamping steel foot board is commonly used as a foot board, usually with thick 2mm steel plate pressing, length 2-4m, width 250mm, the surface should be anti slip measures. Wooden feet can be used for the thickness of not less than 50mm of cedar wood or pine production, length 3~4m, width 200-250mm, both ends should be equipped with galvanized steel hoop two, in order to prevent the end of the wooden hand foot damage.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range