• Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM System 1
  • Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM System 2
  • Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM System 3
Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM

Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Construction Ringlock Scaffolding Items/Components with En12810 Standard

  • Type:High Building

  • Material:Steel

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Wall Hanging Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Platform

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Tower Scaffolding

  • Surface Treatment:Hot DIP Galvanized, Galvanized, DIP Painted

  • Certificate:En12810, SGS Test Report for Loading Capacity

  • Color:Silver, Dark Red, Orange

  • Production Capability:100 Tons Per Week

  • Delivery Time:About 20-30 Days After Confirmation

  • Export Markets:Global

  • Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM

  • Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM


  • Construction Ringlock Scaffolding Items/Components with En12810 Standard CNBM

  • Descriptions of Construction Ringlock Scaffolding Items/Components with En12810 Standard

  • 1. Standard:
        3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm.
    2. Ledger:
        3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm.
    3. Diagonal brace:
        3000x2000mm, 1780x2000mm, 1000x1500mm, 1000x2000mm, 1500x2000mm.
    4. Tube specification:
        Φ 48.3x4.0mm, φ 48.0 x3.25mm, φ 48.0 x3.0mm.
    5. Surface Finish:
        Hot DIP Galv. Electric Galv.Powder coating, Dip Painting.
    6. Material:
        Q235, Q345
    7. Certificate: 
        EN12810,SGS test report for loading capacity.

The Parts of Construction Ringlock Scaffolding Items/Components with En12810 Standard

Ringlock System Main Parts
Item NO.Description MaterialFinish
1StandardQ345/Q235HDG
2LedgerQ345/Q235HDG
3BraceQ345/Q235HDG
4Base CollarQ235HDG
5Base JackQ235HDG/EP
6U-HeadQ235HDG/EP
7PlankQ235/Q195HDG
8StairQ235HDG
Stair GuardrailQ235HDG
9LadderQ235HDG
Ladder BracketQ235HDG


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:What are the characteristics of disc scaffolding
The Pankou scaffolding 60 heavy support frame as an example, the height of 5 meters of the single pole of the allowable bearing capacity of 9.5 tons, the failure load reached 19 tons, is 2-3 times of traditional products. Advanced technology: disc scaffolding connection disc to the rod force through the center node is mainly used in Europe, countries and regions, is the rise in price replacement products, the scaffold is firm, stable structure of disc type scaffold material upgrade: the main materials used in low alloy structural steel (GB Q345), strength higher than the traditional carbon steel tube scaffold (GB Q235) 1.5-2 times
Q:Electric basket accessories are generic
Electric basket full name is called electric gondola, the construction of electric basket is mainly suitable for high-rise buildings on the electric power from the electric hoist special basket, basket accessories have what those:
Q:The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
Schedule A.0.2 role: the calculation of scaffolding, the need to calculate the bearing capacity of the scaffolding
Q:What are the requirements for the construction of the scaffold eye in the building?
SelectionThe project uses 48 mm, 3.5mm wall thickness steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, etc.. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness of steel pipe and the corresponding fasteners, mainly with 1 x 1.0m, 1.2 x 1.2m, 1.5 x 1.5m and other specifications. Foot board mainly 2M and 3M two.
Q:Because my friend wants it done but isn't sure :)
probably 18. depends on your state. look it up or ask them.
Q:I think that'd be extremely entertaining.
new jack dont want to work with wwe
Q:So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
i got mine (industrial) almost 8 years ago and it cost me $42. it hurt, they do it with one needle and just go straight across your ear. my mom nearly cried when she saw it. it feels really hot and sore after you get it and you have to constantly turn the bar in your ear to prevent infection and a keloid scar. i had a keloid scar on my ear from it and when i started working i was asked to take it out. it smells funny sometimes but i loved having it. kinda miss it now. good luck! xo
Q:Okay so I got a scaffold piercing about 5 days ago now. I've been cleaning it with Claire's piercing stuff. What I do is I pour it onto a little bit of loo roll and squeeze it all out on where the holes are. I have not been twisting it at all, but my friend told me that I should soak it in warm salty water and twist it twice a day. I have no idea what to do now as I have researched it and some people say that I shouldn't twist it because it will drag more bacteria into it and could get it infected. Also I have massive scabs around both ends of the bar, I've tried to pick them off as they are pretty uncomfortable, but it didn't work as they are rock solid, so how do I get these off? I have no idea what to do, my piercer didn't say anything about twisting it just cleaning it twice a day. Oh and if it helps I'm 13:) Thanks. X
Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
Q:Which kind of scaffolding is the most convenient and time-saving?
3, low cost (can speed up the construction schedule, shorten the construction period), large spatial scaffolding in the same condition, the new building quick dismantling scaffold material ratio of bowl type multifunctional scaffold, the same specifications of single member weight than the bowl type multifunctional scaffolding light.
Q:If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords